Home › Engine / Hybrid System › 3UR-FE STARTING › STARTER
RM27L0U _51 Engine / Hybrid System _049307 3UR-FE STARTING _0235632 STARTER A

3UR-FE STARTING  STARTER  INSTALLATION  


PROCEDURE

Hide 28100 1.INSTALL STARTER ASSEMBLY

a.
A163323

Install the flywheel housing side cover.


b.

Install the starter with the 2 bolts.

Torque:
37 N*m (377 kgf*cm, 27 ft.*lbf)


c.

Install the starter wire with the nut.

Torque:
9.8 N*m (100 kgf*cm, 87 in.*lbf)


d.

Connect the starter connector.


e.

Attach the 2 wire harness clamps.


Hide 28192 2.INSTALL STARTER COVER

a.
A162756

Install the starter cover with the 3 bolts.

Torque:
12 N*m (117 kgf*cm, 8 ft.*lbf)


Hide 17104 3.INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY RH

Hide 17167 4.INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR

Hide 58155 5.INSTALL FRONT NO. 3 FLOOR HEAT INSULATOR

Hide 11452 7.INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE

a.

Apply a light coat of engine oil to a new O-ring.


b.
A379984E01
0.75,0.688 0.948,0.813 0.948,0.813 1.083,0.813 false 1.073,0.313 1.49,0.656 0.417,0.344 10 true Push 1.135,0.719 1.646,1 0.51,0.281 10 true O-Ring

Install the O-ring to the guide.


c.

Install the dipstick guide with the bolt.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


d.

Connect the wire harness clamp.


e.

Install the dipstick.


Hide 11.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Torque:
5.4 N*m (55 kgf*cm, 48 in.*lbf)

NOTICE:

When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page General>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION).