Home › Engine / Hybrid System › 2GR-FE STARTING › ENGINE SWITCH › from 2016.05
RM24M0E _51 Engine / Hybrid System _059574 2GR-FE STARTING _0292071 ENGINE SWITCH A

2GR-FE STARTING  ENGINE SWITCH  INSTALLATION  


PROCEDURE

Hide 89611 1.INSTALL ENGINE SWITCH (for LHD)

a.
A387633

Engage the 2 claws to install the engine switch.


Hide 55474B 2.INSTALL INSTRUMENT CLUSTER FINISH PANEL GARNISH (for LHD)

Hide 55041B 3.INSTALL NO. 1 INSTRUMENT PANEL BOX DOOR SUB-ASSEMBLY (for LHD)

Hide 55650 4.INSTALL NO. 1 INSTRUMENT PANEL REGISTER ASSEMBLY (for LHD)

Hide 55042B 5.INSTALL NO. 2 INSTRUMENT PANEL BOX DOOR SUB-ASSEMBLY (for LHD)

Hide 55660 6.INSTALL NO. 2 INSTRUMENT PANEL REGISTER ASSEMBLY (for LHD)

Hide 7.INSTALL NAVIGATION RECEIVER ASSEMBLY WITH BRACKET (for LHD, for Navigation Receiver Type)

Hide 55414A 8.INSTALL INSTRUMENT CLUSTER FINISH PANEL END (for LHD, w/o Navigation System)

Hide 55420A 9.INSTALL INSTRUMENT CLUSTER FINISH PANEL CENTER ASSEMBLY (for LHD)

Hide 10.INSTALL ENGINE SWITCH (for RHD)

a.
A383269

Engage the 2 claws to install the engine switch.


Hide 55041B 11.INSTALL NO. 1 INSTRUMENT PANEL BOX DOOR SUB-ASSEMBLY (for RHD)

Hide 55420A 12.INSTALL CENTER INSTRUMENT CLUSTER FINISH PANEL ASSEMBLY (for RHD)

Hide 33504F 13.INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY (for RHD)

Hide 14.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL