Home › Brake › BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS › ELECTRONICALLY CONTROLLED BRAKE SYSTEM (for HV Model) › 2020.08–2021.07
RM3700E _54 Brake _093745 BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS _0446873 ELECTRONICALLY CONTROLLED BRAKE SYSTEM(for HV Model) C

BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS  ELECTRONICALLY CONTROLLED BRAKE SYSTEM(for HV Model)  C051212  Right Rear Wheel Speed Sensor Circuit Short to Battery  


DESCRIPTION

Refer to DTC C05121F.

Click hereBrake>BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS>ELECTRONICALLY CONTROLLED BRAKE SYSTEM (for HV Model)>C05121F

DTC No. Detection Item DTC Detection Condition Trouble Area DTC Output from Priority
C051212 Right Rear Wheel Speed Sensor Circuit Short to Battery The speed sensor short signal is ON continuously for 0.5 seconds or more.
·

Rear speed sensor RH*1

·

Rear speed sensor RH (rear axle hub and bearing assembly RH) *2

·

Skid control sensor wire RH (No. 1 parking brake wire assembly)

·

Wire harness and connector

·

Skid control ECU (brake booster with master cylinder assembly)


Brake/EPB A

*1: for AWD

*2: for 2WD


CAUTION / NOTICE / HINT

NOTICE:
·

After replacing the skid control ECU (brake booster with master cylinder assembly), perform "Calibration".

Click hereBrake>BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS>ELECTRONICALLY CONTROLLED BRAKE SYSTEM (for HV Model)>UTILITY

·

After replacing or removing and installing a speed sensor, perform Dealer Mode (Signal Check) inspection to confirm that the speed sensors are operating correctly.

Click hereBrake>BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS>ELECTRONICALLY CONTROLLED BRAKE SYSTEM (for HV Model)>TEST MODE PROCEDURE



PROCEDURE

1.CHECK VEHICLE
a.

Check the vehicle specification.


Result:
Result Proceed to
for 2WD A
for AWD B



A

2.CHECK HARNESS AND CONNECTOR (SENSOR GROUND CIRCUIT)

B

6.CHECK HARNESS AND CONNECTOR (SENSOR GROUND CIRCUIT)
2.CHECK HARNESS AND CONNECTOR (SENSOR GROUND CIRCUIT)

Pre-procedure1

a.

Turn the ignition switch off.


Procedure1

a.

Make sure that there is no looseness at the locking part and the connecting part of the connectors.

OK:

The connector is securely connected.



Pre-procedure2

a.

Disconnect the u2 rear speed sensor RH (rear axle hub and bearing assembly RH) connector.


Procedure2

a.

Check both the connector case and the terminals for deformation and corrosion.

OK:

No deformation or corrosion.



Pre-procedure3

a.

Turn the ignition switch to ON.


Procedure3

a.

Measure the voltage according to the value(s) in the table below.

Standard Voltage:
Tester Connection Condition Specified Condition

Click Location & Routing(u2)Location & Routing

Click Connector(u2)Body>No. 1 Parking Brake Wire Assembly / No. 2 Parking Brake Wire Assembly>Rear Speed Sensor RH (Rear Axle Hub & Bearing Assembly RH)

u2-2 (+) - u2-1 (-) Ignition switch ON 11 to 14 V


HINT:

The rear speed sensor RH is incorporated into the rear axle hub and bearing assembly RH.

If the rear speed sensor RH needs to be replaced, replace the rear axle hub and bearing assembly RH.


Result:
Proceed to
OK
NG



Post-procedure1

a.

Turn the ignition switch off.



OK

REPLACE REAR AXLE HUB AND BEARING ASSEMBLY RH

NG

3.CHECK HARNESS AND CONNECTOR (SENSOR GROUND CIRCUIT)
3.CHECK HARNESS AND CONNECTOR (SENSOR GROUND CIRCUIT)

Pre-procedure1

a.

Turn the ignition switch off.


Procedure1

a.

Make sure that there is no looseness at the locking part and the connecting part of the connectors.

OK:

The connector is securely connected.



Pre-procedure2

a.

Disconnect the uO1 skid control sensor wire RH (No. 1 parking brake wire assembly) connector.


Procedure2

a.

Check both the connector case and the terminals for deformation and corrosion.

OK:

No deformation or corrosion.



Pre-procedure3

a.

Turn the ignition switch to ON.


Procedure3

a.

Measure the voltage according to the value(s) in the table below.

Standard Voltage:
Tester Connection Condition Specified Condition

Click Location & Routing(uO1)Location & Routing

Click Connector(uO1)Body>No. 1 Parking Brake Wire Assembly / No. 2 Parking Brake Wire Assembly>No. 1 Parking Brake Wire Assembly and Floor Wire

uO1-4 (RR+) - uO1-3 (RR-) Ignition switch ON 11 to 14 V


Result:
Proceed to
OK
NG



Post-procedure1

a.

Turn the ignition switch off.



OK

REPLACE NO. 1 PARKING BRAKE WIRE ASSEMBLY

NG

4.CHECK HARNESS AND CONNECTOR (SENSOR GROUND CIRCUIT)
4.CHECK HARNESS AND CONNECTOR (SENSOR GROUND CIRCUIT)

Pre-procedure1

a.

Turn the ignition switch off.


Procedure1

a.

Make sure that there is no looseness at the locking part and the connecting part of the connectors.

OK:

The connector is securely connected.



Pre-procedure2

a.

Disconnect the A38 skid control ECU (brake booster with master cylinder assembly) connector.


Procedure2

a.

Check both the connector case and the terminals for deformation and corrosion.

OK:

No deformation or corrosion.



Procedure3

a.

Measure the voltage according to the value(s) in the table below.

Standard Voltage:
Tester Connection Condition Specified Condition

Click Location & Routing(uO1)Location & Routing

Click Connector(uO1)Body>No. 1 Parking Brake Wire Assembly / No. 2 Parking Brake Wire Assembly>No. 1 Parking Brake Wire Assembly and Floor Wire

uO1-3 (RR-) - Body ground Always Below 1.5 V


Result:
Proceed to
OK
NG



Post-procedure1

a.

None



OK

5.CHECK HARNESS AND CONNECTOR (NO. 1 PARKING BRAKE WIRE ASSEMBLY - BRAKE BOOSTER WITH MASTER CYLINDER ASSEMBLY)

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

5.CHECK HARNESS AND CONNECTOR (NO. 1 PARKING BRAKE WIRE ASSEMBLY - BRAKE BOOSTER WITH MASTER CYLINDER ASSEMBLY)
a.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition

Click Location & Routing(uO1,A38)Location & Routing

Click Connector(uO1)Body>No. 1 Parking Brake Wire Assembly / No. 2 Parking Brake Wire Assembly>No. 1 Parking Brake Wire Assembly and Floor Wire

Click Connector(A38)Engine Compartment>Engine Room Main Wire>Brake Booster with Master Cylinder Assembly

uO1-4 (RR+) or A38-7 (RR+) - uO1-3 (RR-) or A38-8 (RR-) Always 10 kΩ or higher



Result:
Proceed to
OK
NG



OK

REPLACE BRAKE BOOSTER WITH MASTER CYLINDER ASSEMBLY

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

6.CHECK HARNESS AND CONNECTOR (SENSOR GROUND CIRCUIT)

Pre-procedure1

a.

Turn the ignition switch off.


Procedure1

a.

Make sure that there is no looseness at the locking part and the connecting part of the connectors.

OK:

The connector is securely connected.



Pre-procedure2

a.

Disconnect the u2 rear speed sensor RH connector.


Procedure2

a.

Check both the connector case and the terminals for deformation and corrosion.

OK:

No deformation or corrosion.



Pre-procedure3

a.

Turn the ignition switch to ON.


Procedure3

a.

Measure the voltage according to the value(s) in the table below.

Standard Voltage:
Tester Connection Condition Specified Condition

Click Location & Routing(u2)Location & Routing

Click Connector(u2)Body>No. 1 Parking Brake Wire Assembly / No. 2 Parking Brake Wire Assembly>Rear Speed Sensor RH (Rear Axle Hub & Bearing Assembly RH)

u2-1 (+) - u2-2 (-) Ignition switch ON 11 to 14 V


Result:
Proceed to
OK
NG



Post-procedure1

a.

None



OK

NG

7.CHECK HARNESS AND CONNECTOR (SENSOR GROUND CIRCUIT)
7.CHECK HARNESS AND CONNECTOR (SENSOR GROUND CIRCUIT)

Pre-procedure1

a.

Turn the ignition switch off.


Procedure1

a.

Make sure that there is no looseness at the locking part and the connecting part of the connectors.

OK:

The connector is securely connected.



Pre-procedure2

a.

Disconnect the uO1 skid control sensor wire RH (No. 1 parking brake wire assembly) connector.


Procedure2

a.

Check both the connector case and the terminals for deformation and corrosion.

OK:

No deformation or corrosion.



Pre-procedure3

a.

Turn the ignition switch to ON.


Procedure3

a.

Measure the voltage according to the value(s) in the table below.

Standard Voltage:
Tester Connection Condition Specified Condition

Click Location & Routing(uO1)Location & Routing

Click Connector(uO1)Body>No. 1 Parking Brake Wire Assembly / No. 2 Parking Brake Wire Assembly>No. 1 Parking Brake Wire Assembly and Floor Wire

uO1-4 (RR+) - uO1-3 (RR-) Ignition switch ON 11 to 14 V


Result:
Proceed to
OK
NG



Post-procedure1

a.

None



OK

REPLACE NO. 1 PARKING BRAKE WIRE ASSEMBLY

NG

8.CHECK HARNESS AND CONNECTOR (SENSOR GROUND CIRCUIT)
8.CHECK HARNESS AND CONNECTOR (SENSOR GROUND CIRCUIT)

Pre-procedure1

a.

Turn the ignition switch off.


Procedure1

a.

Make sure that there is no looseness at the locking part and the connecting part of the connectors.

OK:

The connector is securely connected.



Pre-procedure2

a.

Disconnect the A38 skid control ECU (brake booster with master cylinder assembly) connector.


Procedure2

a.

Check both the connector case and the terminals for deformation and corrosion.

OK:

No deformation or corrosion.



Procedure3

a.

Measure the voltage according to the value(s) in the table below.

Standard Voltage:
Tester Connection Condition Specified Condition

Click Location & Routing(uO1)Location & Routing

Click Connector(uO1)Body>No. 1 Parking Brake Wire Assembly / No. 2 Parking Brake Wire Assembly>No. 1 Parking Brake Wire Assembly and Floor Wire

uO1-3 (RR-) - Body ground Always Below 1.5 V


Result:
Proceed to
OK
NG



Post-procedure1

a.

None



OK

9.CHECK HARNESS AND CONNECTOR (NO. 1 PARKING BRAKE WIRE ASSEMBLY - BRAKE BOOSTER WITH MASTER CYLINDER ASSEMBLY)

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

9.CHECK HARNESS AND CONNECTOR (NO. 1 PARKING BRAKE WIRE ASSEMBLY - BRAKE BOOSTER WITH MASTER CYLINDER ASSEMBLY)
a.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition

Click Location & Routing(uO1,A38)Location & Routing

Click Connector(uO1)Body>No. 1 Parking Brake Wire Assembly / No. 2 Parking Brake Wire Assembly>No. 1 Parking Brake Wire Assembly and Floor Wire

Click Connector(A38)Engine Compartment>Engine Room Main Wire>Brake Booster with Master Cylinder Assembly

uO1-4 (RR+) or A38-7 (RR+) - uO1-3 (RR-) or A38-8 (RR-) Always 10 kΩ or higher



Result:
Proceed to
OK
NG



OK

REPLACE BRAKE BOOSTER WITH MASTER CYLINDER ASSEMBLY

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR