Home › Power Source / Network › 3ZR-FAE BATTERY / CHARGING › GENERATOR › from 2015.10
RM3090E _57 Power Source / Network _008394 3ZR-FAE BATTERY / CHARGING _0046853 GENERATOR A

3ZR-FAE BATTERY / CHARGING  GENERATOR  INSTALLATION  


PROCEDURE

Hide 27020 1.INSTALL GENERATOR ASSEMBLY

a.

Install the wire harness clamp bracket with the bolt.

Torque:
7.7 N*m (79 kgf*cm, 68 in.*lbf)


b.

Temporarily install the generator assembly and No. 2 generator bracket with the 3 bolts.


c.
A350691C01
1.438,1.104 1.573,1.292 0.135,0.188 10 true 2 0.885,0.979 1.042,1.177 0.156,0.198 10 true 1 2.031,1.844 2.188,2.042 0.156,0.198 10 true 3
V100135

Bolt A
V100136

Bolt B


Tighten the 3 bolts in the order shown in the illustration to install the generator assembly and No. 2 generator bracket.

Torque:
for bolt A : 43 N*m (438 kgf*cm, 32 ft.*lbf)
for bolt B : 25 N*m (255 kgf*cm, 18 ft.*lbf)


d.

Connect the wire harness to terminal B with the nut.

Torque:
9.8 N*m (100 kgf*cm, 87 in.*lbf)


e.

Install the terminal cap.


f.

Connect the connector and attach the wire harness clamp.


Hide 4.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:

When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION


Hide 51443 5.INSTALL REAR ENGINE UNDER COVER RH

Hide 51441 6.INSTALL NO. 1 ENGINE UNDER COVER

Hide 11212 7.INSTALL NO. 2 CYLINDER HEAD COVER