Home › Engine / Hybrid System › N04C-WA (FUEL) › FUEL INJECTOR › from 2019.08
RM2850E _51 Engine / Hybrid System _082613 N04C-WA FUEL _0400842 FUEL INJECTOR A

N04C-WA FUEL  FUEL INJECTOR  INSTALLATION  


PROCEDURE

Hide 23670 1.INSTALL INJECTOR ASSEMBLY

NOTICE:
A450436C02
2.76,0.51 3.01,0.271 false 3.031,0.115 3.344,0.271 0.313,0.156 10 false *a
*a Injector Compensation Code


Register the injector compensation code of a new fuel injector assembly in the ECM when replacing the fuel injector assembly. Register the injector compensation code in advance so that it can be installed in the correct position.


a.

Install 4 new injection nozzle seat gaskets to the cylinder head sub-assembly.


b.

Apply a small amount of clean engine oil to 4 new O-rings.


c.
A450435C02
1.354,1.188 0.906,0.438 false 0.771,0.281 1.083,0.438 0.313,0.156 10 false *a
*a O-ring


Install the O-ring to each injector assembly as shown in the illustration.


d.

Install a new gasket to each injector assembly.


e.

Referring to each cylinder number identification tag attached to the fuel injector assemblies, insert the fuel injector assembly, nozzle holder clamp, and nozzle holder clamp bolt for each cylinder.

NOTICE:
·

Check that the tip of the fuel injector assembly has no foreign matter attached.

·

When reusing the fuel injector assemblies, reinstall them to the same cylinder they were removed from. Otherwise, it could cause the engine to malfunction.

·

Carefully insert the fuel injector assembly so that the O-ring is not caught between the cylinder head sub-assembly and the injector assembly.




f.

Temporarily install the 4 nozzle holder clamps with the 4 nozzle holder clamp bolts.

NOTICE:

Be sure to install the holder clamps and nozzle holder clamp bolts in their original positions.



g.

Install 4 new holder seals.

NOTICE:

Securely insert the tip of each holder seal into each fuel injector.



h.
A223952

Temporarily install the nozzle leakage pipe assembly and 5 new gaskets with the 5 hollow screws.

NOTICE:

Make sure that the hollow screws and nozzle leakage pipe assembly are not deformed or damaged.



i.

Temporarily install the union nuts of the injection pipe sub-assemblies No. 1, No. 2, No. 3 and No. 4 by hand.


j.

Tighten the 4 nozzle holder clamp bolts.

Torque:
25 N*m (255 kgf*cm, 18 ft.*lbf)

NOTICE:

After tightening the nozzle holder clamp bolts, check that the fuel injector and the nozzle holder clamp do not interfere with the valve spring.



k.

Tighten the 5 hollow screws.

Torque:
18 N*m (184 kgf*cm, 13 ft.*lbf)

NOTICE:

If the nozzle leakage pipe assembly has been tightened to more than the specified torque, replace it with a new one.



l.
A450683C02
0.719,0.229 0.958,0.427 0.24,0.198 10 true *a
*a Torque Wrench Fulcrum Length


Using a union nut wrench (17 mm), tighten the 8 union nuts.

Torque:
Specified tightening torque : 44 N*m (449 kgf*cm, 32 ft.*lbf)

HINT:
·

Calculate the torque wrench reading when changing the fulcrum length of the torque wrench.

·

When using a union nut wrench (fulcrum length of 30 mm (1.18 in.)) + torque wrench (fulcrum length of 180 mm (7.09 in.)): 37.7 N*m (384 kgf*cm, 28 ft.*lbf)




m.
A450680

Install the 3 injection pipe clamps with the 3 nuts.

HINT:

Tighten the nut until the clamp edge makes contact with the engine side clamp edge.



Hide 11202D 2.INSTALL NO. 2 CYLINDER HEAD COVER SUB-ASSEMBLY

Hide 25608 3.INSTALL EGR COOLER SUB-ASSEMBLY

Hide 4.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Hide 5.REGISTER INJECTOR COMPENSATION CODE

Hide 6.INSPECT FOR INJECTOR COMPENSATION CODE