2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

REMOVAL

Removal / installation · Vehicles built from Jan 2012


1. REMOVE ENGINE WIRE

2. REMOVE FUEL HOSE
  1. Remove the fuel pipe clamp.

  1. A272573
    Disconnect the 2 clamps and remove the fuel hose (Click here).


3. REMOVE FUEL TUBE SUB-ASSEMBLY

  1. A272572
    Remove the 2 bolts and fuel tube (Click here).


4. REMOVE AIR SWITCHING VALVE ASSEMBLY (w/ Secondary Air Injection System)
  1. for Bank 1 (Click here)
  2. for Bank 2 (Click here)

5. REMOVE NO. 4 AIR TUBE (w/ Secondary Air Injection System)

  1. A214892
    Remove the bolt and No. 4 air tube.


6. REMOVE NO. 3 AIR TUBE (w/ Secondary Air Injection System)

  1. A214893
    Remove the bolt and No. 3 air tube.


7. REMOVE NO. 2 WATER BY-PASS PIPE

  1. A274163
    Disconnect the hose and remove the 2 bolts and No. 2 water by-pass pipe.


8. REMOVE NO. 8 WATER BY-PASS HOSE

A274164

9. DISCONNECT NO. 11 WATER BY-PASS HOSE

A274165

10. REMOVE NO. 1 WATER OUTLET PIPE

  1. A239696
    Remove the 2 bolts and No. 1 water outlet pipe.


11. REMOVE NO. 1 EGR PIPE BRACKET

  1. A239697
    Remove the 3 bolts and No. 1 EGR pipe bracket.


12. REMOVE FRONT NO. 1 ENGINE MOUNTING BRACKET RH

  1. A228368
    Remove the 4 bolts and front No. 1 engine mounting bracket RH.


13. REMOVE FRONT NO. 1 ENGINE MOUNTING BRACKET LH

  1. A228367
    Remove the 4 bolts and front No. 1 engine mounting bracket LH.


14. REMOVE FUEL DELIVERY PIPE SUB-ASSEMBLY

  1. A218695
    Disconnect the No. 6 wire harness connector.

  1. Remove the 2 bolts and fuel delivery pipe.

    NOTICE:
    When removing the delivery pipe, hold the pipe by both ends and pull it straight upward.

  1. Remove the 2 delivery pipe spacers and 4 insulators from the intake manifold.


15. REMOVE NO. 2 FUEL DELIVERY PIPE SUB-ASSEMBLY

  1. A218696
    Disconnect the No. 7 wire harness connector.

  1. Remove the 2 bolts and No. 2 fuel delivery pipe.

    NOTICE:
    When removing the delivery pipe, hold the pipe by both ends and pull it straight upward.

  1. Remove the 2 delivery pipe spacers and 4 insulators from the intake manifold.


16. REMOVE NO. 4 ENGINE COVER

A214270

17. REMOVE NO. 3 ENGINE COVER

A214271

18. REMOVE NO. 2 WATER BY-PASS PIPE SUB-ASSEMBLY

  1. A210013
    Remove the 2 bolts.

  1. Disconnect the 4 hoses and remove the No. 2 water by-pass pipe.


19. REMOVE NO. 1 WATER BY-PASS HOSE

  1. A215865
    Remove the No. 1 water by-pass hose.


20. REMOVE WATER PUMP PULLEY

  1. A230493E01
    Using SST, hold the water pump pulley.
    SST
    09960-10010   (09962-01000, 09963-01000)

  1. Remove the 4 bolts and water pump pulley.


21. REMOVE NO. 1 IDLER PULLEY SUB-ASSEMBLY

  1. A210019
    Remove the bolt and No. 1 idler pulley.


22. REMOVE FAN BRACKET ASSEMBLY

  1. A210020
    Remove the 5 bolts and fan bracket.


23. REMOVE SEPARATOR CASE

  1. A215435
    Remove the 4 bolts and separator case.


24. REMOVE NO. 2 ENGINE COVER

A214852

25. REMOVE NO. 1 ENGINE COVER

A214853

26. REMOVE ENGINE WIRE

  1. A214595
    Disconnect the 4 knock sensor connectors.

  1. Detach the 3 wire harness clamps.

  1. Remove the bolt and engine wire.


27. REMOVE NO. 11 WATER BY-PASS HOSE

A214627

28. REMOVE IGNITION COIL ASSEMBLY
  1. Remove the 8 bolts and 8 ignition coils.


29. REMOVE NOISE FILTER

  1. A218875
    for Bank 1:
    Remove the bolt and noise filter from the cylinder head cover LH.

  1. A218876
    for Bank 2:
    Remove the bolt and noise filter from the cylinder head cover RH.

← COMPONENTS (from Jan 2012)DISASSEMBLY (from Jan 2012) →