Home › Suspension › SUSPENSION CONTROL › SUSPENSION CONTROL ECU
RM3650E _53 Suspension _079980 SUSPENSION CONTROL _0387937 SUSPENSION CONTROL ECU A

SUSPENSION CONTROL  SUSPENSION CONTROL ECU  INSTALLATION  


PROCEDURE

Hide 1.INSTALL ABSORBER CONTROL ECU

a.
C413665

Install the absorber control ECU (2).


b.

Replace the plastic nuts (1).


c.

Tighten plastic nuts (1).

Torque:
2.6 N*m (27 kgf*cm, 23 in.*lbf)


d.
C413664

Connect connectors (1) and lock.


e.
C413671

Fold the carpet (1) in the marked area in the direction of the arrow.


Hide 55606 2.INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY (for LHD)

Hide 55607 3.INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY (for RHD)

HINT:

Use the same procedure as for the RH side.

Click hereVehicle Interior>INTERIOR PANELS / TRIM>FRONT CONSOLE BOX>INSTALLATION


Hide 62112A 4.INSTALL COWL SIDE TRIM SUB-ASSEMBLY LH (for LHD)

Hide 62112A 5.INSTALL COWL SIDE TRIM SUB-ASSEMBLY LH (for RHD)

HINT:

Use the same procedure as for the RH side.

Click hereVehicle Interior>INTERIOR PANELS / TRIM>INSTRUMENT PANEL SAFETY PAD>INSTALLATION


Hide 67914 6.INSTALL FRONT DOOR SCUFF PLATE LH

Hide 7.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL (for B48)

Hide 8.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL (for B58)

Hide 9. ENCODE/PROGRAM CONTROL UNIT(S)

NOTICE:
·

Use the most recent software version to prevent faults during programming/encoding.

·

The battery voltage must not drop below 13.0 V during programming.

·

Use only recommended chargers for a low-voltage vehicle electrical system.

·

Do not exceed the maximum charging voltage of 14.8 V when charging the battery.

·

When there is communication abnormality in the middle of work, control unit might be damaged.

·

It may be necessary to perform the Action Plan several times.



a.

Connect the battery charger to the vehicle.


b.

Connect the diagnosis system with the vehicle.


c.

Determine the action plan.

Service plan / Programming plan / Action plan / Calculate action plan


d.

Accept and fully process the measures plan.

Service plan / Programming plan / Action plan / Perform action plan


e.

Wait until programming/encoding has been completed.

NOTICE:

When there is communication abnormality in the middle of work, control unit might be damaged.



f.

Carry out vehicle test.

Vehicle management / Troubleshooting / Fault memory / Calculate test plan


g.

Delete the fault memory.

Vehicle management / Troubleshooting / Fault memory / Delete fault memory


h.

Disconnect the diagnosis system from the vehicle.


i.

Disconnect the battery charger from the vehicle.