Home › Engine / Hybrid System › 2GR-FE CHARGING › GENERATOR
RM24M0E _51 Engine / Hybrid System _059577 2GR-FE CHARGING _0292086 GENERATOR A

2GR-FE CHARGING  GENERATOR  INSTALLATION  


PROCEDURE

Hide 27020 1.INSTALL GENERATOR ASSEMBLY

a.
A135391

Install the bracket with the bolt.

Torque:
20 N*m (204 kgf*cm, 15 ft.*lbf)


b.
A395323E01
0.385,1.771 1.302,1.969 0.917,0.198 10 false :Clamp

Connect the wire harness clamp.


c.

Install the generator assembly to the cylinder block with the nut.

Torque:
20 N*m (204 kgf*cm, 15 ft.*lbf)


d.
A394008

Install the 2 bolts.

Torque:
43 N*m (438 kgf*cm, 32 ft.*lbf)


e.
A395322E01
0.396,1.76 1.313,1.958 0.917,0.198 10 false :Clamp

Connect the generator connector to the generator assembly.


f.

Install the generator wire with the nut.

Torque:
9.8 N*m (100 kgf*cm, 87 in.*lbf)


g.

Install the terminal cap.


h.

Connect the wire harness clamp.


i.

Connect the magnetic clutch connector to the compressor and magnetic clutch.


j.
A160953

Install the 2 bolts.

Torque:
8.4 N*m (85 kgf*cm, 74 in.*lbf)


Hide 16400 3.INSTALL RADIATOR ASSEMBLY WITH FAN SHROUD AND FAN MOTOR

Hide 28800J 4.CONNECT CABLE FROM NEGATIVE BATTERY TERMINAL

a.

Connect the negative (-) cable to the battery negative (-) terminal.

Torque:
5.4 N*m (55 kgf*cm, 48 in.*lbf)

NOTICE:

When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page General>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION).