Home › Steering › POWER ASSIST SYSTEMS › VANE PUMP (for 1GD-FTV(w/ Variable Flow Control Solenoid Valve)) › 2019.02–2021.07
RM35X0E _55 Steering _078944 POWER ASSIST SYSTEMS _0388797 VANE PUMP(for 1GD-FTV(w/ Variable Flow Control Solenoid Valve)) A

POWER ASSIST SYSTEMS  VANE PUMP(for 1GD-FTV(w/ Variable Flow Control Solenoid Valve))  INSTALLATION  


PROCEDURE

Hide 44310 1.INSTALL VANE PUMP ASSEMBLY

a.

Install the vane pump assembly with the 2 bolts.

Torque:
21 N*m (214 kgf*cm, 15 ft.*lbf)


Hide 44410 2.CONNECT PRESSURE FEED TUBE ASSEMBLY

a.

Install a new gasket to the pressure feed tube assembly.


b.
C412772C01
0.615,1.625 0.698,1.302 true 0.5,1.656 0.708,1.906 0.208,0.25 10 true *a
*a Stopper


Install the union bolt and connect the pressure feed tube assembly to the vane pump assembly.

Torque:
50 N*m (510 kgf*cm, 37 ft.*lbf)

HINT:

Make sure that the stopper of the pressure feed tube assembly touches the front housing.



c.

Connect the connector.


Hide 44348D 3.CONNECT NO. 2 OIL RESERVOIR TO PUMP HOSE

a.

Connect the No. 2 oil reservoir to pump hose to the vane pump assembly and slide the hose clip.


b.

Connect the connector to the power steering oil pressure switch.


Hide 16361A 4.INSTALL FAN AND GENERATOR V BELT

Hide 12601B 5.INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY (w/ Cover)

Hide 6.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Hide 7. INITIALIZATION AFTER RECONNECTING BATTERY TERMINAL

Click hereGeneral>SETUP>WHEN DISCONNECTING OR RECONNECTING BATTERY TERMINAL>WORK PROCEDURE

HINT:

When disconnecting and reconnecting the battery, there is an automatic learning function that completes learning when the respective system is used.

Click hereGeneral>SETUP>WHEN DISCONNECTING OR RECONNECTING BATTERY TERMINAL>AUTOMATIC LEARNING CHART


Hide 8.ADD POWER STEERING FLUID

Hide 10.INSPECT FOR POWER STEERING FLUID LEAK