ENGINE ASSEMBLY > INSTALLATION |
| 1. INSTALL ENGINE OIL PRESSURE SWITCH ASSEMBLY |
| 2. INSTALL FRONT NO. 1 ENGINE MOUNTING BRACKET RH |
![]() |
Install the engine mounting bracket front No. 1 RH with the 4 bolts.
| 3. INSTALL EXHAUST MANIFOLD |
![]() |
Install a new gasket and the exhaust manifold with 8 new nuts.
| 4. INSTALL AIR SWITCHING VALVE ASSEMBLY |
![]() |
Install a new gasket onto the cylinder head.
Install the air switching valve with the 2 nuts.
![]() |
Connect the air switching valve connector.
Connect the vacuum hose.
| 5. INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR |
![]() |
Install the exhaust manifold heat insulator No. 1 with the 5 bolts.
| 6. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY |
![]() |
Provisionally install the V-ribbed belt tensioner with bolts A and B.
Tighten bolt B.
Tighten bolt A.
Check that the bolt holes of the V-ribbed belt tensioner and timing chain cover are aligned, and install bolt C.
![]() |
Tighten bolt C.
| 7. INSTALL NO. 1 IDLER PULLEY SUB-ASSEMBLY |
![]() |
Install the No. 1 idler pulley sub-assembly with the bolt.
| 8. INSTALL GENERATOR ASSEMBLY |
![]() |
Install the generator with the 2 bolts.
![]() |
Connect the generator connector.
Install the generator wire with the nut.
Install the terminal cap.
| 9. INSTALL SPARK PLUG |
| 10. INSTALL IGNITION COIL ASSEMBLY |
| 11. INSTALL VENTILATION PIPE |
![]() |
Install the ventilation pipe with the bolt.
| 12. INSTALL NO. 1 WATER BY-PASS PIPE |
![]() |
Install a new gasket, then install the water by-pass pipe No. 1.
| 13. INSTALL ENGINE COOLANT TEMPERATURE SENSOR |
![]() |
Install a new gasket onto the engine coolant temperature sensor.
Using a 19 mm deep socket wrench, install the engine coolant temperature sensor.
| 14. INSTALL KNOCK SENSOR |
![]() |
Install the knock control sensor with the bolt.
Connect the knock control sensor connector.
| 15. INSTALL FUEL INJECTOR ASSEMBLY |
![]() |
Apply a light coat of gasoline or spindle oil to new O-rings, then install one onto each fuel injector.
![]() |
Apply a light coat of gasoline or spindle oil to the contact surfaces of the fuel delivery pipe and the O-ring of the fuel injector.
Apply a light coat of gasoline or spindle oil to the O-ring again, then install the fuel injector into the fuel delivery pipe by turning it right and left.
Check that the fuel injector rotates smoothly.
If the fuel injector does not rotate, replace the O-ring.
| 16. INSTALL THERMOSTAT |
![]() |
Install a new gasket onto the thermostat.
Install the thermostat with the jiggle valve upward.
| 17. INSTALL FRONT NO. 1 ENGINE MOUNTING BRACKET LH |
![]() |
Install engine mounting bracket front No. 1 LH with the 4 bolts.
| 18. INSTALL OIL LEVEL GAGE GUIDE |
![]() |
Install the oil level gage guide with the bolt.
| 19. INSTALL OIL LEVEL GAGE SUB-ASSEMBLY |
| 20. INSTALL ENGINE WIRE |
| 21. INSTALL IDLE PULLEY ASSEMBLY WITH BRACKET (w/ Air Conditioning System) |
![]() |
Using several steps, uniformly install and tighten the 5 bolts in the sequence shown in the illustration.
| 22. INSTALL NO. 1 INTAKE MANIFOLD TO HEAD GASKET |
![]() |
Install a new gasket onto the intake manifold.
Install the intake manifold with the 5 bolts and 2 nuts.
![]() |
Connect the engine wire harness to the relay block.
Install the nut shown in the illustration.
Connect the 3 connectors.
![]() |
Install the harness clamp bracket with the bolt.
Engage the wire harness clamp.
Connect the compressor magnetic clutch connector. (w/ AIR CONDITIONING)
Engage the engine wire harness clamp.
Connect the VSV connector.
![]() |
Connect the ventilation hose No. 3.
![]() |
Connect the water by-pass hose No. 2.
![]() |
Install the clamp bracket with the bolt.
![]() |
Connect the vacuum hose.
![]() |
Connect the fuel vapor feed hose to the VSV.
| 23. INSTALL THROTTLE WITH MOTOR BODY ASSEMBLY |
![]() |
Install a new gasket onto the intake manifold.
![]() |
Install the throttle with motor body with the 2 bolts and 2 nuts.
![]() |
Connect the water by-pass hose.
Connect the water by-pass hose No. 2.
Connect the throttle motor connector.
| 24. INSTALL NO. 2 FUEL HOSE |
![]() |
Align the fuel hose connector with the pipe stem, and insert the fuel hose until the retainer makes a "click" sound.
Push down the checker of the fuel hose.
Push the fuel hose down until the checker of the fuel hose makes a "click" sound.
| 25. INSTALL FUEL HOSE |
![]() |
Align the fuel hose connector with the pipe stem, and insert the fuel hose until the retainer makes a "click" sound.
Push down the checker of the fuel hose.
Push the fuel hose down until the checker of the fuel hose makes a "click" sound.
| 26. INSTALL INTAKE AIR CONNECTOR |
![]() |
Install the intake air connector with the 3 bolts.
Tighten the 2 hose clamp bolts.
![]() |
Connect the vacuum hose.
![]() |
Connect the ventilation hose No. 2.
![]() |
Connect the vacuum hose.
Engage the wire harness clamp.
Connect the pressure sensor connector.
| 27. INSTALL REAR END PLATE |
Install the rear end plate with the 2 bolts.
| 28. INSTALL DRIVE PLATE AND RING GEAR SUB-ASSEMBLY (for Automatic Transmission) |
![]() |
Clean the 10 bolts and 10 bolt holes.
Apply adhesive to 2 or 3 threads of the 10 bolts.
Provisionally install the drive plate spacer front, drive plate and ring gear and drive plate rear with the 10 bolts.
Using SST, hold the crankshaft.
![]() |
Using several steps, uniformly install and tighten the 10 bolts in the sequence shown in the illustration.
| 29. INSTALL FLYWHEEL SUB-ASSEMBLY (for Manual Transmission) |
![]() |
Clean the 10 bolts and 10 bolt holes.
Apply adhesive to 2 or 3 threads of the 10 bolts.
Using SST, hold the crankshaft.
![]() |
Using several steps, uniformly install and tighten the 10 bolts in the sequence shown in the illustration.
![]() |
Mark the bolts with paint as shown in the illustration.
Retighten the bolts by 90° in the same sequence as in step (d).
Check that the paint mark of each bolt is at a 90° from the original position.
| 30. INSTALL CLUTCH DISC ASSEMBLY (for Manual Transmission) |
| Transmission | See page |
| R155 |
Click here
|
| R155F |
Click here
|
| 31. INSTALL CLUTCH COVER ASSEMBLY (for Manual Transmission) |
| Transmission | See page |
| R155 |
Click here
|
| R155F |
Click here
|
| 32. INSTALL ENGINE ASSEMBLY |
![]() |
Attach the engine sling device and chain block to the engine hangers.
Keep the engine level, and align the engine mounting bracket front No. 1 RH w/ engine mounting insulator front and LH with the body mountings.
Attach the engine mounting bracket front No. 1 RH w/ engine mounting insulator front and LH, and install the 4 bolts and nuts.
Remove the bolts, then remove the engine hangers.
| 33. INSTALL AUTOMATIC TRANSMISSION ASSEMBLY |
| 34. INSTALL MANUAL TRANSMISSION UNIT ASSEMBLY |
| Transmission | See page |
| R155 |
Click here
|
| R155F |
Click here
|
| 35. INSTALL FRONT EXHAUST PIPE ASSEMBLY |
![]() |
Check the free length.
Using vernier calipers, measure the free length of the compression spring.
![]() |
Using a wooden block and plastic-faced hammer, tap in a new gasket until it is flush with the exhaust manifold.
Install the exhaust pipe front into the exhaust pipe support.
Tighten the 2 bolts and 2 compression springs.
| 36. INSTALL EXHAUST PIPE ASSEMBLY TAIL |
Install a new gasket onto the exhaust pipe front.
Install the exhaust pipe tail onto the 4 exhaust pipe supports.
Tighten the 2 bolts and 2 nuts.
| 37. INSTALL ENGINE WIRE |
| 38. CONNECT NO. 1 AIR INJECTION HOSE |
![]() |
Connect the fuel vapor feed hose.
| 39. CONNECT FUEL VAPOR FEED HOSE ASSEMBLY |
![]() |
Connect the fuel feed hose.
| 40. CONNECT NO. 2 FUEL HOSE |
![]() |
Align the fuel hose connector with the pipe stem, and insert the fuel hose until the retainer makes a "click" sound.
Push down the checker of the fuel hose.
Push the fuel hose down until the checker of the fuel hose makes a "click" sound.
| 41. CONNECT FUEL HOSE |
![]() |
Align the fuel hose connector with the pipe stem, and insert the fuel hose until the retainer makes a "click" sound.
Push down the checker of the fuel hose.
Push the fuel hose down until the checker of the fuel hose makes a "click" sound.
| 42. INSTALL WATER HOSE SUB-ASSEMBLY |
![]() |
Install the water hose.
| 43. INSTALL RADIATOR HOSE INLET |
| 44. INSTALL COMPRESSOR AND MAGNETIC CLUTCH (w/ Air Conditioning System) |
![]() |
Install the compressor and magnetic clutch with the 4 bolts.
Connect the compressor and magnetic clutch connector.
![]() |
Install the bolt shown in the illustration.
| 45. INSTALL NO. 2 RADIATOR HOSE |
| 46. INSTALL VANE PUMP ASSEMBLY |
![]() |
Install the vane pump with the 2 bolts.
Connect the vane pump connector.
| 47. INSTALL AIR CLEANER CASE |
Install the air cleaner case with the 3 bolts.
| 48. INSTALL AIR CLEANER FILTER ELEMENT SUB-ASSEMBLY |
| 49. INSTALL AIR CLEANER CAP SUB-ASSEMBLY |
![]() |
Install the air cleaner cap together with the air cleaner hose No. 1.
Connect the 2 air cleaner clamps.
Tighten the hose clamp bolt, then connect the air cleaner hose No. 1.
Connect the wire harness clamp.
Connect the mass air flow meter connector.
| 50. INSTALL FAN SHROUD |
![]() |
Install the fan pulley.
![]() |
Install the fan shroud and fan with fluid coupling together.
Provisionally install the fan with fluid coupling with the 4 nuts.
![]() |
Install the 2 bolts shown in the illustration.
![]() |
Connect the oil cooler inlet and outlet hoses to the fan shroud. (for Automatic Transmission)
![]() |
Connect the radiator reserve tank hose to the radiator.
Install the fan generator V belt.
![]() |
Tighten the 4 nuts shown in the illustration.
| 51. INSTALL RADIATOR SUPPORT TO FRAME SEAL LH |
![]() |
Install the radiator support frame seal LH with the 9 clips.
| 52. INSTALL BATTERY TRAY |
| 53. INSTALL BATTERY |
| 54. ADD ENGINE COOLANT |
Tighten the engine drain plug.
Tighten the radiator drain plug.
Disconnect the 2 vinyl hoses.
Slowly fill the system with engine coolant.
Check the coolant level inside the radiator by squeezing the inlet and outlet radiator hoses several times by hand. If the coolant level goes down, add coolant.
Install the radiator cap securely.
Slowly pour coolant into the radiator reservoir until it reaches the FULL line.
Warm up the engine until the cooling fan operates.
| Item | Condition |
| Fan speed | Any setting except OFF |
| Temperature | Toward warm |
| Air condition switch | OFF |
Squeeze the inlet and outlet radiator hoses several times by hand while warning up the engine.
Stop the engine and wait until the coolant cools down.
Remove the radiator cap and check the coolant level inside the radiator.
If the coolant level is below the full level, perform the steps from (d) through (k) and repeat the operation until the coolant level remains at the full level.
Check the coolant level inside the radiator reservoir tank again. If it is below the full level, add coolant.
Install the engine under cover No. 1 with the 4 bolts. (PRE RUNNER AND 4WD TYPE)
| 55. ADD ENGINE OIL |
Fill with fresh engine oil.
| Drain and refill with oil filter change | 5.8 liters (6.1 US qts, 5.1 lmp. qts) |
| Drain and refill without oil filter change | 5.1 liters (5.4 US qts, 4.5 lmp. qts) |
| Dry fill | 6.1 liters (6.4 US qts, 5.4 lmp. qts) |
| 56. CHECK FOR ENGINE OIL LEVEL |
| 57. CHECK FOR FUEL LEAKAGE |
| 58. CHECK FOR ENGINE COOLANT LEAKAGE |
![]() |
Fill the radiator with coolant and attach a radiator cap tester.
Warm up the engine.
Pump it up to 118 kPa (1.2 kgf/cm2, 17.1 psi) and check that the pressure does not drop.
| 59. CHECK FOR OIL LEAKAGE |
| 60. CHECK FOR EXHAUST GAS LEAKAGE |
| 61. INSPECT IGNITION TIMING |
![]() |
When using a intelligent tester:
Connect the intelligent tester to the DLC3.
Turn the ignition switch to ON.
Turn the intelligent tester ON.
Start the engine and warm it up.
Select the following menu items:
DIAGNOSIS / ENHANCED OBDII / DATA LIST / PRIMARY / IGN ADVANCE.
Check that the ignition timing advances immediately when engine speed is increased.
When not using a intelligent tester:
Turn the ignition switch to ON.
Start the engine and warm it up.
![]() |
Install the tester terminal of a timing light in the position shown in the illustration.
![]() |
Using SST, connect terminals 13 (TC) and 4 (CG) of the DLC3.
Check that the ignition timing is within the specification.
| 62. INSPECT ENGINE IDLE SPEED |
![]() |
When using a intelligent tester:
Connect the intelligent tester to the DLC3
Turn the ignition switch to ON.
Turn the intelligent tester ON.
Start the engine and warm it up.
Select the following menu items:
DIAGNOSIS / ENHANCED OBDII / DATA LIST / PRIMARY / ENGINE SPD.
![]() |
When not using a intelligent tester:
Turn the ignition switch ON.
Start the engine and warm it up.
Install SST onto terminal 9 (TAC) of the DLC3. Connect a tachometer, then measure the engine idling speed.
| 63. INSPECT CO/HC |
Start the engine.
Keep the engine speed at 2,500 rpm for approximately 180 seconds.
Insert the CO/HC meter testing probe at least 40 cm (1.3 ft) into the tailpipe while idling.
Immediately check the CO/HC concentration while idling and/or at 2,500 rpm.
Check the A/F sensor and heated oxygen sensor operation.
See the table below for possible causes, then inspect and correct the applicable parts if necessary.
| CO | HC | Problems | Causes |
| Normal | High | Rough idling |
|
| Low | High | Rough idling (Fluctuation HC reading) |
|
| High | High | Rough idling (Black smoke from exhaust) |
|
| 64. INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY (for Pre Runner and 4WD Type) |
Install the engine under cover No. 1 with the 4 bolts.
| 65. INSTALL NO. 2 ENGINE UNDER COVER SUB-ASSEMBLY (for Pre Runner and 4WD Type, Regular Cab) |
Install the engine under cover No. 2 with the 4 bolts.
| 66. INSTALL HOOD SUB-ASSEMBLY |