2014-2019 Hiace · Service Manual ENGINE

Fuel Injector Circuit

Circuit diagnosis · Vehicles built Jan 2015 – Mar 2016

Versions by build date: Oct 2014 – Dec 2014 Jan 2015 – Mar 2016 from Apr 2016

DESCRIPTION

The fuel injectors are located on the cylinder head. They inject fuel into the cylinders based on the signals from the ECM.

WIRING DIAGRAM

Refer to DTC P0300 (Click here).

INSPECTION PROCEDURE

NOTICE:
Inspect the fuses for circuits related to this system before performing the following inspection procedure.


1. INSPECT FUEL INJECTOR ASSEMBLY (POWER SOURCE)
A208644E29
  1. Disconnect the fuel injector connectors.

  1. Turn the ignition switch to ON.

  1. Measure the voltage according to the value(s) in the table below.

    Standard Voltage:
    Tester Connection
    Switch Condition
    Specified Condition
    D24-1 - Body ground
    Ignition switch ON
    11 to 14 V
    D25-1 - Body ground
    Ignition switch ON
    11 to 14 V
    D26-1 - Body ground
    Ignition switch ON
    11 to 14 V
    D27-1 - Body ground
    Ignition switch ON
    11 to 14 V

    Text in Illustration 
    *a
    Front view of wire harness connector
    (to Fuel Injector Assembly)



NG
Go to step 4
OK


2. INSPECT FUEL INJECTOR ASSEMBLY
  1. Inspect the fuel injector assembly (Click here).



NG
REPLACE FUEL INJECTOR ASSEMBLY (Click here)
OK


3. CHECK HARNESS AND CONNECTOR (FUEL INJECTOR - ECM)
  1. Disconnect the fuel injector connectors.

  1. Disconnect the ECM connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    D24-2 - D97-86 (#10)
    Always
    Below 1 Ω
    D25-2 - D97-85 (#20)
    Always
    Below 1 Ω
    D26-2 - D97-84 (#30)
    Always
    Below 1 Ω
    D27-2 - D97-83 (#40)
    Always
    Below 1 Ω
    D24-2 or D97-86 (#10) - Body ground
    Always
    10 kΩ or higher
    D25-2 or D97-85 (#20) - Body ground
    Always
    10 kΩ or higher
    D26-2 or D97-84 (#30) - Body ground
    Always
    10 kΩ or higher
    D27-2 or D97-83 (#40) - Body ground
    Always
    10 kΩ or higher



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK

REPLACE ECM (Click here)

4. CHECK HARNESS AND CONNECTOR (FUEL INJECTOR - NO. 1 INTEGRATION RELAY)
  1. Disconnect the fuel injector connectors.

  1. Remove the No. 1 integration relay from the No. 1 engine room relay block.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    D24-1 - 10B-4
    Always
    Below 1 Ω
    D25-1 - 10B-4
    Always
    Below 1 Ω
    D26-1 - 10B-4
    Always
    Below 1 Ω
    D27-1 - 10B-4
    Always
    Below 1 Ω
    D24-1 or 10B-4 - Body ground
    Always
    10 kΩ or higher
    D25-1 or 10B-4 - Body ground
    Always
    10 kΩ or higher
    D26-1 or 10B-4 - Body ground
    Always
    10 kΩ or higher
    D27-1 or 10B-4 - Body ground
    Always
    10 kΩ or higher



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK


5. INSPECT NO. 1 INTEGRATION RELAY (INJ)
  1. Inspect the No. 1 integration relay (INJ) (Click here).



NG
REPLACE NO. 1 INTEGRATION RELAY
OK


6. CHECK NO. 1 INTEGRATION RELAY (POWER SOURCE)
A321249E01
  1. Remove the No. 1 integration relay from the No. 1 engine room relay block.

  1. Measure the voltage according to the value(s) in the table below.

    Standard Voltage:
    Tester Connection
    Condition
    Specified Condition
    10B-1 - Body ground
    Always
    11 to 14 V

    Text in Illustration 
    *a
    Front view of wire harness connector
    (to No. 1 Integration Relay)



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (NO. 1 INTEGRATION RELAY - BATTERY)
OK


7. CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY - BODY GROUND)
  1. Remove the No. 1 integration relay from the No. 1 engine room relay block.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    10B-3 - Body ground
    Always
    Below 1 Ω

    Result 
    Result
    Proceed to
    OK (w/ Air Pressure Sensor)
    A
    OK (w/o Air Pressure Sensor)
    B
    NG
    C



B
Go to step 9

C
REPAIR OR REPLACE HARNESS OR CONNECTOR
A


8. CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY - NO. 1 INTEGRATION RELAY)
  1. Remove the No. 1 integration relay from the No. 1 engine room relay block.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    10A-8 - 10B-2
    Always
    Below 1 Ω
    10A-8 or 10B-2 - Body ground
    Always
    10 kΩ or higher



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK

CHECK ECM POWER SOURCE CIRCUIT (Click here)

9. CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY - NO. 2 INTEGRATION RELAY)
  1. Remove the No. 1 integration relay from the No. 1 engine room relay block.

  1. Remove the No. 2 integration relay from the instrument panel relay block.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    12B-7 - 10B-2
    Always
    Below 1 Ω
    12B-7 or 10B-2 - Body ground
    Always
    10 kΩ or higher



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK

CHECK ECM POWER SOURCE CIRCUIT (Click here)


← Fuel Injector Circuit (Oct 2014 – Dec 2014)Fuel Injector Circuit (from Apr 2016) →