Home › Power Source / Network › 2NZ-FE BATTERY / CHARGING › GENERATOR
RM19S0E _57 Power Source / Network _051487 2NZ-FE BATTERY / CHARGING _0248283 GENERATOR A

2NZ-FE BATTERY / CHARGING  GENERATOR  INSTALLATION  


PROCEDURE

Hide 27020 1.INSTALL GENERATOR ASSEMBLY

A244006

a.

Temporarily install the generator assembly with the fixing bolt.


b.
A247897E03
2.063,1.406 2.292,1.635 0.229,0.229 10 true A 0.948,0.396 1.188,0.604 0.24,0.208 10 false B

Install the piping clamp with the bolt A and screw B.

Torque:
Bolt A : 9.8 N*m (100 kgf*cm, 87 in.*lbf)


c.
A244005E02
1.75,1.625 1.906,1.802 0.156,0.177 10 false A 0.958,0.865 1.115,1.042 0.156,0.177 10 false B

Temporarily install the fan belt adjusting slider with fan belt adjusting slider fixing bolt A and nut B.


d.

Move generator assembly toward the cylinder block and tighten nut B.

Torque:
19 N*m (194 kgf*cm, 14 ft.*lbf)


e.

Connect the connector and engage the clamp.


f.

Install the wire harness to terminal B with the nut.

Torque:
9.8 N*m (100 kgf*cm, 87 in.*lbf)


g.

Install the terminal cap.


Hide 11212 5.INSTALL NO. 2 CYLINDER HEAD COVER

Hide 6.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Torque:
5.4 N*m (55 kgf*cm, 48 in.*lbf)