17363Q
1.INSTALL NO. 3 AIR TUBE
Install a new gasket and the No. 3 air tube with the 2 bolts.
| *1 | Identification Color |
Make sure that the gasket's claws are not caught between the air tube and electric air control valve assembly.
The identification color on the flange is orange.
17362
2.INSTALL NO. 2 AIR TUBE
Install a new gasket and the No. 2 air tube with the 2 bolts.
| *1 | Identification Color |
Make sure that the gasket's claws are not caught between the air tube and electric air control valve assembly.
The identification color on the flange is blue.
25720
3.INSTALL ELECTRIC AIR CONTROL VALVE ASSEMBLY
Install the electric air control valve assembly with the 3 bolts to the No. 1 heat exchanger cover.
Connect the 2 electric air control valve connectors.
Install the bracket to the electric air control valve assembly with the bolt.
Connect the knock sensor connector.
17303
4.INSTALL AIR PIPE SUB-ASSEMBLY
Connect the 2 No. 1 air hoses to the air pipe.
Connect the air pipe to the electric air control valve assembly, and install the air pipe with the 2 bolts to the No. 1 heat exchanger cover.
Connect the air pump connector clamp holder.
| *1 | No. 2 air injection system hose |
| *2 | No. 3 air injection system hose |
Attach the wire harness claw.
Connect the electric air control valve connector.
Connect the No. 2 air injection system hose and No. 3 air injection system hose, and slide the 2 clamps to secure the hose.
16279
5.INSTALL NO. 3 WATER BY-PASS PIPE
Perform this procedure only when replacement of the No. 3 water by-pass pipe is necessary.
Install the No. 3 water by-pass pipe to the front water by-pass joint with the bolt.
| *a | Stopper |
| *b | Protrusion |
Align the notch of the stopper with the protrusion of the front water by-pass joint.
16355
6.INSTALL FRONT WATER BY-PASS JOINT
Install 2 new gaskets and the front water by-pass joint to the cylinder head with the 4 nuts.
Connect the engine coolant temperature sensor connector.
16268A
7.CONNECT WATER BY-PASS PIPE HOSE (w/ Trailer Towing System)
Connect the water by-pass pipe hose with the 3 bolts to the timing chain cover and front water by-pass joint.
16264D
8.CONNECT NO. 2 WATER BY-PASS HOSE
Connect the No. 2 water by-pass hose to the water by-pass joint, and slide the clamp to secure the hose.
16261
9.INSTALL NO. 1 WATER BY-PASS HOSE
Install the No. 1 water by-pass hose to the front water by-pass joint and water inlet housing, and slide the clamp to secure the hose.
16293
10.INSTALL NO. 10 WATER BY-PASS HOSE
Install the No. 10 water by-pass hose to the separator case and front water by-pass joint, and slide the 2 clamps to secure the hose.
| *1 | No. 9 Water By-pass Hose |
| *2 | No. 10 Water By-pass Hose |
| *a | Paint Mark (Pink) |
| *b | Paint Mark (White) |
Make sure that the color on the hose matches with the color on the case separator.
16297
11.INSTALL NO. 9 WATER BY-PASS HOSE
Install the No. 9 water by-pass hose to the separator case and front water by-pass joint, and slide the 2 clamps to secure the hose.
Make sure that the color on the hose matches with the color on the case separator.
12611
12.INSTALL NO. 1 ENGINE COVER
Make sure that the No. 1 engine cover is level with the top surface of the intake port of the cylinder head for 1 and 2.
Install the No. 1 engine cover.
Align the No. 1 engine cover cutouts with the air tube.
Align the No. 1 engine cover with the air switching valve surface and cylinder head wall.
77285D
13.CONNECT FUEL TUBE CLAMP
Connect the fuel tube clamp to the bracket.
11212
14.INSTALL NO. 2 CYLINDER HEAD COVER
Make sure that the No. 2 cylinder head cover is level with the top surface of the intake port of the cylinder head.
Install the No. 2 cylinder head cover.
Align the No. 2 cylinder head cover cutout with the air tube.
Align the No. 2 cylinder head cover with the front water by-pass joint and cylinder head wall.
16711
15.INSTALL FAN SHROUD
17111
16.INSTALL INTAKE MANIFOLD
17104
17.INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY