2005-2008 RAV4 · Service Manual TRANSMISSION

INSTALLATION

Removal / installation · Vehicles built Nov 2005 – Dec 2006

Versions by build date: Nov 2005 – Dec 2006 Jan 2007 – Jul 2007 from Aug 2007


1. INSTALL TRANSFER ASSEMBLY

C126622
  1. Install the transfer to the transaxle with the 6 nuts and 2 bolts.

    Torque:
    69 N*m{ 700 kgf*cm , 51 ft.*lbf }


2. INSTALL REAR ENGINE MOUNTING BRACKET

C129379
  1. Install the mounting bracket to the transaxle with the 4 bolts.

    Torque:
    45 N*m{ 459 kgf*cm , 33 ft.*lbf }


3. INSTALL FRONT ENGINE MOUNTING BRACKET

C129225
  1. Install the mounting bracket to the transaxle with the 3 bolts.

    Torque:
    64 N*m{ 653 kgf*cm , 47 ft.*lbf }


4. INSTALL MANUAL TRANSAXLE ASSEMBLY

C116719E02
  1. Align the input shaft with the clutch disc and install the transaxle to the engine.

  1. Install the 10 bolts.

    Torque:
    46 N*m{ 469 kgf*cm , 34 ft.*lbf } for bolt A
    64 N*m{ 653 kgf*cm , 47 ft.*lbf } for bolt B


5. INSTALL STIFFENER PLATE RH

C127241
  1. Install the stiffener plate with the 4 bolts.

    Torque:
    46 N*m{ 469 kgf*cm , 34 ft.*lbf }


6. INSTALL STIFFENER PLATE LH

C127240
  1. Install the stiffener plate with the 4 bolts.

    Torque:
    46 N*m{ 469 kgf*cm , 34 ft.*lbf }


7. INSTALL OIL PAN INSULATOR

C127239
  1. Install the insulator with the 2 bolts.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }


8. INSTALL ENGINE MOUNTING BRACKET LH

C129227
  1. Install the mounting bracket to the transaxle with the 4 bolts.

    Torque:
    64 N*m{ 653 kgf*cm , 47 ft.*lbf }


9. INSTALL ENGINE ASSEMBLY WITH MANUAL TRANSAXLE
  1. for 2AD-FTV:
    Install the engine with manual transaxle (Click here).

  1. for 2AD-FHV:
    Install the engine with manual transaxle (Click here).


10. INSTALL TRANSAXLE CONTROL CABLE ASSEMBLY

C127238E02
  1. Connect the 2 cable ends with the 2 washers and 2 clips.

  1. Install 2 new clips to the control cable bracket.


11. INSTALL STARTER ASSEMBLY
  1. for 2AD-FTV:
    Install the starter (Click here).

  1. for 2AD-FHV:
    Install the starter (Click here).


12. INSTALL CLUTCH RELEASE CYLINDER ASSEMBLY
  1. Install the starter (Click here).


13. INSTALL BACK-UP LIGHT SWITCH ASSEMBLY
  1. Install the back-up light switch and gasket to the manual transaxle case.

    Torque:
    40 N*m{ 410 kgf*cm , 30 ft.*lbf }

  1. D026905E01
    Connect the back-up light switch connector.


14. ADD TRANSAXLE OIL

15. INSPECT TRANSAXLE OIL
  1. Stop the vehicle in a level place.

  1. Remove the transmission filler plug and the gasket.

  1. D025304E21
    Check that the oil level is between 0 to 5 mm (0 to 0.20 in.) from the bottom lip of the filler plug opening. If the result is not as specified, add transmission oil.

    Oil grade:
    GL-4
    Viscosity:
    SAE 75W
    Standard capacity:
    2.1 liters (2.2 US qts, 1.8 Imp. qts)

    NOTICE:
    1. Too much or too little oil may cause trouble.
    2. After adjusting the oil level, drive the vehicle and check the oil level again.

  1. Check for oil leakage if the oil level is low.

  1. Install the transmission filler plug and a new gasket.

    Torque:
    39 N*m{ 400 kgf*cm , 29 ft.*lbf }


16. ADD TRANSFER OIL

17. INSPECT TRANSFER OIL

  1. C110905
    Remove the transfer case plug No. 2 (for filler) and gasket.

  1. Check that the oil level is between 0 to 5.0 mm (0 to 0.20 in.) from the bottom lip of the case plug (for filler) hole.
    If the result is not as specified, add transfer oil.

    Oil grade:
    GL-5

    Viscosity:
    SAE 80W-90

    Standard capacity:
    0.45 liter (0.48 US qts, 0.40 Imp. qts)

    NOTICE:
    1. When adding oil, pour it slowly.
    2. Too much or too little oil will lead to transfer problems.

  1. When the oil level is too low, check for oil leakage.

  1. Install a new gasket into the case plug (for filler) and then tighten the plug.

    Torque:
    39 N*m{ 398 kgf*cm , 28 ft.*lbf }


18. INSTALL FRONT WHEEL

Torque:
103 N*m{ 1,050 kgf*cm , 76 ft.*lbf }


19. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
← REMOVAL (from Aug 2007)INSTALLATION (Jan 2007 – Jul 2007) →