Home › Power Source / Network › NETWORKING › NETWORK GATEWAY ECU
RM27L0U _57 Power Source / Network _049335 NETWORKING _0235804 NETWORK GATEWAY ECU A

NETWORKING  NETWORK GATEWAY ECU  INSTALLATION  


PROCEDURE

Hide 89111 1.INSTALL NETWORK GATEWAY ECU

a.

Install the network gateway ECU with the 2 nuts.

Torque:
7.5 N*m (76 kgf*cm, 66 in.*lbf)


b.

Connect the network gateway ECU connector.


Hide 55045A 2.INSTALL LOWER INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY RH

Hide 55607 5.INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY

Hide 9.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:

When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page General>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION).