Home › ENGINE ยท 1UR-FE › EXHAUST › EXHAUST MANIFOLD

EXHAUST MANIFOLD > INSTALLATION

for Preparation Click here


HINT:
If an exhaust gas leak has been repaired, perform an inspection following the repair (Click here).



1. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY RH


    A215352E01
  1. Install a new gasket to the cylinder head and a new gasket to the No. 3 air tube.

    HINT:
    1. Install the exhaust manifold gasket with the gasket tab facing toward the front of the engine.
    2. Install the air tube gasket with the gasket's claws facing the tube.



    A215351E01
  1. Temporarily install the exhaust manifold with 9 new nuts, and then uniformly tighten the 7 nuts that are not labeled A. Then tighten the 2 nuts labeled A in the illustration.

    Torque:
    for nut A:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }
    except nut A:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }



2. INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR


    A215350
  1. Install the heat insulator with the 3 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



3. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY LH


    A215353E01
  1. Install a new gasket to the cylinder head and a new gasket to the No. 4 air tube.

    HINT:
    1. Install the exhaust manifold gasket with the gasket tab facing toward the rear of the engine.
    2. Install the air tube gasket with the gasket's claws facing the tube.



    A215349E01
  1. Temporarily install the exhaust manifold with 9 new nuts, and then uniformly tighten the 7 nuts that are not labeled A. Then tighten the 2 nuts labeled A in the illustration.

    Torque:
    for nut A:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }
    except nut A:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }



4. INSTALL NO. 2 EXHAUST MANIFOLD HEAT INSULATOR


    A215348
  1. Install the heat insulator with the 3 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



5. INSTALL NO. 1 EGR PIPE SUB-ASSEMBLY
  1. Install 2 new gaskets.



    A214293E01
  1. Install the EGR pipe with the 4 nuts, and tighten the nuts in the sequence shown in the illustration.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }



6. INSTALL FRONT NO. 3 FLOOR HEAT INSULATOR


    A184950
  1. Install the front floor heat insulator with the 4 bolts.

    Torque:
    5.5 N*m{ 56 kgf*cm , 49 in.*lbf }



7. INSTALL FRONT NO. 4 FLOOR HEAT INSULATOR


    A184951
  1. Install the front floor heat insulator with the 4 bolts.

    Torque:
    5.5 N*m{ 56 kgf*cm , 49 in.*lbf }



8. INSTALL FRONT PROPELLER SHAFT ASSEMBLY (for 4WD)
(Click here)


9. INSTALL EXHAUST PIPE ASSEMBLY
(Click here)


10. CONNECT COOLER COMPRESSOR ASSEMBLY


    E147759E01
  1. Install the cooler compressor assembly and 2 stud bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Install the 2 bolts and 2 nuts.

    Torque:
    24.5 N*m{ 250 kgf*cm , 18 ft.*lbf }

    HINT:
    Tighten the bolts and nuts in the order shown in the illustration to install the cooler compressor assembly.

  1. Connect the connector.



11. INSTALL GENERATOR ASSEMBLY
(Click here)


12. INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE
  1. Apply a light coat of engine oil to a new O-ring.

  1. Install the O-ring to the dipstick guide.



    A216301
  1. Install the dipstick guide with the bolt.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Install the dipstick.



13. INSTALL INTAKE MANIFOLD
(Click here)


14. INSPECT FOR EXHAUST GAS LEAK

HINT:
If an exhaust gas leak has been repaired, perform an inspection following the repair (Click here).

If gas is leaking, tighten the areas necessary to stop the leak. Replace damaged parts as necessary.


15. INSTALL FRONT FENDER APRON SEAL REAR LH
  1. Install the fender apron seal with the 5 clips.



16. INSTALL FRONT FENDER APRON SEAL LH
  1. Install the fender apron seal with the 6 clips.



17. INSTALL FRONT FENDER APRON SEAL REAR RH
  1. Install the fender apron seal with the 5 clips.



18. INSTALL FRONT FENDER APRON SEAL RH
  1. Install the fender apron seal with the 6 clips.