2005-2008 RAV4 · Service Manual TRANSMISSION

INSTALLATION

Removal / installation · Vehicles built Nov 2005 – Dec 2006

Versions by build date: Nov 2005 – Dec 2006 Jan 2007 – Jul 2007 from Aug 2007


1. INSPECT TORQUE CONVERTER CLUTCH ASSEMBLY
  1. Inspect the torque converter (Click here).


2. INSTALL TORQUE CONVERTER CLUTCH ASSEMBLY
  1. Install the torque converter clutch to the automatic transaxle.

  1. C083051E01
    Using a vernier caliper, measure dimension A between the transaxle and the end surface of the drive plate.

  1. C065911E01
    Using a vernier caliper and straightedge, measure the dimension B shown in the illustration and check that B is greater than A.

    Standard dimension:
    A + 1.0 mm (0.039 in.) or more


3. INSTALL NO. 1 TRANSMISSION CONTROL CABLE BRACKET

C133011E01
  1. Install the cable bracket with the 2 bolts.

    Torque:
    12 N*m{ 122 kgf*cm , 9 ft.*lbf }


4. INSTALL TRANSMISSION OIL FILLER TUBE SUB-ASSEMBLY

C133010E01
  1. Install the filler tube with the bolt.

  1. Install the filler tube with the bolt.

    Torque:
    5.5 N*m{ 56 kgf*cm , 49 in.*lbf }

  1. Install the ATF dipstick.


5. INSTALL AUTOMATIC TRANSAXLE ASSEMBLY

C127822E01
  1. Install the automatic transaxle with the 5 upper side mounting bolts to the engine.

    Torque:
    64 N*m{ 653 kgf*cm , 47 ft.*lbf } for bolt A
    46 N*m{ 469 kgf*cm , 34 ft.*lbf } for bolt B

  1. C127820
    Install the 4 lower side mounting bolts.

    Torque:
    37 N*m{ 377 kgf*cm , 27 ft.*lbf }

  1. C129381
    Install the 6 torque converter clutch mounting bolts.

    Torque:
    41 N*m{ 418 kgf*cm , 30 ft.*lbf }

    HINT:
    First install the green colored bolt and then the 5 bolts.

  1. Install the flywheel housing under cover.


6. INSTALL TRANSFER ASSEMBLY
  1. Install the transfer (Click here).


7. INSTALL ENGINE MOUNTING BRACKET LH

C129380
  1. Install the mounting bracket with the 3 bolts.

    Torque:
    64 N*m{ 653 kgf*cm , 47 ft.*lbf }


8. INSTALL ENGINE MOUNTING BRACKET FR

C130924
  1. w/ Warmer:
    Install the mounting bracket with the 3 bolts.

    Torque:
    64 N*m{ 653 kgf*cm , 47 ft.*lbf }

  1. C130912
    for Water cooled:
    Install the mounting bracket with the 4 bolts.

    Torque:
    64 N*m{ 653 kgf*cm , 47 ft.*lbf } for 14 mm head bolt

    Torque:
    12 N*m{ 122 kgf*cm , 9 ft.*lbf } for 12 mm head bolt


9. INSTALL ENGINE MOUNTING BRACKET RR

C130913
  1. Install the mounting bracket with the 3 bolts.

    Torque:
    45 N*m{ 459 kgf*cm , 33 ft.*lbf }


10. INSTALL TRANSMISSION OIL COOLER (w/ Warmer)
  1. Install the oil cooler (Click here).


11. INSTALL TRANSMISSION OIL COOLER HOSE AND TUBE (for Water Cooled)
  1. Install the oil cooler hoses and tube (Click here).


12. CONNECT WIRE HARNESS

C127821
  1. Connect the wire harness clamps.

  1. Connect the 2 speed sensor connectors.

  1. Connect the transaxle wire connector.

  1. Connect the park/neutral position switch connector.


13. INSTALL STARTER ASSEMBLY

A124921
  1. Install the starter with the 2 bolts.

    Torque:
    37 N*m{ 377 kgf*cm , 27 ft.*lbf }

  1. A124920
    Connect the starter wire with the nut.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }

  1. Connect the starter connector.

  1. Install the terminal nut and cover the nut with the cap.

    Torque:
    9.8 N*m{ 100 kgf*cm , 7 in.*lbf }


14. INSTALL ENGINE ASSEMBLY WITH TRANSAXLE
  1. for 1AZ-FE:
    Install the engine with transaxle (Click here).

  1. for 2AZ-FE:
    Install the engine with transaxle. (Click here).


15. ADD AUTOMATIC TRANSAXLE FLUID

Fluid type:
Toyota Genuine ATF WS


16. INSPECT AUTOMATIC TRANSAXLE FLUID
  1. Inspect the automatic transaxle fluid (Click here).


17. PERFORM RESET MEMORY
  1. Perform the RESET MEMORY procedures (A/T initialization) (Click here).

← REMOVAL (from Aug 2007)INSTALLATION (Jan 2007 – Jul 2007) →