1.INSTALL SHIFT LEVER ASSEMBLY
Install the floor shift with the 4 bolts and screw.
for 12 mm bolt
Connect the 2 connectors.
33820B
2.CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY
Rotate the transmission control cable nut counterclockwise approximately 180° and, while holding the nut in that position, press in the stopper until it makes 2 "click" sounds.
Install the cable outer of the transmission control cable to the shift lever retainer, check that the position of the spring is the same as A shown in the illustration, and press in the stopper.
If the stopper cannot be pressed in, slightly rotate the nut clockwise and then press in the stopper.
Connect the control cable to the shift lever.
Make sure the cable is installed to the base of the pin.
3.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
4.INSPECT SHIFT LEVER POSITION
5.ADJUST SHIFT LEVER POSITION
55900A
6.INSTALL HEATER CONTROL AND ACCESSORY
55434B
7.INSTALL INSTRUMENT PANEL FINISH PANEL LOWER CENTER
55432B
8.INSTALL INSTRUMENT PANEL FINISH PANEL LOWER
58533C
9.INSTALL FLOOR CARPET COVER CENTER LH
58534E
10.INSTALL FLOOR CARPET COVER CENTER RH
55606
11.INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY
55550
12.INSTALL GLOVE COMPARTMENT DOOR ASSEMBLY
55447C
13.INSTALL NO. 1 SWITCH HOLE BASE
55474B
14.INSTALL INSTRUMENT CLUSTER FINISH PANEL GARNISH
55041B
15.INSTALL NO. 1 INSTRUMENT PANEL BOX DOOR SUB-ASSEMBLY
55660
16.INSTALL NO. 2 INSTRUMENT PANEL REGISTER ASSEMBLY
55042B
17.INSTALL NO. 2 INSTRUMENT PANEL BOX DOOR SUB-ASSEMBLY
55650
18.INSTALL NO. 1 INSTRUMENT PANEL REGISTER ASSEMBLY
55414A
19.INSTALL INSTRUMENT CLUSTER FINISH PANEL END
55420A
20.INSTALL INSTRUMENT CLUSTER FINISH PANEL CENTER ASSEMBLY
33504F
21.INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY
22.PERFORM INITIALIZATION
Perform initialization (see page General>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION).
Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.