Home › Steering › POWER ASSIST SYSTEMS › VANE PUMP (for 1GR-FE) › from 2020.08
RM27T0E _55 Steering _053717 POWER ASSIST SYSTEMS _0260946 VANE PUMP(for 1GR-FE) A

POWER ASSIST SYSTEMS  VANE PUMP(for 1GR-FE)  INSTALLATION  


PROCEDURE

Hide 44310 1.INSTALL VANE PUMP ASSEMBLY

a.

Install the vane pump with the 2 bolts.

Torque:
43 N*m (438 kgf*cm, 32 ft.*lbf)


b.

Install the wire harness bracket with the bolt.

Torque:
43 N*m (438 kgf*cm, 32 ft.*lbf)


Hide 44410 2.CONNECT PRESSURE FEED TUBE

a.

Install a new gasket to the pressure feed tube.


b.

Connect the pressure feed tube and install the union bolt.

Torque:
50 N*m (510 kgf*cm, 37 ft.*lbf)

HINT:

Make sure the stopper of the pressure feed tube touches the vane pump.



Hide 44348A 3.CONNECT NO. 1 OIL RESERVOIR TO PUMP HOSE

a.

Connect the No. 1 oil reservoir to pump hose to the vane pump assembly with the clip.


Hide 4.CONNECT POWER STEERING OIL PRESSURE SWITCH CONNECTOR

a.

Connect the 2 connectors.


Hide 6.INSTALL AIR CLEANER CASE

Hide 17801 7.INSTALL AIR CLEANER FILTER ELEMENT SUB-ASSEMBLY

Hide 11.INSTALL FRONT WHEEL RH

Torque:
for steel wheel : 112 N*m (1137 kgf*cm, 82 ft.*lbf)
for aluminum wheel : 103 N*m (1050 kgf*cm, 76 ft.*lbf)

Hide 12.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Hide 13.ADD POWER STEERING FLUID

Hide 15.INSPECT FOR POWER STEERING FLUID LEAK

Hide 16. INITIALIZATION AFTER RECONNECTING BATTERY TERMINAL

Click hereGeneral>SETUP>WHEN DISCONNECTING OR RECONNECTING BATTERY TERMINAL>WORK PROCEDURE

HINT:

When disconnecting and reconnecting the battery, there is an automatic learning function that completes learning when the respective system is used.

Click hereGeneral>SETUP>WHEN DISCONNECTING OR RECONNECTING BATTERY TERMINAL>AUTOMATIC LEARNING CHART