Refer to DTC C050012.
| DTC No. | Detection Item | DTC Detection Condition | Trouble Area | DTC Output from | Priority |
|---|---|---|---|---|---|
| C14E014 | Left Front Wheel Speed Sensor Supply Voltage Circuit Short to Ground or Open | An open or short in the speed sensor power supply circuit is detected for 0.12 seconds or more. | ·
Front speed sensor LH ·
Wire harness or connector ·
Skid control ECU (brake actuator assembly) |
Brake/EPB | A |
Refer to DTC C050012.
After replacing the skid control ECU (brake actuator assembly), perform acceleration sensor zero point calibration and store system information memorization.
After replacing or removing and installing a speed sensor, perform Dealer Mode (Signal Check) inspection to confirm that the speed sensors are operating correctly.
Check the vehicle specification.
| Result | Proceed to |
|---|---|
| w/ Advanced Park | A |
| w/o Advanced Park | B |
A
B
Procedure1
Make sure that there is no looseness at the locking part and the connecting part of the connectors.
The connector is securely connected.
Pre-procedure1
Disconnect the A22 front speed sensor LH connector.
Procedure2
Check both the connector case and the terminals for deformation and corrosion.
No deformation or corrosion.
Pre-procedure2
Turn the ignition switch to ON.
Procedure3
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
|
Click Location & Routing(A22)Location & Routingewd_type=routing;type=c;code=A22 Click Connector(A22)Engine Compartment>Engine Room Main Wire>Front Speed Sensor LHewd_type=component;type=c;code=A22;pinno=1,2 |
||
| A22-1 (FL+) - A22-2 (FL-) | Ignition switch ON | 11 to 14 V |
| Proceed to |
|---|
| OK |
| NG |
Post-procedure1
None
OK
NG
Procedure1
Make sure that there is no looseness at the locking part and the connecting part of the connectors.
The connector is securely connected.
Pre-procedure1
Disconnect the A39 skid control ECU (brake actuator assembly) connector.
Disconnect the A22 front speed sensor LH connector.
Procedure2
Check both the connector case and the terminals for deformation and corrosion.
No deformation or corrosion.
Procedure3
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
|
Click Location & Routing(A22,A39)Location & Routingewd_type=routing;type=c,c;code=A22,A39 Click Connector(A22)Engine Compartment>Engine Room Main Wire>Front Speed Sensor LHewd_type=component;type=c;code=A22;pinno=1 Click Connector(A39)Engine Compartment>Engine Room Main Wire>Brake Actuator Assemblyewd_type=component;type=c;code=A39;pinno=24 |
||
| A22-1 (FL+) or A39-24 (FL+) - Body ground | Always | 10 kΩ or higher |
| Proceed to |
|---|
| OK |
| NG |
Post-procedure1
None
OK
for RHD: Click hereBrake>BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS>BRAKE ACTUATOR (for HV Model TMMF Made RHD)>REMOVAL
for LHD: Click hereBrake>BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS>BRAKE ACTUATOR (for LHD)>REMOVAL
NG
Procedure1
Make sure that there is no looseness at the locking part and the connecting part of the connectors.
The connector is securely connected.
Pre-procedure1
Disconnect the A22 front speed sensor LH connector.
Pre-procedure2
Check both the connector case and the terminals for deformation and corrosion.
No deformation or corrosion.
Procedure2
Turn the ignition switch to ON.
Procedure3
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
|
Click Location & Routing(A22)Location & Routingewd_type=routing;type=c;code=A22 Click Connector(A22)Engine Compartment>Engine Room Main Wire>Front Speed Sensor LHewd_type=component;type=c;code=A22;pinno=2,1 |
||
| A22-2 (FL+) - A22-1 (FL-) | Ignition switch ON | 11 to 14 V |
| Proceed to |
|---|
| OK |
| NG |
Post-procedure1
None
OK
NG
Procedure1
Make sure that there is no looseness at the locking part and the connecting part of the connectors.
The connector is securely connected.
Pre-procedure1
Disconnect the A39 skid control ECU (brake actuator assembly) connector.
Disconnect the A22 front speed sensor LH connector.
Procedure2
Check both the connector case and the terminals for deformation and corrosion.
No deformation or corrosion.
Procedure3
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
|
Click Location & Routing(A22,A39)Location & Routingewd_type=routing;type=c,c;code=A22,A39 Click Connector(A22)Engine Compartment>Engine Room Main Wire>Front Speed Sensor LHewd_type=component;type=c;code=A22;pinno=2 Click Connector(A39)Engine Compartment>Engine Room Main Wire>Brake Actuator Assemblyewd_type=component;type=c;code=A39;pinno=24 |
||
| A22-2 (FL+) or A39-24 (FL+) - Body ground | Always | 10 kΩ or higher |
| Proceed to |
|---|
| OK |
| NG |
Post-procedure1
None
OK
for RHD: Click hereBrake>BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS>BRAKE ACTUATOR (for HV Model TMMF Made RHD)>REMOVAL
for LHD: Click hereBrake>BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS>BRAKE ACTUATOR (for LHD)>REMOVAL
NG