Home › Engine / Hybrid System › 1UR-FE COOLING › THERMOSTAT
RM27M0U _51 Engine / Hybrid System _049113 1UR-FE COOLING _0234065 THERMOSTAT A

1UR-FE COOLING  THERMOSTAT  INSTALLATION  


PROCEDURE

Hide 16031 1.INSTALL WATER INLET SUB-ASSEMBLY WITH THERMOSTAT

a.
A215881

Install a new gasket and the water inlet with thermostat with the 3 nuts.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


Hide 16572 2.CONNECT OUTLET RADIATOR HOSE

a.
A217244E01
2.226,2.008 2.483,2.169 0.257,0.161 10 90° 1.156,2.736 1.530,2.892 0.373,0.156 10 Front

Connect the radiator hose.

HINT:

The direction of hose clamp is indicated in the illustration.



Hide 3.INSTALL AIR TUBE SUB-ASSEMBLY LH

a.
A215284

Connect the air hose to the air switching valve LH, and install the air tube LH with the 2 bolts.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


b.

Connect the vacuum sensor connector and clamp.


c.
A217630E01
2.342,2.969 2.663,3.121 0.321,0.152 10 45° 1.683,2.818 2.004,2.970 0.321,0.152 10 90° 0.191,2.513 2.118,2.669 1.927,0.156 10 2 to 7 mm (0.0787 to 0.275 in.) 1.413,4.024 2.203,4.175 0.790,0.151 10 Yellow Paint 1.362,4.108 1.257,4.108 1.257,4.108 1.072,3.713 false 1.734,3.599 2.105,3.750 0.371,0.151 10 Front 2.712,2.49 3.024,2.639 0.312,0.149 10 Top

Connect the air tube LH to the water inlet housing with the bolt.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


d.

Connect the air hose.


e.

Connect the 2 wire harness clamps.

HINT:

When installing the hose, make sure the paint mark and clip are as shown in the illustration.



f.
A215880E01
2.304,2.08 3.116,2.238 0.811,0.158 10 Green Paint 1.757,2.324 2.153,2.166 2.153,2.166 2.261,2.166 false

Connect the water by-pass hose and 2 connectors.

HINT:

When installing the hose, make sure the paint mark and clip are as shown in the illustration.