Home › SUSPENSION & AXLE › SUSPENSION › REAR UPPER CONTROL ARM

REAR UPPER CONTROL ARM > INSTALLATION

for Preparation Click here


HINT:
  1. Use the same procedures for the RH side and LH side.
  2. The procedures listed below are for the LH side.
  3. A bolt without a torque specification is shown in the standard bolt chart (Click here).



1. INSTALL UPPER CONTROL ARM ASSEMBLY
  1. Temporarily install the control arm with the 2 bolts and 2 nuts.



2. INSTALL FUEL TANK ASSEMBLY
  1. for 2TR-FE:
    (Click here)

  1. for 1KD-FTV:
    (Click here)

  1. for 1GR-FE:
    (Click here)

  1. for 2TR-FBE:
    (Click here)



3. INSTALL CENTER EXHAUST PIPE ASSEMBLY
  1. for 2TR-FE:
    (Click here)

  1. for 1KD-FTV:
    (Click here)

  1. for 1GR-FE:
    (Click here)

  1. for 2TR-FBE:
    (Click here)



4. INSTALL REAR WHEEL

Torque:
105 N*m{ 1,071 kgf*cm , 77 ft.*lbf }



5. STABILIZE SUSPENSION
  1. Lower the vehicle.

  1. Press down on the vehicle several time to stabilize the suspension.



6. TIGHTEN UPPER CONTROL ARM ASSEMBLY
  1. Tighten the 2 bolts.

    Torque:
    145 N*m{ 1,479 kgf*cm , 107 ft.*lbf }

    HINT:
    While fixing the nut in place, tighten the bolts.