The necessary procedures (adjustment, calibration, initialization, or registration) that must be performed after parts are removed, installed, or replaced during the transmission revolution sensor (NC1) removal/installation are shown below.
Necessary Procedure After Parts Removed/Installed/Replaced
| Replacement Part or Procedure
|
Necessary Procedure
|
Effect/Inoperative when not Performed
|
Link
|
|
|
| Battery terminal is disconnected/reconnected
|
Drive the vehicle until stop and start control is permitted (approximately 5 to 60 minutes)
|
Stop and start system
|
( )
|
| Perform steering sensor zero point calibration
|
Lane control system
|
( )
|
| Parking support brake system (for Gasoline model)*
|
| Pre-collision system
|
| Memorize steering angle neutral point
|
Parking assist monitor system
|
( )
|
| Panoramic view monitor system (for Gasoline model)
|
( )
|
| Reset back door close position
|
Power back door system (for Gasoline model)
|
( )
|
| Power back door initialization
|
Power door lock control system
|
( )
|
| Transmission valve body assembly
|
·
Reset transaxle compensation code
·
Deceleration sensor zero point calibration
·
CVT oil pressure calibration
·
Perform road test to allow TCM to learn
|
·
Deterioration of fuel efficiency
|
for Initialization:( )
for Registration:( )
|
| CVT fluid
|
ATF thermal degradation estimate reset
|
The value of the Data List item "ATF Thermal Degradation Estimate" is not estimated correctly
|
( )
|
| Air bleed oil pump with motor assembly (w/ Stop and Start System)
|
Stop and start system
|
( )
|
- NOTICE:
-
After the ignition switch is turned off, the navigation system requires approximately a minute to record various types of memory and settings. As a result, after turning the ignition switch off, wait a minute or more before disconnecting the cable from the negative (-) battery terminal.