When replacing the injectors (including shuffling the injectors between the cylinders), common rail or cylinder head, it is necessary to replace the injection pipes with new ones.
When replacing the fuel supply pump, common rail, cylinder block, cylinder head, cylinder head gasket or timing gear case, it is necessary to replace the fuel inlet pipe with a new one.
When replacing the common rail, do not remove the foreign object mixing prevention caps of the common rail until just before the fuel inlet pipe and injection pipe are connected to the common rail.
After removing the fuel inlet pipe, clean it with a brush and compressed air.
1.INSTALL COMMON RAIL ASSEMBLY
Install the common rail and No. 2 intake manifold insulator with the 2 bolts.
Connect the 2 connectors.
2.INSTALL FUEL INLET PIPE SUB-ASSEMBLY
3.INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE
4.INSTALL NO. 2 NOZZLE LEAKAGE PIPE ASSEMBLY
Temporarily install the No. 2 nozzle leakage pipe with the 3 bolts.
Temporarily install a new gasket and the union bolt.
Tighten the 3 bolts and union bolt.
Connect the 3 fuel hoses.
5.INSTALL NO. 4 INJECTION PIPE SUB-ASSEMBLY
6.TEMPORARILY INSTALL ELECTRIC EGR CONTROL VALVE ASSEMBLY WITH NO. 2 EGR VALVE AND EGR COOLER (w/ EGR Cooler)
7.INSTALL NO. 2 INTAKE AIR CONNECTOR (w/ EGR Cooler)
8.TEMPORARILY INSTALL INTAKE AIR CONNECTOR (w/ EGR Cooler)
9.TIGHTEN NO. 2 INTAKE AIR CONNECTOR AND INTAKE AIR CONNECTOR (w/ EGR Cooler)
10.TIGHTEN INTAKE AIR CONNECTOR AND INTAKE MANIFOLD (w/ EGR Cooler)
11.TIGHTEN EGR COOLER (w/ EGR Cooler)
12.INSTALL NO. 2 INTAKE AIR CONNECTOR BRACKET (w/ EGR Cooler)
13.INSTALL ELECTRIC VACUUM REGULATING VALVE ASSEMBLY (w/ EGR Cooler)
14.INSTALL NO. 1 GAS FILTER WITH GAS FILTER BRACKET (w/ EGR Cooler)
15.CONNECT NO. 3 WATER BY-PASS PIPE (w/ EGR Cooler)
16.INSTALL NO. 1, NO. 2 AND NO. 3 INJECTION PIPE SUB-ASSEMBLY
17.CONNECT NO. 4 WATER BY-PASS HOSE (w/ EGR Cooler)
18.CONNECT NO. 3 WATER BY-PASS HOSE (w/ EGR Cooler)
19.INSTALL OIL FILTER SUB-ASSEMBLY
20.INSTALL MANIFOLD STAY WITH VACUUM SWITCHING VALVE (w/ EGR Cooler)
21.INSTALL MANIFOLD STAY (w/o EGR Cooler)
22.INSTALL DIESEL THROTTLE BODY ASSEMBLY (w/ EGR Cooler)
23.INSTALL INTERCOOLER ASSEMBLY (w/o EGR Cooler)
25.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page General>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION).
26.BLEED AIR FROM FUEL SYSTEM
27.ADD ENGINE COOLANT (w/ EGR Cooler)
28.INSPECT FOR COOLANT LEAK (w/ EGR Cooler)
29.INSPECT FOR FUEL LEAK
30.INSPECT FOR OIL LEAK
31.INSPECT ENGINE OIL LEVEL
32.INSTALL NO. 2 ENGINE UNDER COVER
33.INSTALL NO. 1 ENGINE UNDER COVER