Home › Power Source / Network › 3UR-FBE BATTERY / CHARGING › GENERATOR
RM27L0U _57 Power Source / Network _049333 3UR-FBE BATTERY / CHARGING _0235799 GENERATOR A

3UR-FBE BATTERY / CHARGING  GENERATOR  INSTALLATION  


PROCEDURE

Hide 27020 1.INSTALL GENERATOR ASSEMBLY (for 130 A, 150 A Type)

a.
A156406

Install the generator with the 3 bolts and nut.

Torque:
43 N*m (438 kgf*cm, 32 ft.*lbf)


b.
A156405

Connect the generator connector.


c.

Connect the generator wire with the nut.

Torque:
9.8 N*m (100 kgf*cm, 87 in.*lbf)


d.

Install the terminal cap.


e.

Install the harness bracket to the generator with the bolt.

Torque:
31 N*m (316 kgf*cm, 23 ft.*lbf)


Hide 27020 2.INSTALL GENERATOR ASSEMBLY (for 180 A Type)

a.
A156406

Install the generator with the 3 bolts and nut.

Torque:
43 N*m (438 kgf*cm, 32 ft.*lbf)


b.
A156405

Connect the generator connector.


c.

Connect the generator wire with the nut.

Torque:
12 N*m (122 kgf*cm, 9 ft.*lbf)


d.

Install the terminal cap.


e.

Install the harness bracket to the generator with the bolt.

Torque:
31 N*m (316 kgf*cm, 23 ft.*lbf)


Hide 44320 3.CONNECT VANE PUMP ASSEMBLY

A163333E12
1.75,1.844 1.688,1.844 false 1.688,1.833 0.885,1.646 false 1.75,1.771 2.281,2.01 0.531,0.24 10 true Spacer

HINT:

Before performing the following procedures, move the spacer until the vane pump can be installed.


a.
A163289

Install the vane pump to the timing chain cover with the 2 bolts.

Torque:
28 N*m (286 kgf*cm, 21 ft.*lbf)


b.
A184959

Connect the clamp and 2 power steering connectors.


Hide 28800 12.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Torque:
5.4 N*m (55 kgf*cm, 48 in.*lbf)

NOTICE:

When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page General>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION).