The No. 1 headlight ECU sub-assemblies operate the headlight leveling motors according to the vehicle conditions.
If the No. 1 headlight ECU sub-assembly LH has been replaced, it is necessary to synchronize the vehicle information and initialize the No. 1 headlight ECU sub-assembly LH.
Click hereVehicle Exterior>LIGHTING (EXT)>AUTOMATIC HEADLIGHT BEAM LEVEL CONTROL SYSTEM>INITIALIZATION
Connect the GTS to the DLC3.
Turn the power switch on (READY).
Turn the GTS on.
Enter the following menus: Body Electrical / HL AutoLeveling / Active Test.
Perform the Active Test according to the display on the GTS.
| Tester Display | Measurement Item | Control Range | Diagnostic Note |
|---|---|---|---|
| Drive The Leveling Motor | Headlight leveling motor upward or downward operation | Stop/Down/Up | Perform the Active Test with the power switch is on (READY) and vehicle stopped |
| Tester Display |
|---|
| Drive The Leveling Motor |
Headlight leveling motors operate normally.
| Result | Proceed to |
|---|---|
| OK | A |
| NG (for LH Side) | B |
| NG (for RH Side) | C |
A
Click hereVehicle Exterior>LIGHTING (EXT)>AUTOMATIC HEADLIGHT BEAM LEVEL CONTROL SYSTEM>PROBLEM SYMPTOMS TABLE
B
C
Remove the headlight assembly LH.
Click hereVehicle Exterior>LIGHTING (EXT)>HEADLIGHT ASSEMBLY>REMOVAL
Remove the headlight unit assembly LH from the headlight assembly LH.
Click hereVehicle Exterior>LIGHTING (EXT)>HEADLIGHT ASSEMBLY>DISASSEMBLY
| *a | Component without harness connected
(to Headlight Leveling Motor LH) |
| *b | Component without harness connected
(to No. 1 Headlight ECU Sub-assembly LH) |
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| B-7 (ACTBI) - E-3 | Always | Below 1 Ω |
| B-8 (ACTSI) - E-2 | Always | Below 1 Ω |
| B-17 (ACTGI) - E-1 | Always | Below 1 Ω |
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Replace the headlight leveling motor LH with a new or known good one.
Click hereVehicle Exterior>LIGHTING (EXT)>HEADLIGHT ASSEMBLY>DISASSEMBLY
Perform the Active Test according to the display on the GTS.
| Tester Display | Measurement Item | Control Range | Diagnostic Note |
|---|---|---|---|
| Drive The Leveling Motor | Headlight leveling motor upward or downward operation | Stop/Down/Up | Perform the Active Test with the power switch is on (READY) and vehicle stopped |
| Tester Display |
|---|
| Drive The Leveling Motor |
Headlight leveling motor LH operate normally.
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Remove the headlight assembly RH.
Click hereVehicle Exterior>LIGHTING (EXT)>HEADLIGHT ASSEMBLY>REMOVAL
Remove the headlight unit RH from the headlight assembly RH.
Click hereVehicle Exterior>LIGHTING (EXT)>HEADLIGHT ASSEMBLY>DISASSEMBLY
| *a | Component without harness connected
(to Headlight Leveling Motor RH) |
| *b | Component without harness connected
(to No. 1 Headlight ECU Sub-assembly RH) |
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| B-7 (ACTBI) - E-3 | Always | Below 1 Ω |
| B-8 (ACTSI) - E-2 | Always | Below 1 Ω |
| B-17 (ACTGI) - E-1 | Always | Below 1 Ω |
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Replace the headlight leveling motor RH with a new or known good one.
Click hereVehicle Exterior>LIGHTING (EXT)>HEADLIGHT ASSEMBLY>DISASSEMBLY
Perform the Active Test according to the display on the GTS.
| Tester Display | Measurement Item | Control Range | Diagnostic Note |
|---|---|---|---|
| Drive The Leveling Motor | Headlight leveling motor upward or downward operation | Stop/Down/Up | Perform the Active Test with the power switch is on (READY) and vehicle stopped |
| Tester Display |
|---|
| Drive The Leveling Motor |
Headlight leveling motor RH operate normally.
| Proceed to |
|---|
| OK |
| NG |
OK
NG