The headlight ECU sub-assembly operates using the power source voltage input from the IG terminal and ECUB terminal.
The power source voltage of the ECUB terminal is supplied when the main body ECU (multiplex network body ECU) turns the ECUB power supply relay (H-LP LH relay and H-LP RH relay) to ON.
The headlight ECU sub-assembly compares the power source voltage supply condition of the IG terminal and ECUB terminal and monitors the result.
| DTC No. | Detection Item | DTC Detection Condition | Trouble Area | DTC Output from | Note |
|---|---|---|---|---|---|
| B242F | Open in B Power Line | Detection condition:
The ignition switch is ON Malfunction status:
No power source voltage supplied to ECUB terminal while power source voltage being supplied to IG terminal Malfunction duration:
10 seconds or more |
·
Headlight ECU sub-assembly LH ·
Harness or connector ·
H-LP LH relay ·
Instrument panel junction block assembly ·
Main body ECU (multiplex network body ECU) |
HL AutoLeveling | - |
| DTC No. | Detection Item | DTC Detection Condition | Trouble Area | DTC Output from | Note |
|---|---|---|---|---|---|
| B242F | Open in B Power Line | Detection condition:
The ignition switch is ON Malfunction status:
No power source voltage supplied to ECUB terminal while power source voltage being supplied to IG terminal Malfunction duration:
10 seconds or more |
·
Headlight ECU sub-assembly RH ·
Harness or connector ·
H-LP RH relay ·
Main body ECU (multiplex network body ECU) |
HL AutoLeveling (Sub) | - |
Inspect the fuses for circuits related to this system before performing the following procedure.
w/ Entry and Start System:
Before replacing the main body ECU (multiplex network body ECU), refer to Service Bulletin.
If the headlight ECU sub-assembly LH has been replaced, it is necessary to synchronize the vehicle information and initialize the headlight ECU sub-assembly LH.
Click hereVehicle Exterior>LIGHTING (EXT)>LIGHTING SYSTEM>INITIALIZATION
Connect the GTS to the DLC3.
Turn the ignition switch to ON.
Turn the GTS on.
Enter the following menus: Body Electrical / HL AutoLeveling or HL AutoLeveling (Sub) / Clear DTCs.
Clear the DTCs.
| Proceed to |
|---|
| NEXT |
NEXT
Connect the GTS to the DLC3.
Turn the ignition switch to ON.
Wait 10 seconds or more.
Turn the GTS on.
Enter the following menus: Body Electrical / HL AutoLeveling or HL AutoLeveling (Sub) / Trouble Codes.
Check for DTCs.
DTC B242F is not output.
| Result | Proceed to |
|---|---|
| OK | A |
| NG (DTC output from headlight ECU sub-assembly LH) | B |
| NG (DTC output from headlight ECU sub-assembly RH) | C |
A
Click hereGeneral>INTRODUCTION>HOW TO TROUBLESHOOT ECU CONTROLLED SYSTEMS>HOW TO PROCEED WITH TROUBLESHOOTING
B
C
| *a | Front view of wire harness connector
(to Headlight ECU Sub-assembly LH) |
Disconnect the headlight ECU sub-assembly LH connector.
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Switch Condition | Specified Condition |
|---|---|---|
| A11-13 (ECUB) - Body ground | Ignition switch ON | 11 to 14 V |
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Disconnect the headlight ECU sub-assembly LH connector.
| *a | Front view of wire harness connector
(to Headlight ECU Sub-assembly LH) |
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| A11-12 (GND) - Body ground | Always | Below 1 Ω |
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Remove the H-LP LH relay.
Inspect the H-LP LH relay.
Click hereVehicle Exterior>LIGHTING (EXT)>RELAY>ON-VEHICLE INSPECTION
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Remove the H-LP LH relay.
Disconnect the A11 headlight ECU sub-assembly LH connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| 3 (H-LP LH relay) - A11-13 (ECUB) | Always | Below 1 Ω |
| 3 (H-LP LH relay) or A11-13 (ECUB) - Body ground | Always | 10 kΩ or higher |
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Remove the H-LP LH relay.
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Switch Condition | Specified Condition |
|---|---|---|
| 2 (H-LP LH relay) - Body ground | Ignition switch off | 11 to 14 V |
| 5 (H-LP LH relay) - Body ground | Ignition switch off | 11 to 14 V |
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Remove the H-LP LH relay.
Disconnect the 4F instrument panel junction block assembly connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| 1 (H-LP LH relay) - 4F-31 | Always | Below 1 Ω |
| 1 (H-LP LH relay) or 4F-31 - Body ground | Always | 10 kΩ or higher |
| Proceed to |
|---|
| OK |
| NG |
OK
NG
| *a | Component without harness connected
(Instrument Panel Junction Block Assembly) |
- | - |
Remove the instrument panel junction block assembly.
for LHD:
Click herePower Source / Network>POWER DISTRIBUTION>MAIN BODY ECU (for LHD)>REMOVAL
for RHD:
Click herePower Source / Network>POWER DISTRIBUTION>MAIN BODY ECU (for RHD)>REMOVAL
Remove the main body ECU (multiplex network body ECU) from the instrument panel junction block assembly.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| 4F-31 - A-15 (HRLY) | Always | Below 1 Ω |
| Proceed to |
|---|
| OK |
| NG |
OK
for LHD:
Click herePower Source / Network>POWER DISTRIBUTION>MAIN BODY ECU (for LHD)>REMOVAL
for RHD:
Click herePower Source / Network>POWER DISTRIBUTION>MAIN BODY ECU (for RHD)>REMOVAL
NG
for LHD:
Click herePower Source / Network>POWER DISTRIBUTION>MAIN BODY ECU (for LHD)>REMOVAL
for RHD:
Click herePower Source / Network>POWER DISTRIBUTION>MAIN BODY ECU (for RHD)>REMOVAL
| *a | Front view of wire harness connector
(to Headlight ECU Sub-assembly RH) |
Disconnect the headlight ECU sub-assembly RH connector.
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Switch Condition | Specified Condition |
|---|---|---|
| A12-13 (ECUB) - Body ground | Ignition switch ON | 11 to 14 V |
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Disconnect the headlight ECU sub-assembly RH connector.
| *a | Front view of wire harness connector
(to Headlight ECU Sub-assembly RH) |
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| A12-12 (GND) - Body ground | Always | Below 1 Ω |
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Remove the H-LP RH relay.
Inspect the H-LP RH relay.
Click hereVehicle Exterior>LIGHTING (EXT)>RELAY>ON-VEHICLE INSPECTION
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Remove the H-LP RH relay.
Disconnect the A12 headlight ECU sub-assembly RH connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| 3 (H-LP RH relay) - A12-13 (ECUB) | Always | Below 1 Ω |
| 3 (H-LP RH relay) or A12-13 (ECUB) - Body ground | Always | 10 kΩ or higher |
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Remove the H-LP RH relay.
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Switch Condition | Specified Condition |
|---|---|---|
| 2 (H-LP RH relay) - Body ground | Ignition switch off | 11 to 14 V |
| 5 (H-LP RH relay) - Body ground | Ignition switch off | 11 to 14 V |
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Remove the H-LP RH relay.
Disconnect the G44 main body ECU (multiplex network body ECU) connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| 1 (H-LP RH relay) - G44-12 (HRY2) | Always | Below 1 Ω |
| 1 (H-LP RH relay) or G44-12 (HRY2) - Body ground | Always | 10 kΩ or higher |
| Proceed to |
|---|
| OK |
| NG |
OK
for LHD:
Click herePower Source / Network>POWER DISTRIBUTION>MAIN BODY ECU (for LHD)>REMOVAL
for RHD:
Click herePower Source / Network>POWER DISTRIBUTION>MAIN BODY ECU (for RHD)>REMOVAL
NG