33146
1.INSTALL EXTENSION HOUSING DUST DEFLECTOR
Using SST and hammer, tap in the extension housing dust deflector.
2.INSTALL WIRING HARNESS CLAMP BRACKET
Install the 6 bolts and 5 wiring harness clamp brackets to the manual transmission assembly.
33019C
3.INSTALL TRANSMISSION BREATHER SUB-ASSEMBLY
Install the 3 bolts and 3 brackets to the manual transmission assembly.
Install the transmission breather sub-assembly to the control shift lever retainer sub-assembly.
Attach the 4 breather hose clamps.
4.INSTALL MANUAL TRANSMISSION ASSEMBLY
Install the manual transmission assembly with the 5 bolts.
5.CONNECT WIRE HARNESS
Connect the connector.
Install the bolt.
Attach the 3 wire harness clamps.
12371A
6.INSTALL REAR ENGINE MOUNTING INSULATOR
Install the rear engine mounting insulator to the manual transmission assembly with the 4 bolts.
51204
7.INSTALL NO. 3 FRAME CROSSMEMBER SUB-ASSEMBLY
Install the No. 3 frame crossmember sub-assembly with the 4 nuts and 4 bolts.
Install the 4 bolts to the No. 3 frame crossmember sub-assembly.
8.CONNECT GROUND CABLE
Connect the ground cable with the bolt.
37100
9.INSTALL PROPELLER SHAFT WITH CENTER BEARING ASSEMBLY
33119
10.INSTALL STIFFENER PLATE LH
Install the stiffener plate LH with the 4 bolts.
33118
11.INSTALL STIFFENER PLATE RH
Install the stiffener plate RH with the 4 bolts.
12584
12.INSTALL NO. 4 CYLINDER BLOCK INSULATOR
Install the No. 4 cylinder block insulator.
28100
13.INSTALL STARTER ASSEMBLY (for 1KD-FTV)
for 2.0 kW Type:
Click hereEngine / Hybrid System>1KD-FTV STARTING>STARTER(for 2.0 kW Type)>INSTALLATION
for 2.2 kW Type:
Click hereEngine / Hybrid System>1KD-FTV STARTING>STARTER(for 2.2 kW Type)>INSTALLATION
28100
14.INSTALL STARTER ASSEMBLY (for 2KD-FTV)
for 2.0 kW Type:
Click hereEngine / Hybrid System>2KD-FTV STARTING>STARTER(for 2.0 kW Type)>INSTALLATION
for 2.2 kW Type:
Click hereEngine / Hybrid System>2KD-FTV STARTING>STARTER(for 2.2 kW Type)>INSTALLATION
28100
15.INSTALL STARTER ASSEMBLY (for 2GD-FTV)
for 2.0 kW Type:
Click hereEngine / Hybrid System>2GD-FTV STARTING>STARTER(for 2.0 kW Type)>INSTALLATION
for 2.2 kW Type:
Click hereEngine / Hybrid System>2GD-FTV STARTING>STARTER(for 2.2 kW Type)>INSTALLATION
17410
16.INSTALL FRONT EXHAUST PIPE ASSEMBLY (for 1KD-FTV)
17410
17.INSTALL FRONT EXHAUST PIPE ASSEMBLY (for 2KD-FTV)
17410
18.INSTALL FRONT EXHAUST PIPE ASSEMBLY (for 2GD-FTV)
19.ADD MANUAL TRANSMISSION OIL
51442
20.INSTALL NO. 2 ENGINE UNDER COVER
51410
21.INSTALL NO. 1 ENGINE UNDER COVER ASSEMBLY
33548F
22.INSTALL NO. 1 FLOOR SHIFT BUSH
Install the No. 1 floor shift bush to the floor shift shift lever assembly.
33530F
23.INSTALL FLOOR SHIFT SHIFT LEVER ASSEMBLY
|
MP grease |
Apply MP grease to the tip of the floor shift shift lever assembly.
| *1 | Shift Lever Cap |
| *a | Press Down |
| *b | Clockwise |
| *c | Lock |
Cover the shift lever cap with a cloth.
While pressing down on the shift lever cap, turn it clockwise to install the floor shift shift lever assembly.
Attach the shift lever cap boot.
58280A
24.INSTALL SHIFT LEVER BOOT ASSEMBLY
Install the shift lever boot assembly with the 6 screws and 4 clips.
58810J
25.INSTALL CONSOLE BOX ASSEMBLY (w/ Console Box Lid)
58811A
26.INSTALL FRONT CONSOLE BOX (w/o Console Box Lid)
28800
27.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION