INSTALLATION
Removal / installation · Vehicles built from Aug 2013
Versions by build date: Jul 2007 – Jul 2009 Aug 2009 – Oct 2010 Nov 2010 – Jul 2013 from Aug 2013
| 1. INSTALL LOWER DEFROSTER NOZZLE ASSEMBLY |
Engage the 4 claws and install the lower defroster nozzle.
| 2. INSTALL HEATER TO REGISTER DUCT ASSEMBLY |
Engage the 4 claws and install the heater to register duct.
| 3. INSTALL AIR CONDITIONING UNIT ASSEMBLY |
![]() ![]() |
Install the air conditioning unit with the 2 screws as shown in the illustration.
| 4. INSTALL INSTRUMENT PANEL REINFORCEMENT ASSEMBLY (for LHD) |
Provisionally install the air conditioning unit assembly.
Insert the bracket hook into the holes of the reinforcement bracket, and provisionally install the reinforcement.
Install the instrument panel reinforcement with the 7 bolts.
Install the 2 caps.


Install the 5 bolts.


- NOTICE:
- Tighten the bolts in the sequence order shown in the illustration to install the air conditioner unit assembly.
- Torque:
- 9.8 N*m{ 100 kgf*cm , 87 in.*lbf } for bolt
Install the 2 nuts.
- Torque:
- 5.4 N*m{ 55 kgf*cm , 48 in.*lbf } for nut
Engage the clamps.
Connect the connectors.
Connect the wire harness with the 3 bolts and 5 nuts.
- Torque:
- 7.3 N*m{ 74 kgf*cm , 65 in.*lbf } for nut
| 5. INSTALL INSTRUMENT PANEL REINFORCEMENT ASSEMBLY (for RHD) |
Provisionally install the air conditioning unit assembly.
Insert the bracket hook into the holes of the reinforcement bracket, and provisionally install the reinforcement.
Install the instrument panel reinforcement with the 7 bolts.
Install the 2 caps.
Install the 5 bolts.


- NOTICE:
- Tighten the bolts in the sequence order shown in the illustration to install the air conditioner unit assembly.
- Torque:
- 9.8 N*m{ 100 kgf*cm , 87 in.*lbf } for bolt
Install the 2 nuts.
- Torque:
- 5.4 N*m{ 55 kgf*cm , 48 in.*lbf } for nut
Engage the clamps.
Connect the connectors.
Connect the wire harness with the bolts and nuts.
| 6. INSTALL COOLER UNIT DRAIN HOSE |
Install the cooler unit drain hose.

| 7. INSTALL MAIN BODY ECU (for LHD) |
Install the main body ECU with the 2 nuts.

- Torque:
- 8.4 N*m{ 86 kgf*cm , 74 in.*lbf }
| 8. INSTALL MAIN BODY ECU (for RHD) |
Install the main body ECU with the 3 nuts.

- Torque:
- 8.0 N*m{ 82 kgf*cm , 71 in.*lbf }
Engage the clamps.
Connect the connectors.
- NOTICE:
- Be sure to engage each connector securely.
| 9. INSTALL INSTRUMENT PANEL SIDE BRACKET (for LHD) |
Install the instrument panel side bracket with the bolt.

- Torque:
- 8.4 N*m{ 86 kgf*cm , 74 in.*lbf }
| 10. INSTALL STEERING COLUMN ASSEMBLY |
| 11. INSTALL ECM |
Install the ECM with the 3 nuts.
- Torque:
- 5.5 N*m{ 56 kgf*cm , 49 in.*lbf }
Connect the 6 connectors.
| 12. INSTALL NO. 1 INSTRUMENT PANEL BRACE MOUNTING BRACKET |
![]() ![]() |
Install the instrument panel brace mounting bracket with the bolt and nut.
- HINT:
- Use the same procedure for both sides.
| 13. INSTALL NO. 1 AIR DUCT (for LHD) |
Engage the 3 claws and install the air duct.
| 14. INSTALL NO. 1 AIR DUCT (for RHD) |
Engage the 2 claws and install the air duct.
Tighten the screw.
| 15. INSTALL NO. 2 AIR DUCT |
Engage the 3 claws and install the air duct.
| 16. INSTALL REAR NO. 1 AIR DUCT |
Engage the 6 claws and 3 clamps and install the air duct.
Return the front floor mat to its original position.
| 17. INSTALL REAR NO. 2 AIR DUCT |
Engage the 6 claws and 3 clamps and install the air duct.
Return the front floor mat to its original position.
| 18. INSTALL NO. 1 HEATER TO REGISTER DUCT |
Install the heater to register duct with the clip.
| 19. INSTALL NO. 2 HEATER TO REGISTER DUCT (for LHD) |
Install the heater to register duct with the screw.
| 20. INSTALL NO. 2 HEATER TO REGISTER DUCT (for RHD) |
Install the heater to register duct with the clip.
| 21. INSTALL INSTRUMENT PANEL FINISH PANEL END LH (for LHD) |
Engage the 3 claws and install the instrument panel finish panel end.
| 22. INSTALL INSTRUMENT PANEL SUB-ASSEMBLY (for LHD) |
| 23. INSTALL INSTRUMENT PANEL SUB-ASSEMBLY (for RHD) |
| 24. CONNECT HEATER WATER OUTLET HOSE A (FROM HEATER UNIT) |
Install the heater water outlet hose onto the heater unit.

Text in Illustration *a
A
*b
View A
*c
UP Side
*d
LH Side
*e
Blue Paint Mark
- NOTICE:
- Perform the installation with the hose clip and mark at the correct angle as shown in the illustration.
| 25. CONNECT HEATER WATER HOSE INLET |
Install the heater water inlet hose onto the heater unit.

Text in Illustration *a
A
*b
View A
*c
UP Side
*d
LH Side
*e
Green Paint Mark
- NOTICE:
- Perform the installation with the hose clip and mark at the correct angle as shown in the illustration.
| 26. INSTALL COOLER REFRIGERANT LIQUID PIPE A |
Remove the vinyl tape from liquid pipe and the connecting portion of the unit.
Apply sufficient compressor oil (ND-OIL8) to a new O-ring and the connecting part of the liquid pipe.
- Compressor oil:
- ND-OIL8 or the equivalent
Install the O-ring onto the liquid pipe.
Install the liquid pipe and piping clamp.

Text in Illustration *a
Correct
*b
Wrong
*c
Gap
- HINT:
- After connection, check the claw fitting of the piping clamp.
| 27. INSTALL COOLER REFRIGERANT SUCTION PIPE A |
- HINT:
- Connection procedure of the suction pipe is the same as for the liquid pipe.
| 28. INSTALL COWL TOP VENTILATOR LOUVER LH |
| 29. ADD ENGINE COOLANT |
Tighten the cylinder block drain cock plug.
- Torque:
- 13 N*m{ 133 kgf*cm , 10 ft.*lbf }
Tighten the radiator drain cock plug by hand.
Remove the vinyl hose from the radiator drain cock of the radiator assembly.
Add engine coolant.
- Standard Capacity:
Item
Specified Condition
for Automatic Transmission
9.8 liters (10.4 US qts, 8.6 Imp. qts)
for Manual Transmission
9.4 liters (9.9 US qts, 8.3 Imp. qts)
- NOTICE:
- Do not substitute plain water for engine coolant.
- HINT:
- TOYOTA vehicles are filled with TOYOTA SLLC at the factory. In order to avoid damage to the engine cooling system and other technical problems, only use TOYOTA SLLC or similar high quality ethylene glycol based non-silicate, non-amine, non-nitrite, non-borate engine coolant with long-life hybrid organic acid technology (engine coolant with long-life hybrid organic acid technology consists of a combination of low phosphates and organic acids).
- Press the No. 1 radiator hose and No. 2 radiator hose several times by hand, and then check the engine coolant level. If the engine coolant level is low, add engine coolant.
- TOYOTA vehicles are filled with TOYOTA SLLC at the factory. In order to avoid damage to the engine cooling system and other technical problems, only use TOYOTA SLLC or similar high quality ethylene glycol based non-silicate, non-amine, non-nitrite, non-borate engine coolant with long-life hybrid organic acid technology (engine coolant with long-life hybrid organic acid technology consists of a combination of low phosphates and organic acids).
Slowly pour engine coolant into the radiator reservoir until it reaches the Full line.

Text in Illustration *a
Full Line
Install the radiator reserve tank cap sub-assembly.
Install the radiator cap sub-assembly.*1
Start the engine and stop it immediately.*2
Allow approximately 10 seconds to pass, and then remove the radiator cap sub-assembly and check the engine coolant level. If the engine coolant level has decreased, add engine coolant.*3
Repeat steps *1, *2 and *3 until the engine coolant level does not decrease.
- HINT:
- Be sure to perform this step while the engine is cold, as air in the No. 1 radiator hose will flow into the radiator assembly if the engine is warmed up and the thermostat opens.
Install the radiator cap sub-assembly.*4
Set the air conditioning as follows.*5
Item
Condition
Fan speed
Any setting except off
Temperature
Toward WARM
Air conditioning switch
Off
Start the engine, warm it up until the thermostat opens, and then continue to run the engine for several minutes to circulate the engine coolant.*6
- CAUTION:
- Wear protective gloves. Hot areas on the parts may injure your hands.
- Be careful of the fan.
- Be careful as the engine, radiator assembly and radiator hoses are hot and can cause burns.
- Wear protective gloves. Hot areas on the parts may injure your hands.
- NOTICE:
- Immediately after starting the engine, if the radiator reservoir becomes empty, perform the following: 1) stop the engine, 2) wait until the engine coolant has cooled down, and 3) add engine coolant until the engine coolant is filled to the Full line.
- Do not start the engine when there is no engine coolant in the radiator reservoir.
- Pay attention to the needle of the engine coolant temperature receiver gauge. Make sure that the needle does not show an abnormally high temperature.
- If there is not enough engine coolant, the engine may burn out or overheat.
- Immediately after starting the engine, if the radiator reservoir becomes empty, perform the following: 1) stop the engine, 2) wait until the engine coolant has cooled down, and 3) add engine coolant until the engine coolant is filled to the Full line.
- HINT:
- Press the No. 1 radiator hose and No. 2 radiator hose several times by hand to bleed air while warming up the engine.
- The thermostat opening timing can be confirmed by pressing the No. 2 radiator hose by hand and checking when the engine coolant starts to flow inside the hose.
- Press the No. 1 radiator hose and No. 2 radiator hose several times by hand to bleed air while warming up the engine.
Stop the engine, wait until the engine coolant cools down to ambient temperature, and then remove the radiator cap sub-assembly and check the engine coolant level.*7
- CAUTION:
- Do not remove the radiator cap sub-assembly while the engine and radiator assembly are still hot. Pressurized, hot engine coolant and steam may be released and cause serious burns.
If the engine coolant level has decreased, add engine coolant and warm up the engine until the thermostat opens.*8
If the engine coolant level has not decreased, check that the engine coolant level in the radiator reservoir is at the Full line.

If the engine coolant level is below the Full line, repeat steps *4 through *8.
If the engine coolant level is above the Full line, drain engine coolant until the engine coolant level reaches the Full line.Text in Illustration *a
Full Line
Install the service hole cover to the engine under cover.
| 30. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
- Torque:
- 5.4 N*m{ 55 kgf*cm , 48 in.*lbf }
| 31. CHECK SRS WARNING LIGHT |
| 32. CHARGE REFRIGERANT |


- NOTICE:
- Charge refrigerant in accordance with the equipment manual.
Perform vacuum purging using a vacuum pump.
Charge refrigerant HFC-134a (R134a).
- SST
- 09985-20010
(09985-02010, 09985-02050, 09985-02060, 09985-02070, 09985-02080, 09985-02090, 09985-02110, 09985-02130, 09985-02140, 09985-02150)
- Standard:
- 570 to 630 g (20.11 to 22.22 oz.)
- NOTICE:
- Do not start the engine before charging it with refrigerant as the cooler compressor doesn't work properly without sufficient refrigerant. This could cause the compressor to overheat.
- Approximately 100 g (3.5 oz.) of refrigerant may need to be charged after bubbles disappear.
The volume of refrigerant should be measured, not checked with the sight glass.
- Do not start the engine before charging it with refrigerant as the cooler compressor doesn't work properly without sufficient refrigerant. This could cause the compressor to overheat.
- HINT:
- The relationship between the refrigerant charge amount and the pressure is as follows.


- High Charge Range:
If the refrigerant is overcharged, the pressure rises on the high-pressure side. High-pressure cut off frequently occurs. This causes insufficient cooling performance and also insufficient compressor lubrication.
- Low Charge Range:
A shortage of refrigerant causes insufficient cooling performance and low circulation of refrigerant oil, which shortens the compressor life. Operation with insufficient coolant raises the refrigerant temperature and causes heat deterioration of the rubber seals and hoses. Cracking and subsequent refrigerant leakage may occur.
- The relationship between the refrigerant charge amount and the pressure is as follows.
Install the caps onto the service valves on the refrigerant line.
| 33. WARM UP ENGINE |
- NOTICE:
- Warm up the engine at less than 2,000 rpm for 1 minute or more after charging it with refrigerant.
| 34. INSPECT FOR COOLANT LEAK |
- CAUTION:
- To avoid being burned, do not remove the radiator reservoir cap while the engine and radiator are still hot. Thermal expansion may cause hot engine coolant and steam to blow out from the radiator.
Fill the radiator with engine coolant, and then attach a radiator cap tester.
Warm up the engine.
Using the radiator cap tester, increase the pressure inside the radiator to 123 kPa (1.3 kgf/cm2, 18 psi), and then check that the pressure does not drop.

If the pressure drops, check the hoses, radiator and water pump for leakage. If there are no signs or traces of external engine coolant leakage, check the heater core, cylinder block and head.Text in Illustration *1
Radiator Cap Tester
| 35. INSPECT FOR REFRIGERANT LEAK |
After recharging the refrigerant gas, check for refrigerant gas leakage using a halogen leak detector.
Perform the operation as follows:
- Stop the engine.
- Secure good ventilation (the halogen leak detector may react to volatile gases other than refrigerant, such as evaporated gasoline or exhaust gas).
- Repeat the test 2 or 3 times.
- Make sure that some refrigerant remains in the refrigeration system.
When the compressor is off: approximately 392 to 588 kPa (4 to 6 kgf*cm2, 57 to 85 psi)
- HINT:
- It is impossible for the above pressure to be maintained if there is leakage.
- Stop the engine.
Using the halogen leak detector, check the refrigerant line, especially at the connection points, for leakage.

Bring the halogen leak detector close to the drain hose before performing the test.

- HINT:
- After the blower motor has stopped, leave the cooling unit for at least 15 minutes.
- Place the halogen leak detector sensor under the drain hose.
- When bringing the halogen leak detector close to the drain hose, make sure that the halogen leak detector does not react to the volatile gases.
- After the blower motor has stopped, leave the cooling unit for at least 15 minutes.
If no gas leakage is detected from the drain hose, remove the blower motor from the cooling unit. Insert the halogen leak detector sensor into the unit and perform the test.
Disconnect the pressure switch connector and leave it for approximately 20 minutes. Bring the halogen leak detector close to the pressure switch and perform the test.
| 36. POSITION FRONT WHEELS FACING STRAIGHT AHEAD |


