P1600 ECM BATT Malfunction
Diagnostic trouble codes · Vehicles built from Nov 2005
DESCRIPTION
Refer to DTC P0685 (Click here).| DTC No. |
DTC Detection Conditions |
Trouble Areas |
| P1600 |
Battery voltage is 4 V or less, or 17 V or more (The MIL is illuminated and a DTC is immediately set when a malfunction is detected) |
|
- HINT:
- DTC P1600 is set when the engine idles for 60 seconds or more.
WIRING DIAGRAM
Refer to DTC P0685 (Click here).INSPECTION PROCEDURE
| 1. INSPECT BATTERY |
Check that the battery is not depleted (Click here).
- OK:
- Battery is not depleted.
|
|
||||
| OK | |
| 2. INSPECT INTEGRATION RELAY (ECD FUSE AND ECD RELAY) |
Remove the integration relay from the engine room relay block.

Inspect the ECD fuse.
Remove the ECD fuse from the integration relay.
Check the ECD fuse resistance.
- Standard resistance:
- Below 1 Ω
Reinstall the ECD fuse.
Inspect the ECD relay.
Check the ECD relay resistance.
- Standard resistance:
Tester Connections
Specified Conditions
1C-1 - 1A-8
10 kΩ or higher
Below 1 Ω
(Apply battery voltage between terminals 1C-1 and 1A-7)
Reinstall the integration relay.
|
|
||||
| OK | |
| 3. CHECK HARNESS AND CONNECTOR (ECD RELAY - ECM, ECD FUSE - BATTERY) |
Check the harness connectors between the ECD relay and ECM.

Remove the integration relay from the engine room relay block.
Disconnect the A49 ECM connector.
Check the resistance.
- Standard resistance (Check for open):
Tester Connections
Specified Conditions
Integration relay (1A-7) - MREL (A49-44)
Below 1 Ω
Integration relay (1A-8) - +B (A49-42)
Integration relay (1A-8) - +B1 (A49-1)
- Standard resistance (Check for short):
Tester Connections
Specified Conditions
Integration relay (1A-7) or MREL (A49-44) - Body ground
10 kΩ or higher
Integration relay (1A-8) or +B (A49-42) - Body ground
Integration relay (1A-8) or +B1 (A49-1) - Body ground
Reinstall the integration relay.
Reconnect the ECM connector.
Check the harness and connector between the ECD fuse and battery.
Remove the integration relay from the engine room relay block.
Disconnect the positive battery cable.
Check the resistance.
- Standard resistance (Check for open):
Tester Connections
Specified Conditions
Positive battery cable terminal - Integration relay (1C-1)
Below 1 Ω
- Standard resistance (Check for short):
Tester Connections
Specified Conditions
Positive battery cable terminal or Integration relay (1C-1) - Body ground
10 kΩ or higher
Reinstall the integration relay.
Reconnect the battery cable.
|
|
||||
| OK | |
| 4. INSPECT GENERATOR ASSEMBLY |
Check the generator assembly (Click here).
- HINT:
- If +B voltage drop is caused by generator malfunctions, the charge light illuminates.
- If the voltage at the terminal of the generator is more than 17 V, the generator malfunctions.
- If +B voltage drop is caused by generator malfunctions, the charge light illuminates.
|
|
||||
| OK | ||
| ||
