INSTALLATION
Removal / installation · Vehicles built Nov 2005 – Dec 2006
Versions by build date: Nov 2005 – Dec 2006 Jan 2007 – Jul 2007 from Aug 2007
| 1. INSTALL TRANSFER ASSEMBLY |
![]() ![]() |
Install the transfer to the transaxle with the 6 nuts and 2 bolts.
- Torque:
- 69 N*m{ 700 kgf*cm , 51 ft.*lbf }
| 2. INSTALL REAR ENGINE MOUNTING BRACKET |
for U140F:
Install the rear engine mounting bracket (Click here).
for E352F:
Install the rear engine mounting bracket (Click here).
for EA64F:
Install the rear engine mounting bracket (Click here).
| 3. INSTALL ENGINE ASSEMBLY WITH TRANSAXLE |
for 1AZ-FE:
Install the engine with transaxle (Click here).
for 2AZ-FE:
Install the engine with transaxle (Click here).
for 2AD-FTV:
Install the engine with transaxle (Click here).
for 2AD-FHV:
Install the engine with transaxle (Click here).
| 4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |


