The injector driver drives the injectors at high speeds with a high-voltage DC/DC converter. The ECM constantly monitors the injector driver and stops the engine if an abnormal condition is detected.
Refer to DTC P0200 (See page Engine / Hybrid System>1KD-FTV (ENGINE CONTROL)>ECD SYSTEM>P0200).
After replacing the ECM, the new ECM needs registration (See page Engine / Hybrid System>1KD-FTV (ENGINE CONTROL)>ECD SYSTEM>REGISTRATION) and initialization (See page Engine / Hybrid System>1KD-FTV (ENGINE CONTROL)>ECD SYSTEM>INITIALIZATION).
Inspect the fuses of circuits related to this system before performing the following inspection procedure.
Disconnect the injector driver connectors.
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Switch Condition | Specified Condition |
|---|---|---|
| C88-2 (+B) - C88-3 (GND) | Ignition switch ON | 11 to 14 V |
| *a | Front view of wire harness connector
(to Injector Driver) |
Reconnect the injector driver connector.
OK
NG
Inspect the No. 1 integration relay (EDU) (See page Engine / Hybrid System>1KD-FTV (ENGINE CONTROL)>RELAY>ON-VEHICLE INSPECTION).
OK
NG
Remove the No. 1 integration relay from the engine room relay block.
Disconnect the injector driver connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| C88-2 (+B) - 1B-8 | Always | Below 1 Ω |
| C88-3 (GND) - Body ground | Always | Below 1 Ω |
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| C88-2 (+B) or 1B-8 - Body ground | Always | 10 kΩ or higher |
Reconnect the No. 1 injector driver connector.
Reinstall the integration relay.
OK
NG
Remove the No. 1 integration relay from the engine room relay block.
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| G58-12 (IREL) - 1B-7 | Always | Below 1 Ω |
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| G58-12 (IREL) or 1B-7 - Body ground | Always | 10 kΩ or higher |
Reconnect the ECM connector.
Reinstall the No. 1 integration relay.
OK
NG