The necessary procedures (adjustment, calibration, initialization, or registration) that must be performed after parts are removed, installed, or replaced during the camshaft removal/installation are shown below.
| Replacement Part or Procedure | Necessary Procedures | Effects/Inoperative when not Performed | Link |
|---|---|---|---|
except i-ART:
Replacement of injector assembly |
·
Injector compensation code registration ·
Pilot quantity learning |
Engine starting |
|
·
Replacement of diesel throttle body assembly ·
Replacement of electric EGR control valve assembly ·
Replacement of turbocharger sub-assembly ·
Replacement of turbocharger sub-assembly or turbocharger variable nozzle motor |
Perform initialization | - |
|
To prevent burns, do not touch the engine, exhaust manifold or other high temperature components while the engine is hot.
When replacing the parts in the following chart (A), replace the No. 1 injection pipe sub-assembly, No. 2 injection pipe sub-assembly and/or fuel inlet pipe sub-assembly with new ones.
| Replaced Parts (A) | Pipes Requiring New Replacement |
|---|---|
| Injector assembly (including shuffling the injector assemblies between the cylinders) | ·
No. 1 injection pipe sub-assembly ·
No. 2 injection pipe sub-assembly |
| Supply pump assembly | Fuel inlet pipe sub-assembly |
·
Common rail assembly ·
Cylinder block sub-assembly ·
Cylinder head sub-assembly ·
Cylinder head gasket ·
Timing chain case assembly |
·
No. 1 injection pipe sub-assembly ·
No. 2 injection pipe sub-assembly ·
Fuel inlet pipe sub-assembly |
After removing the No. 1 injection pipe sub-assembly, No. 2 injection pipe sub-assembly and/or fuel inlet pipe sub-assembly, clean them with a brush and compressed air.
The injector assembly is a precision instrument. Do not use the injector assembly if it is struck or dropped.
Make sure foreign matter does not enter the fuel path.
1. PRECAUTION
After turning the ignition switch off, waiting time may be required before disconnecting the cable from the battery terminal. Therefore, make sure to read the disconnecting the cable from the battery terminal notice before proceeding with work.
Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>PRECAUTION
2.DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION
51410
3.REMOVE NO. 1 ENGINE UNDER COVER ASSEMBLY
4.DRAIN ENGINE COOLANT
5.REMOVE FRONT BUMPER
12601B
6.REMOVE NO. 1 ENGINE COVER SUB-ASSEMBLY
16593
7.REMOVE NO. 1 RADIATOR AIR GUIDE
17344E
8.REMOVE NO. 4 AIR HOSE
17362B
9.REMOVE NO. 2 AIR TUBE
16571C
10.REMOVE NO. 1 RADIATOR HOSE
44360
11.DISCONNECT VANE PUMP OIL RESERVOIR ASSEMBLY
44369A
12.REMOVE NO. 1 OIL RESERVOIR BRACKET
16470
13.REMOVE RADIATOR RESERVE TANK ASSEMBLY
32942
14.DISCONNECT NO. 1 OIL COOLER OUTLET HOSE (for Automatic Transmission)
32941
15.DISCONNECT NO. 1 OIL COOLER INLET HOSE (for Automatic Transmission)
16711
16.REMOVE FAN SHROUD
16572D
17.DISCONNECT NO. 2 RADIATOR HOSE
16400
18.REMOVE RADIATOR ASSEMBLY
17363K
19.REMOVE INTERCOOLER AIR TUBE
26100G
20.REMOVE DIESEL THROTTLE BODY ASSEMBLY
16278
21.REMOVE NO. 2 WATER BY-PASS PIPE
23811H
22.REMOVE NO. 1 FUEL PIPE (w/ DPF)
23265C
23.REMOVE GAS FILTER
89421C
24.REMOVE TURBO PRESSURE SENSOR
44763C
25.REMOVE NO. 2 HOSE TO HOSE TUBE
12632
26.REMOVE NO. 2 ENGINE COVER BRACKET
23300
27.DISCONNECT FUEL FILTER ASSEMBLY
82121
28.DISCONNECT ENGINE WIRE
25625
29.REMOVE EGR VALVE BRACKET
25612
30.REMOVE NO. 2 EGR PIPE
16206B
31.DISCONNECT NO. 3 WATER BY-PASS PIPE SUB-ASSEMBLY
16209
32.REMOVE NO. 4 WATER BY-PASS PIPE SUB-ASSEMBLY
25601
33.REMOVE NO. 1 EGR PIPE SUB-ASSEMBLY
25804
34.REMOVE VACUUM CONTROL VALVE SET
35.REMOVE NO. 1 EGR COOLER AND NO. 2 EGR VALVE ASSEMBLY WITH ELECTRIC EGR CONTROL VALVE ASSEMBLY
36.REMOVE WIRING HARNESS CLAMP BRACKET
37.REMOVE HARNESS BRACKET
23760
38.REMOVE NOZZLE LEAKAGE PIPE ASSEMBLY
39.REMOVE NO. 1 INJECTION PIPE SUB-ASSEMBLY AND NO. 2 INJECTION PIPE SUB-ASSEMBLY
23670
40.REMOVE INJECTOR ASSEMBLY
23682
41.REMOVE NOZZLE HOLDER GASKET
11301M
42.REMOVE CAMSHAFT POSITION SENSOR
11201
43.REMOVE CYLINDER HEAD COVER SUB-ASSEMBLY
44.SET NO. 1 CYLINDER TO TDC/COMPRESSION
| *a | Timing Mark |
| *b | Paint Mark |
Align the timing mark of the crankshaft pulley and timing chain cover by rotating the crankshaft clockwise.
Make sure that the timing mark of the camshaft timing sprocket is at the top.
If the timing mark is not at the top, turn the crankshaft pulley 1 revolution so that the timing mark is at the top (set the No. 1 piston to TDC/compression).
Place paint marks on the No. 2 chain sub-assembly.
45.REMOVE NO. 3 CAMSHAFT BEARING CAP
Remove the 2 bolts and No. 3 camshaft bearing cap from the cylinder head sub-assembly.
29300
46.REMOVE VACUUM PUMP ASSEMBLY
11382C
47.REMOVE CAMSHAFT OIL SEAL RETAINER
13566B
48.REMOVE TIMING CHAIN GUIDE
Remove the bolt and timing chain guide from the cylinder head sub-assembly.
49.REMOVE CAMSHAFT
Remove the oil pump relief valve plug and gasket from timing chain cover.
| *a | Stopper Plate |
| *b | Pin |
Insert a pin into stopper plate hole of the No. 2 chain tensioner assembly and lock the No. 2 chain tensioner assembly.
| *1 | No. 1 Camshaft |
| *2 | No. 2 Camshaft |
Hold the hexagonal portion of the camshaft with a wrench and loosen the 2 bolts from the No. 1 camshaft and No. 2 camshaft.
Be careful not to damage the cylinder head sub-assembly with the wrench.
Using several steps, and remove the 20 bolt, No. 1 camshaft bearing cap and 8 No. 2 camshaft bearing caps from the cylinder head sub-assembly.
Raise the No. 1 camshaft and remove the bolt from the No. 1 camshaft.
Raise the No. 2 camshaft and remove the bolt from the No. 2 camshaft.
Remove the No. 2 camshaft from the camshaft timing sprocket.
Remove the camshaft timing sprocket from the No. 2 chain sub-assembly.
Remove the No. 1 camshaft from the camshaft timing sprocket.
Remove the camshaft timing sprocket from the No. 2 chain sub-assembly.
Suspend the No. 2 chain sub-assembly with a string or equivalent.
Be careful not to drop the No. 2 chain sub-assembly inside the timing chain cover assembly.