Home › Engine / Hybrid System › 3UR-FE LUBRICATION › OIL PUMP

OIL PUMP > INSTALLATION

for Preparation Click here



1. INSTALL INLET WATER PIPE
  1. Apply soapy water to 2 new O-rings and install them to the inlet water pipe.

  1. Install the inlet water pipe to the No. 1 heat exchanger cover.



2. INSTALL TIMING CHAIN OR BELT COVER SUB-ASSEMBLY
  1. Apply a light coat of engine oil to a new oil pump gasket.

  1. Install the oil pump gasket to the cylinder block.

  1. Apply a light coat of engine oil to a new O-ring.

  1. Install the O-ring to the oil pan sub-assembly.



  1. Apply seal packing in a continuous line to the timing chain or belt cover sub-assembly as shown in the following illustration.


    A178520E04


    Text in Illustration 
    *a
    Continuous Line Area
    *b
    Dashed Line Area
    *c
    Diagonal Line Area
    -
    -

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent


    1. A150825E09

      Apply Seal Packing as Follows:
      Area
      Seal Packing Diameter
      Application Position from Inside Edge of Cover
      Continuous line area
      3.0 to 4.0 mm (0.118 to 0.157 in.)
      2.5 mm (0.0984 in.)
      Dashed line area
      6.4 mm (0.252 in.) or more, or within OK area shown in illustration
      7.0 mm (0.276 in.)
      Diagonal line area
      3.0 to 4.0 mm (0.118 to 0.157 in.)
      5.5 mm (0.217 in.)

    Text in Illustration 
    *a
    Seal Packing Thickness
    *b
    Seal Packing Width
    *c
    OK Area

    NOTICE:
    1. When the contact surfaces are wet, wipe them with an oil-free cloth before applying seal packing.
    2. Install the timing chain or belt cover sub-assembly within 3 minutes and tighten the bolts within 10 minutes after applying seal packing.
    3. Do not start the engine for at least 2 hours after installing.



    A162541
  1. Align the oil pump drive rotor spline and crankshaft as shown in the illustration. Install the spline and timing chain or belt cover sub-assembly to the crankshaft.



    A162542E05
  1. Temporarily install the timing chain or belt cover sub-assembly with the 28 bolts and nut.

    Standard Bolt:
    Item
    Length
    Thread Diameter
    Bolt A
    25 mm (0.984 in.)
    8 mm (0.315 in.)
    Bolt B
    55 mm (2.17 in.)
    8 mm (0.315 in.)
    Bolt C
    70 mm (2.76 in.)
    8 mm (0.315 in.)
    Bolt D
    35 mm (1.38 in.)
    10 mm (0.394 in.)
    Bolt E
    55 mm (2.17 in.)
    10 mm (0.394 in.)
    Bolt F
    80 mm (3.15 in.)
    10 mm (0.394 in.)

    Text in Illustration 
    *1
    Nut

    NOTICE:
    Make sure that there is no oil on the bolt threads.



    A174145E01
  1. Tighten the 3 bolts in several steps in the sequence shown in the illustration.

    Torque:
    47 N*m{ 479 kgf*cm , 35 ft.*lbf }



    A163330E01
  1. Temporarily install the fluid coupling bracket with the 4 bolts.

    Standard Bolt:
    Item
    Length
    Thread Diameter
    Bolt A
    70 mm (2.76 in.)
    8 mm (0.315 in.)
    Bolt B
    80 mm (3.15 in.)
    10 mm (0.394 in.)

  1. Temporarily install the V-ribbed belt tensioner assembly with the standard bolt and 6 mm hexagon wrench bolt.



    A174146E01
  1. Tighten the 8 bolts labeled 4 to 11 in several steps in the sequence shown in the illustration.

    Torque:
    47 N*m{ 479 kgf*cm , 35 ft.*lbf }



    A162544E01
  1. Tighten the 23 bolts and nut labeled 12 to 35 in several steps in the sequence shown in the illustration.

    Torque:
    23 N*m{ 235 kgf*cm , 17 ft.*lbf }


    NOTICE:
    A162545E01
    After the installation, if the seal packing has seeped out at the areas labeled A shown in the illustration, wipe it off.



3. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY LH
  1. Install 5 new O-rings to the No. 2 camshaft bearing cap and No. 3 camshaft bearing cap.

  1. Install the gasket to the cylinder head cover sub-assembly LH.

    NOTICE:
    Remove any oil from the contact surface.



    A291560E01
  1. Apply seal packing as shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    Text in Illustration 
    V100135
    Seal Packing

    NOTICE:
    1. Remove any oil from the contact surface.
    2. Install the cylinder head cover sub-assembly LH within 3 minutes and tighten the bolts within 15 minutes after applying seal packing.



    A162523E01
  1. Install the cylinder head cover sub-assembly LH washer with a new seal and the 14 bolts.

    1. Bolt A

    Torque:
    21 N*m{ 214 kgf*cm , 16 ft.*lbf }

    1. Except bolt A

    Torque:
    12 N*m{ 122 kgf*cm , 9 ft.*lbf }

    NOTICE:
    Do not start the engine for at least 2 hours after the installation.



4. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY
  1. Install 5 new O-rings to the No. 1 camshaft bearing cap and No. 3 camshaft bearing cap.

  1. Install the gasket to the cylinder head cover sub-assembly.

    NOTICE:
    Remove any oil from the contact surface.



    A291561E01
  1. Apply seal packing as shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    Text in Illustration 
    V100135
    Seal Packing

    NOTICE:
    1. Remove any oil from the contact surface.
    2. Install the cylinder head cover sub-assembly within 3 minutes and tighten the bolts within 15 minutes after applying seal packing.



    A162525E01
  1. Install the cylinder head cover sub-assembly washer with a new seal and the 14 bolts.

    1. Bolt A

    Torque:
    21 N*m{ 214 kgf*cm , 16 ft.*lbf }

    1. Except bolt A

    Torque:
    12 N*m{ 122 kgf*cm , 9 ft.*lbf }

    NOTICE:
    Do not start the engine for at least 2 hours after the installation.



5. INSTALL IGNITION COIL ASSEMBLY
  1. Install the 8 ignition coils with the 8 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



    A151832
  1. Connect the 8 ignition coil connectors.



6. INSTALL CRANKSHAFT PULLEY
  1. Align the pulley set key with the key groove of the pulley, and slide on the pulley.



    A164230E01
  1. Using SST, install the pulley set bolt.

    SST
    09213-70011  
    09330-00021  

    Torque:
    300 N*m{ 3059 kgf*cm , 221 ft.*lbf }



7. CONNECT WIRE HARNESS CLAMP BRACKET
  1. Connect the wire harness clamp bracket to the timing or belt chain cover sub-assembly with the bolt.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }



8. INSTALL NO. 1 IDLER PULLEY SUB-ASSEMBLY
  1. Install the No. 1 idler pulley sub-assembly with the bolt.

    Torque:
    43 N*m{ 438 kgf*cm , 32 ft.*lbf }



9. INSTALL WATER PUMP PULLEY


    A151837E02
  1. Temporarily install the pulley with the 4 bolts.

  1. Using SST, hold the pulley and tighten the 4 bolts.

    SST
    09960-10010   (09962-01000, 09963-01000)

    Torque:
    21 N*m{ 214 kgf*cm , 16 ft.*lbf }



10. INSTALL INLET WATER HOUSING


    A162555E01
  1. Install a new gasket to the water pump.



    A183227E01
  1. Connect the No. 3 water by-pass hose to the inlet water housing.

  1. Install the inlet water housing with the 3 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 16 ft.*lbf }

    HINT:
    Install the hose so that the direction of the hose clamp is as indicated in the illustration.



11. INSTALL NO. 1 ENGINE COVER


A158656

NOTICE:
Make sure that the No. 1 engine cover is level with the top surface of the intake port of the cylinder head for 1 and 2.

  1. Install the No. 1 engine cover.

    HINT:
    1. Align the No. 1 engine cover cutouts with the air tube.
    2. Align the No. 1 engine cover with the electric air control valve surface and cylinder head wall.



12. INSTALL NO. 2 CYLINDER HEAD COVER


A158538

NOTICE:
Make sure that the No. 2 cylinder head cover is level with the top surface of the intake port of the cylinder head.

  1. Install the No. 2 cylinder head cover.

    HINT:
    1. Align the No. 2 cylinder head cover cutout with the air tube.
    2. Align the No. 2 cylinder head cover with the front water by-pass joint and cylinder head wall.



13. INSTALL NO. 3 WATER BY-PASS PIPE

HINT:
Perform this procedure only when replacement of the No. 3 water by-pass pipe is necessary.



    A307664E01
  1. Install the No. 3 water by-pass pipe to the front water by-pass joint with the bolt.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

    Text in Illustration 
    *a
    Stopper
    *b
    Protrusion

    NOTICE:
    Align the notch of the stopper with the protrusion of the front water by-pass joint



14. INSTALL FRONT WATER BY-PASS JOINT
  1. Install 2 new gaskets and the front water by-pass joint with the 4 nuts to the cylinder head.

    Torque:
    21 N*m{ 214 kgf*cm , 16 ft.*lbf }

  1. Connect the No. 2 water by-pass hose to the front water by-pass joint, and slide the clamp to secure the hose.



15. CONNECT NO. 10 WATER BY-PASS HOSE


    A291559E03
  1. Connect the No. 10 water by-pass hose to the front water by-pass joint, and slide the clamp to secure the hose.
    Text in Illustration 
    *1
    No. 9 Water By-pass Hose
    *2
    No. 10 Water By-pass Hose
    *a
    Paint Mark (Orange)
    *b
    Paint Mark (Yellow)



16. CONNECT NO. 9 WATER BY-PASS HOSE
  1. Connect the No. 9 water by-pass hose to the front water by-pass joint, and slide the clamp to secure the hose.



17. INSTALL NO. 1 WATER BY-PASS PIPE
  1. Install the No. 1 water by-pass pipe with the 2 bolts.

    Torque:
    18 N*m{ 184 kgf*cm , 13 ft.*lbf }



18. INSTALL WATER BY-PASS PIPE SUB-ASSEMBLY
  1. Connect the No. 2 water by-pass hose and No. 3 water by-pass hose to the water by-pass pipe sub-assembly, and slide the 2 clamps to secure the hoses.

  1. Install the water by-pass pipe sub-assembly with the 2 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



19. INSTALL NO. 1 WATER BY-PASS HOSE
  1. Connect the No. 1 water by-pass hose to the inlet water housing and front water by-pass joint, and slide the 2 clamps to secure the hoses.



20. INSTALL GENERATOR ASSEMBLY
(Click here).


21. INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE
  1. Apply a light coat of engine oil to a new O-ring.



    A164434E03
  1. Install the O-ring to the engine oil level dipstick guide.
    Text in Illustration 
    *1
    O-Ring
    *a
    Push

  1. Install the engine oil level dipstick guide with the bolt.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Connect the wire harness clamp.

  1. Install the engine oil level dipstick to the engine oil level dipstick guide.



22. INSTALL ENGINE OIL COOLER
(Click here).


23. INSTALL OIL FILTER ELEMENT
(Click here).


24. INSTALL NO. 2 FUEL TUBE SUB-ASSEMBLY
  1. Connect the No. 2 fuel tube sub-assembly with the 2 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



25. INSTALL COOLER COMPRESSOR ASSEMBLY


    A163332E01
  1. Install the cooler compressor assembly with the 2 stud bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Install the 2 bolts and 2 nuts.
    Tighten the bolts and nuts in the order shown in the illustration to install the cooler compressor assembly.

    Torque:
    25 N*m{ 250 kgf*cm , 18 ft.*lbf }



26. INSTALL INTAKE MANIFOLD
(Click here).


27. INSTALL NO. 2 ENGINE WIRE


28. INSTALL ENGINE WIRE


29. CONNECT OUTLET HEATER WATER HOSE C


    A183229E02
  1. Connect the outlet heater water hose C to the No. 1 water by-pass pipe, and slide the clamp to secure the hose.
    Text in Illustration 
    *a
    RR
    *b
    LH
    *c
    45°

    HINT:
    Install the outlet heater water hose C so that the direction of the hose clamp is as indicated in the illustration.



30. CONNECT INLET HEATER WATER HOSE C


    A183231E02
  1. Connect the inlet heater water hose C to the water by-pass pipe sub-assembly, and slide the clamp to secure the hose.
    Text in Illustration 
    *a
    RR
    *b
    LH
    *c
    45°

    HINT:
    Install the inlet heater water hose C so that the direction of the hose clamp is as indicated in the illustration.



31. INSTALL AIR CLEANER HOSE ASSEMBLY


A198568E01
  1. Connect the air cleaner hose and tighten clamp.

    Torque:
    4.0 N*m{ 41 kgf*cm , 35 in.*lbf }

  1. Connect the No. 2 ventilation hose with the clamp.

    HINT:
    Install the hose so that the direction of the hose clamp is as indicated in the illustration.

  1. Connect the vacuum hose.



32. INSTALL AIR CLEANER ASSEMBLY


    A183246E01
  1. Attach grommet to air cleaner before mounting the air cleaner.

  1. Insert the air cleaner into the fender apron hole, and fully insert pin to grommet.



    A183242
  1. Install the air cleaner with the 2 bolts.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

  1. Connect the connector and install the clamp and wire harness.

  1. Connect the air cleaner hose and tighten the clamp.

    Torque:
    4.0 N*m{ 41 kgf*cm , 35 in.*lbf }



33. INSTALL RADIATOR ASSEMBLY
(Click here).


34. ADD ENGINE OIL
  1. Add fresh oil.

    Standard Oil Grade:
    Oil Grade
    Oil Viscosity (SAE)
    API grade SL, SM or SN multigrade engine oil
    1. 15W-40
    2. 20W-50
    API grade SL "energy-conserving", SM "energy-conserving", SN "resource-conserving" or ILSAC multigrade engine oil
    1. 5W-30
    2. 10W-30
    (5W-30 is the best choice for fuel economy and good starting in cold weather.)

    Standard Oil Capacity:
    Item
    Specified Condition
    Drain and refill without oil filter change
    7.1 liters (7.5 US qts, 6.2 Imp. qts)
    Drain and refill with oil filter change
    7.5 liters (7.9 US qts, 6.6 Imp. qts)
    Dry fill
    9.3 liters (9.8 US qts, 8.2 Imp. qts)

  1. Install the oil filler cap.



35. INSPECT FOR OIL LEAK
  1. Start the engine. Make sure that there are no oil leaks from the area that was worked on.



36. CHECK ENGINE OIL LEVEL
  1. Warm up the engine, and then stop the engine and wait for 5 minutes.

  1. Check that the engine oil level is between the low level and full level marks on the dipstick.
    If low, check for leakage and add oil up to the full level mark.

    NOTICE:
    Do not fill engine oil above the full level mark.