Home › ENGINE › 2GR-FE ENGINE CONTROL SYSTEM › SFI SYSTEM
Cranking Holding Function Circuit
Circuit diagnosis · Vehicles built May 2007 – Jul 2008
Versions by build date: May 2007 – Jul 2008 Aug 2008 – Jun 2010 from Jul 2010
DESCRIPTION
The system detects the ignition switch's starting signal (STSW) and then supplies current to the starter until the ECM judges that the engine has started successfully. The purpose is to reduce the holding time of the ignition key. WIRING DIAGRAM
INSPECTION PROCEDURE
1. CHECK CRANKING
When starting the engine, check whether the starter motor starts.
OK:
Engine is cranking.
NG
OK
2. READ VALUE USING INTELLIGENT TESTER (STA SIGNAL)
Connect the intelligent tester to the DLC3.
Turn the ignition switch on (IG).
Turn the tester on.
Select the following menu items: Powertrain / Engine and ECT / Data List / Starter Signal.
Check the result when the ignition switch is turned on (IG) and when the engine is started.
OK:
Display (Starter Signal)
Condition
OFF
Ignition switch on (IG)
ON
Engine start
NG
OK
3. INSPECT ST RELAY
Remove the ST relay from the engine room relay block.
Measure the resistance according to the value(s) in the table below.
Standard resistance:
Tester Connection
Condition
Specified Condition
3 - 5
When no battery voltage applied terminals 1 and 2
10 kΩ or higher
3 - 5
When battery voltage applied terminals 1 and 2
Below 1 Ω
Reinstall the ST relay.
NG
OK
4. CHECK HARNESS AND CONNECTOR (PARK/NEUTRAL POSITION SWITCH - ST RELAY)
Disconnect the park/neutral position switch connector.
Remove the ST relay from the engine room relay block.
Measure the resistance according to the value(s) in the table below.
Standard resistance (check for open):
Tester Connection
Condition
Specified Condition
B5-5 - ST relay terminal (2)
Always
Below 1 Ω
Standard resistance (check for short):
Tester Connection
Condition
Specified Condition
B5-5 or ST relay terminal (2) - Body ground
Always
10 kΩ or higher
Reconnect the park/neutral position switch connector.
Reinstall the ST relay.
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (PARK/NEUTRAL POSITION SWITCH - ST RELAY)
OK
5. CHECK HARNESS AND CONNECTOR (ST RELAY - BODY GROUND)
Remove the ST relay from the engine room relay block.
Measure the resistance according to the value(s) in the table below.
Standard resistance:
Tester Connection
Condition
Specified Condition
ST relay terminal (2) - Body ground
Always
Below 1 Ω
Reinstall the ST relay to the engine room relay block.
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (ST RELAY - BODY GROUND)
OK
6. INSPECT TERMINAL VOLTAGE (ST RELAY TERMINAL)
Remove the ST relay from the engine room relay block.
Measure the voltage according to the value(s) in the table below.
Standard voltage:
Tester Connection
Condition
Specified Condition
ST relay terminal (5) - Body ground
Always
9 to 14 V
Reinstall the ST relay to the engine room relay block.
NG
OK
7. INSPECT STARTER ASSEMBLY
Inspect the starter assembly (Click here ).
NG
OK
8. CHECK HARNESS AND CONNECTOR (ST RELAY - STARTER ASSEMBLY)
Remove the ST relay from the engine room relay block.
Disconnect the starter connector.
Measure the resistance according to the value(s) in the table below.
Standard resistance (check for open):
Tester Connection
Condition
Specified Condition
ST relay terminal (3) - B12-1
Always
Below 1 Ω
Standard resistance (check for short):
Tester Connection
Condition
Specified Condition
ST relay terminal (3) or B12-1 - Body ground
Always
10 kΩ or higher
Reconnect the starter connector.
Reinstall the ST relay.
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (ST RELAY - STARTER ASSEMBLY)
OK
REPAIR OR REPLACE HARNESS OR CONNECTOR (BATTERY - STARTER ASSEMBLY)
9. INSPECT FUSIBLE LINK (ST FUSE)
Remove the fusible link from the engine room relay block.
Measure the resistance according to the value(s) in the table below.
Standard resistance:
Tester Connection
Condition
Specified Condition
Fusible link
Always
Below 1 Ω
Reinstall the fusible link.
NG
OK
REPAIR OR REPLACE HARNESS OR CONNECTOR (BATTERY - STARTER RELAY)
10. CHECK ECM (STAR AND STSW VOLTAGE)
Start the engine.
Measure the voltage according to the value(s) in the table below.
Standard voltage:
Tester Connection
Condition
Specified Condition
B3-12 (STSW) - Body ground
Cranking
9 to 14 V
Result:
Terminal STAR
Terminal STSW
Proceed to
9 to 14 V
9 to 14 V
A
0 V
9 to 14 V
B
0 V
0 V
C
B
C
A
11. INSPECT PARK/NEUTRAL POSITION SWITCH
Disconnect the park/neutral position switch connector.
Measure the resistance according to the value(s) in the table below.
Standard resistance:
Shift Position
Tester Connection
Specified Condition
P
2 - 6, 4 - 5
Below 1 Ω
R
1 - 2
Below 1 Ω
N
2 - 9, 4 - 5
Below 1 Ω
D
2 - 7
Below 1 Ω
2
2 - 3
Below 1 Ω
L
2 - 8
Below 1 Ω
Result:
Result
Proceed To
OK
A
NG (with U151E))
B
NG (with U151F)
C
Reconnect the park/neutral position switch connector.
B
C
A
12. CHECK HARNESS AND CONNECTOR (ECM - PARK/NEUTRAL POSITION SWITCH)
Disconnect the ECM connector.
Disconnect the park/neutral position switch connector.
Measure the resistance according to the value(s) in the table below.
Standard resistance (check for open):
Tester Connection
Condition
Specified Condition
B3-11 (STA) - B5-5
Always
Below 1 Ω
Standard resistance (check for short):
Tester Connection
Condition
Specified Condition
B3-11 (STA) or B5-5 - Body ground
Always
10 kΩ or higher
Reconnect the ECM connector.
Reconnect the park/neutral position switch connector.
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (ECM - PARK/NEUTRAL POSITION SWITCH)
OK
13. INSPECT RELAY (ST CUT RELAY)
Remove the ST CUT relay from the engine room relay block.
Measure the resistance according to the value(s) in the table below.
Standard resistance:
Tester Connection
Condition
Specified Condition
3 - 5
When no battery voltage applied terminals 1 and 2
10 kΩ or higher
3 - 5
When battery voltage applied terminals 1 and 2
Below 1 Ω
Reinstall the ST CUT relay.
NG
OK
14. INSPECT TERMINAL VOLTAGE (ST CUT RELAY TERMINAL)
Remove the ST CUT relay from the engine room relay block.
Turn the ignition switch on (IG).
Measure the voltage according to the value(s) in the table below.
Standard voltage:
Tester Connection
Switch Condition
Specified Condition
2 - Body ground
Ignition switch on (IG)
9 to 14 V
Reinstall the ST CUT relay.
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (ST CUT RELAY - IG2 RELAY)
OK
REPAIR OR REPLACE HARNESS OR CONNECTOR (ST CUT RELAY - BODY GROUND)
15. CHECK HARNESS AND CONNECTOR (ECM - MAIN BODY ECU)
Disconnect the ECM connector.
Disconnect the main body ECU connector.
Measure the resistance according to the value(s) in the table below.
Standard resistance (check for open):
Tester Connection
Condition
Specified Condition
B3-12 (STSW) - D9-4 (STSW)
Always
Below 1 Ω
Standard resistance (check for short):
Tester Connection
Condition
Specified Condition
B3-12 (STSW) or D9-4 (STSW) - Body ground
Always
10 kΩ or higher
Reconnect the ECM connector.
Reconnect the main body ECU connector.
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (ECM - IGNITION SWITCH ASSEMBLY)
OK