44250
1.INSTALL RACK AND PINION POWER STEERING GEAR ASSEMBLY
Install the steering gear assembly with the 2 bolts and 2 nuts.
Hold the nuts and tighten the bolts to install the power steering link assembly.
44410
2.CONNECT PRESSURE FEED TUBE ASSEMBLY (for LHD)
Install the pressure feed tube clamp with the bolts.
Connect the pressure feed tube (return tube side) to the steering gear with the clamp.
Using a union nut wrench, connect the pressure feed tube (pressure feed tube side) to the steering gear and connect the tube to the vane pump.
Use the formula to calculate special torque values for situations where a union nut wrench is combined with a torque wrench (See page General>INTRODUCTION>REPAIR INSTRUCTION>PRECAUTION).
44410
3.CONNECT PRESSURE FEED TUBE ASSEMBLY (for RHD)
Use the same procedure described for LHD vehicles.
45047
4.CONNECT TIE ROD END SUB-ASSEMBLY LH
Connect the tie rod end to the steering knuckle with the nut.
Tighten the nut up to an additional 60° if the holes for the cotter pin are not aligned.
Install a new cotter pin.
45046
5.CONNECT TIE ROD END SUB-ASSEMBLY RH
Use the same procedure described for the LH side.
45203
6.CONNECT NO. 2 STEERING INTERMEDIATE SHAFT
for Manual Tilt and Manual Telescopic Steering Column:
Connect the No. 2 steering intermediate shaft (See page Steering>STEERING COLUMN>STEERING COLUMN ASSEMBLY (for Manual Tilt and Manual Telescopic Steering Column)>INSTALLATION).
for Power Tilt and Power Telescopic Steering Column:
Connect the No. 2 steering intermediate shaft (See page Steering>STEERING COLUMN>STEERING COLUMN ASSEMBLY (for Power Tilt and Power Telescopic Steering Column)>INSTALLATION).
7.INSTALL ENGINE ASSEMBLY
for 1GR-FE:
Install the engine (See page Engine / Hybrid System>1GR-FE (ENGINE MECHANICAL)>ENGINE ASSEMBLY>INSTALLATION).
for 5L-E:
Install the engine (See page Engine / Hybrid System>5L-E (ENGINE MECHANICAL)>ENGINE ASSEMBLY>INSTALLATION).
for 2TR-FE:
Install the engine (See page Engine / Hybrid System>2TR-FE (ENGINE MECHANICAL)>ENGINE ASSEMBLY>INSTALLATION).
for 1GD-FTV:
Install the engine (See page Engine / Hybrid System>1GD-FTV (ENGINE MECHANICAL)>ENGINE ASSEMBLY>INSTALLATION).
8.ADD POWER STEERING FLUID
9.BLEED POWER STEERING FLUID
for 1GR-FE:
Bleed the power steering fluid (See page Steering>POWER ASSIST SYSTEMS>VANE PUMP (for 1GR-FE)>ON-VEHICLE INSPECTION).
for 5L-E:
Bleed the power steering fluid (See page Steering>POWER ASSIST SYSTEMS>VANE PUMP(for 5L-E)>ON-VEHICLE INSPECTION).
for 2TR-FE:
Bleed the power steering fluid (See page Steering>POWER ASSIST SYSTEMS>VANE PUMP (for 2TR-FE)>ON-VEHICLE INSPECTION).
for 1GD-FTV:
Bleed the power steering fluid (See page Steering>POWER ASSIST SYSTEMS>VANE PUMP (for 1GD-FTV)>ON-VEHICLE INSPECTION).
10.CHECK FOR POWER STEERING FLUID LEAK
11.INSTALL FRONT WHEELS
12.PLACE FRONT WHEELS FACING STRAIGHT AHEAD
13.ADJUST FRONT WHEEL ALIGNMENT