89467B
1.INSTALL AIR FUEL RATIO SENSOR (for Bank 2 Sensor 1)
17105
2.INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY LH
Install a new gasket onto the cylinder head.
| *1 | Protrusion |
|
Front |
Be careful of the installation direction.
Temporarily install the manifold with 6 new nuts.
Tighten the 6 nuts in the sequence shown in the illustration.
Connect the air fuel ratio sensor connector.
17168
3.INSTALL NO. 2 EXHAUST MANIFOLD HEAT INSULATOR
Install the heat insulator with the 3 bolts.
17118
4.INSTALL MANIFOLD STAY
Install the manifold stay with the 3 bolts.
89467B
5.INSTALL AIR FUEL RATIO SENSOR (for Bank 1 Sensor 1)
17104
6.INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY RH
Install a new gasket onto the cylinder head.
| *1 | Protrusion |
|
Front |
Be careful of the installation direction.
Temporarily install the manifold with 6 new nuts.
Tighten the 6 nuts in the sequence shown in the illustration.
Connect the air fuel ratio sensor connector.
17167
7.INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR
Install the heat insulator with the 3 bolts.
17119
8.INSTALL NO. 2 MANIFOLD STAY
Install the manifold stay with the 3 bolts.
17410
9.INSTALL FRONT EXHAUST PIPE ASSEMBLY
Install the front exhaust pipe (See page Engine / Hybrid System>1GR-FE INTAKE / EXHAUST>EXHAUST PIPE>INSTALLATION).
10.INSTALL AIR CLEANER CASE SUB-ASSEMBLY
11.INSTALL AIR CLEANER CAP AND HOSE
11259
12.INSTALL V-BANK COVER
53292A
13.INSTALL UPPER RADIATOR SUPPORT SEAL
14.INSPECT FOR EXHAUST GAS LEAK
53737B
15.INSTALL FRONT FENDER APRON SEAL LH
w/ KDSS:
Install the apron seal with the 7 clips.
w/o KDSS:
Install the apron seal with the 4 clips.
53736
16.INSTALL FRONT FENDER APRON SEAL RH
Install the apron seal with the 5 clips.
53737A
17.INSTALL FRONT NO. 1 FENDER APRON TO FRAME SEAL LH
Install the frame seal with the 5 clips.
53736B
18.INSTALL FRONT NO. 1 FENDER APRON TO FRAME SEAL RH
Install the frame seal with the 5 clips.