Home › Engine / Hybrid System › 1GR-FE (ENGINE CONTROL) › SFI SYSTEM
RM38G0E _51 Engine / Hybrid System _100527 1GR-FE ENGINE CONTROL _0469186 SFI SYSTEM J

1GR-FE ENGINE CONTROL  SFI SYSTEM  Fuel Pump Control Circuit  


DESCRIPTION

The fuel pump circuit consists of the ECM, fuel pump and fuel pump control ECU (which operates the fuel pump). Based on the engine output, the ECM determines the fuel pump speed. The speed is then converted to a duty signal and sent to the fuel pump control ECU. Based on the signal sent from the ECM, the fuel pump control ECU adjusts the fuel pump operation speed.

WIRING DIAGRAM

A488794E01
0.385,6.281 2.073,6.479 1.688,0.198 10 false *: Shielded 0.594,5.344 1.208,5.604 0.615,0.26 10 false Battery 3.094,1.74 4.042,2 0.948,0.26 10 false EFI-B NO.1 3.625,6.052 5.313,6.25 1.688,0.198 10 false Fuel Pump Control ECU 6.083,4.552 6.49,4.771 0.406,0.219 10 false FPC 6.323,6.021 6.729,6.24 0.406,0.219 10 false B2 2.156,3.917 3.844,4.115 1.688,0.198 10 false BLPU 2.156,4.448 3.844,4.646 1.688,0.198 10 false BLPV 2.135,4.979 3.823,5.177 1.688,0.198 10 false BLPW 2.156,5.531 3.844,5.729 1.688,0.198 10 false BLPE 1.813,6.198 2.615,6.479 0.802,0.281 10 false Fuel Pump 1.813,6.031 2.479,6.281 0.667,0.25 10 false V9 6.094,0.646 6.604,0.854 0.51,0.208 10 false MREL 5.833,0.5 6.01,0.688 0.177,0.188 10 false 6 5.781,4.552 6.01,4.771 0.229,0.219 10 false 50 2.625,3.792 3.031,4.01 0.406,0.219 10 false 3 2.625,4.854 3.031,5.073 0.406,0.219 10 false 2 2.625,4.323 3.031,4.542 0.406,0.219 10 false 4 2.625,5.385 3.031,5.604 0.406,0.219 10 false 1 3.677,3.917 4.083,4.135 0.406,0.219 10 false V7 3.729,4.26 4.135,4.479 0.406,0.219 10 false 3 3.719,4.781 4.125,5 0.406,0.219 10 false 4 3.719,5.323 4.125,5.542 0.406,0.219 10 false 1 4.896,3.938 5.302,4.156 0.406,0.219 10 false 1 4.896,4.49 5.302,4.708 0.406,0.219 10 false 2 4.896,5.063 5.302,5.281 0.406,0.219 10 false 3 3.74,3.698 4.146,3.917 0.406,0.219 10 false 2 3.99,3.917 5.677,4.115 1.688,0.198 10 false FPU 4.521,4.135 6.208,4.333 1.688,0.198 10 false +B 4,4.448 5.688,4.646 1.688,0.198 10 false FPV 4.01,4.979 5.698,5.177 1.688,0.198 10 false FPW 4,5.521 5.688,5.719 1.688,0.198 10 false FPG 4.427,4.688 4.833,4.906 0.406,0.219 10 false FPC 4.417,5.271 4.823,5.49 0.406,0.219 10 false GND 4.833,4.125 5.24,4.344 0.406,0.219 10 false V6 3.24,5.667 3.646,5.885 0.406,0.219 10 false * 2.146,0.51 2.302,0.708 0.156,0.198 10 false 2 1.313,1.156 1.469,1.354 0.156,0.198 10 false 5 0.417,4.5 1.427,4.719 1.01,0.219 10 false SUB R/B-NO.1 1.333,1.625 2.427,1.844 1.094,0.219 10 false EFI MAIN NO. 1 0.615,1.438 1.25,1.833 0.635,0.396 10 false EFI MAIN NO. 1 1.313,0.521 1.469,0.719 0.156,0.198 10 false 1 2.146,1.156 2.302,1.354 0.156,0.198 10 false 3 6.323,6.188 6.729,6.406 0.406,0.219 10 false ECM 3.698,4.438 4.104,4.656 0.406,0.219 10 false V7 3.667,4.99 4.073,5.208 0.406,0.219 10 false V7 3.677,5.521 4.083,5.74 0.406,0.219 10 false V7 4.844,4.688 5.25,4.906 0.406,0.219 10 false V6 4.844,5.271 5.25,5.49 0.406,0.219 10 false V6 4.01,2.948 4.802,3.167 0.792,0.219 10 false FUEL PMP 1.396,2.781 2.188,3 0.792,0.219 10 false FUEL PMP 3.885,1.99 4.042,2.188 0.156,0.198 10 false 2 4.729,1.99 4.885,2.188 0.156,0.198 10 false 1 3.875,2.469 4.031,2.667 0.156,0.198 10 false 5 4.76,2.458 4.917,2.656 0.156,0.198 10 false 3 2.833,1.844 2.99,2.042 0.156,0.198 10 false 2 2.823,1.583 2.979,1.781 0.156,0.198 10 false 1

CAUTION / NOTICE / HINT

NOTICE:

Inspect the fuses for circuits related to this system before performing the following procedure.


PROCEDURE

1.INSPECT FUEL PUMP CONTROL ECU
A337223C60
4.292,0.208 4.656,0.49 0.365,0.281 2.667,0.219 3.042,0.479 0.375,0.26 5,2.365 4.719,1.323 false 4.458,2.375 4.458,1.333 false 3.917,2.375 4.177,1.333 false 3.438,2.375 3.24,1.458 false 3.083,2.375 3.01,1.448 false 2.615,2.375 2.719,1.448 false 2.146,2.375 2.469,1.438 false 0.281,0.188 0.594,0.385 0.313,0.198 10 false *1 4.385,0.271 4.698,0.469 0.313,0.198 10 false V6 2.76,0.271 3.073,0.469 0.313,0.198 10 false V7 4.958,2.417 5.271,2.615 0.313,0.198 10 false +B 3.792,2.417 4.167,2.646 0.375,0.229 10 false GND 4.365,2.417 4.74,2.646 0.375,0.229 10 false FPC 3.354,2.417 3.729,2.646 0.375,0.229 10 false FPG 2.969,2.417 3.344,2.646 0.375,0.229 10 false FPU 2.5,2.417 2.875,2.646 0.375,0.229 10 false FPV 2.042,2.417 2.417,2.646 0.375,0.229 10 false FPW
*1 Fuel Pump Control ECU - -


a.

Remove the fuel pump control ECU.

Click hereEngine / Hybrid System>1GR-FE (FUEL)>FUEL PUMP ECU>REMOVAL


b.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition

Click Location & Routing(V6,V7)Location & Routing

Click Connector(V6)Body>Differential Wire / Frame Wire>Fuel Pump Control ECU

Click Connector(V7)Body>Differential Wire / Frame Wire>Fuel Pump Control ECU

V6-1 (+B) - V6-3 (GND) Always 200 Ω or higher
V6-1 (+B) - V6-2 (FPC) Always 2 kΩ or higher
V6-2 (FPC) - V6-3 (GND) Always 10 kΩ or higher
V7-1 (FPG) - V6-3 (GND) Always 1 kΩ or higher
V7-2 (FPU) - V6-3 (GND) Always 2 kΩ or higher
V7-3 (FPV) - V6-3 (GND) Always 2 kΩ or higher
V7-4 (FPW) - V6-3 (GND) Always 2 kΩ or higher


HINT:

This procedure checks for an internal short of the fuel pump control ECU when its transistor is stuck on.



Result:
Proceed to
OK
NG



OK

2.CHECK HARNESS AND CONNECTOR (POWER SOURCE OF FUEL PUMP CONTROL ECU)

NG

REPLACE FUEL PUMP CONTROL ECU

2.CHECK HARNESS AND CONNECTOR (POWER SOURCE OF FUEL PUMP CONTROL ECU)
a.

Disconnect the fuel pump control ECU connector.


b.

Turn the ignition switch to ON.


c.

Measure the voltage according to the value(s) in the table below.

Standard Voltage:
Tester Connection Condition Specified Condition

Click Location & Routing(V6)Location & Routing

Click Connector(V6)Body>Differential Wire / Frame Wire>Fuel Pump Control ECU

V6-1 (+B) - V6-3 (GND) Ignition switch ON 11 to 14 V


HINT:

Make a note of the measured voltage as it may be used in a following Active Test.



Result:
Proceed to
OK
NG



OK

3.CHECK HARNESS AND CONNECTOR (FUEL PUMP CONTROL ECU - ECM)

NG

7.CHECK HARNESS AND CONNECTOR (FUEL PUMP CONTROL ECU - BODY GROUND)
3.CHECK HARNESS AND CONNECTOR (FUEL PUMP CONTROL ECU - ECM)
a.

Disconnect the fuel pump control ECU connector.


b.

Disconnect the ECM connector.


c.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition

Click Location & Routing(V6,B2)Location & Routing

Click Connector(V6)Body>Differential Wire / Frame Wire>Fuel Pump Control ECU

Click Connector(B2)Engine Compartment>Engine Room Main Wire / Lamp Wire / No. 2 Engine Room Wire / No. 2 Lamp Wire / No. 3 Engine Room Wire / No. 6 Engine Room Wire / Washer Wiring Assembly>ECM

V6-2 (FPC) - B2-50 (FPC) Always Below 1 Ω
V6-2 (FPC) or B2-50 (FPC) - Body ground and other terminals Always 10 kΩ or higher



Result:
Proceed to
OK
NG



OK

4.PERFORM ACTIVE TEST USING GTS (FUEL PUMP SINGLE PHASE ENERGIZATION)

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

4.PERFORM ACTIVE TEST USING GTS (FUEL PUMP SINGLE PHASE ENERGIZATION)
A337225C56
2.677,0.229 3.052,0.51 0.375,0.281 3.25,2.292 3,1.458 false 2.208,2.281 2.458,1.458 false 2.729,2.271 2.729,1.49 false 0.208,0.156 0.521,0.354 0.313,0.198 10 false *1 2.771,0.292 3.083,0.49 0.313,0.198 10 false V7 3.167,2.302 3.5,2.51 0.333,0.208 10 false FPU 2.615,2.302 2.927,2.5 0.313,0.198 10 false FPV 2.031,2.302 2.417,2.51 0.385,0.208 10 false FPW
*1 Fuel Pump Control ECU - -


a.

Disconnect the V7 fuel pump control ECU connector.


b.

Turn the ignition switch to ON.


c.

Operate the fuel pump control ECU using the Active Test function and measure the voltage according to the value(s) in the table below.

Powertrain > Engine > Active Test
Tester Display
Fuel Pump Single Phase Energization
50004 372 49
Standard Voltage:
Tester Connection GTS Operation Specified Condition

Click Location & Routing(V7)Location & Routing

Click Connector(V7)Body>Differential Wire / Frame Wire>Fuel Pump Control ECU

V7-2 (FPU) - Body ground U Phase 4.4 to 8.4 V*
V7-3 (FPV) - Body ground V Phase 4.4 to 8.4 V*
V7-4 (FPW) - Body ground W Phase 4.4 to 8.4 V*


HINT:
·

*: This Active Test restricts the fuel pump control ECU assembly output duty cycle to 50%. Therefore, the output voltage of the fuel pump control ECU assembly will be approximately 50% of the power source voltage measured in a previous step.

·

Before performing this inspection, check that the battery voltage is between 11 and 14 V (not depleted).




Result:
Result Proceed to
The U phase, V phase and W phase are all normal A
The U phase, V phase or W phase is abnormal B
The U phase, V phase and W phase are all abnormal C



A

5.CHECK HARNESS AND CONNECTOR (FUEL PUMP CONTROL ECU - FUEL PUMP)

B

REPLACE FUEL PUMP CONTROL ECU

C

6.INSPECT ECM (FPC TERMINAL)
5.CHECK HARNESS AND CONNECTOR (FUEL PUMP CONTROL ECU - FUEL PUMP)
a.

Disconnect the fuel pump control ECU connector.


b.

Disconnect the fuel pump connector.


c.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition

Click Location & Routing(V7,V9)Location & Routing

Click Connector(V7)Body>Differential Wire / Frame Wire>Fuel Pump Control ECU

Click Connector(V9)Body>Differential Wire / Frame Wire>Fuel with Filter Pump Assembly

V7-2 (FPU) - V9-3 (BLPU) Always Below 1 Ω
V7-3 (FPV) - V9-4 (BLPV) Always Below 1 Ω
V7-4 (FPW) - V9-2 (BLPW) Always Below 1 Ω
V7-2 (FPU) or V9-3 (BLPU) - Body ground and other terminals Always 10 kΩ or higher
V7-3 (FPV) or V9-4 (BLPV) - Body ground and other terminals Always 10 kΩ or higher
V7-4 (FPW) or V9-2 (BLPW) - Body ground and other terminals Always 10 kΩ or higher



Result:
Proceed to
OK
NG


HINT:

Perform "Inspection After Repair" after replacing the fuel pump (for low pressure side).

Click hereEngine / Hybrid System>1GR-FE (ENGINE CONTROL)>SFI SYSTEM>INITIALIZATION



OK

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

6.INSPECT ECM (FPC TERMINAL)
a.

Disconnect the fuel pump control ECU connector.


b.

Turn the ignition switch to ON.


c.

Operate the fuel pump control ECU using the Active Test function and measure the resistance according to the value(s) in the table below.

Powertrain > Engine > Active Test
Tester Display
Fuel Pump Single Phase Energization
50004 372 49
Standard Resistance:
Tester Connection GTS Operation Specified Condition

Click Location & Routing(V6)Location & Routing

Click Connector(V6)Body>Differential Wire / Frame Wire>Fuel Pump Control ECU

V6-2 (FPC) - Body ground Before Active Test → During Active Test Before Active Test: Resistance is stable → During Active Test: Resistance fluctuates*


HINT:

*: Using the Active Test, duty control of the transistors in the ECM will be performed. Due to the duty control, resistance of the FPC terminal will be unstable during the Active Test. If the resistance is stable before the Active Test and fluctuates while performing the Active Test, it can be determined that the transistor is operating. If the transistor does not operate during the Active Test, the ECM may be malfunctioning.



Result:
Proceed to
OK
NG



OK

REPLACE FUEL PUMP CONTROL ECU

NG

7.CHECK HARNESS AND CONNECTOR (FUEL PUMP CONTROL ECU - BODY GROUND)
a.

Disconnect the fuel pump control ECU connector.


b.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition

Click Location & Routing(V6)Location & Routing

Click Connector(V6)Body>Differential Wire / Frame Wire>Fuel Pump Control ECU

V6-3 (GND) - Body ground Always Below 1 Ω



Result:
Proceed to
OK
NG



OK

8.INSPECT RELAY (FUEL PMP)

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

8.INSPECT RELAY (FUEL PMP)

Result:
Proceed to
OK
NG



OK

9.CHECK HARNESS AND CONNECTOR (RELAY (FUEL PMP) - BODY GROUND)

NG

REPLACE RELAY (FUEL PMP)

9.CHECK HARNESS AND CONNECTOR (RELAY (FUEL PMP) - BODY GROUND)
a.

Remove the relay (FUEL PMP).


b.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
1 (FUEL PMP relay) - Body ground Always Below 1 Ω



Result:
Proceed to
OK
NG



OK

10.INSPECT TERMINAL VOLTAGE (POWER SOURCE OF FUEL PMP RELAY)

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

10.INSPECT TERMINAL VOLTAGE (POWER SOURCE OF FUEL PMP RELAY)
A488869C01
0.177,0.188 0.49,0.385 0.313,0.198 10 false *1 2.167,2.135 2.479,2.333 0.313,0.198 10 false *a
*1 Engine Room Relay Block No. 2
*a FUEL PMP Relay terminal


a.

Remove the relay (FUEL PMP).


b.

Measure the voltage according to the value(s) in the table below.

Standard Voltage:
Tester Connection Condition Specified Condition
2 (FUEL PMP relay) - Body ground Ignition switch ON 11 to 14 V



Result:
Proceed to
OK
NG



OK

11.CHECK HARNESS AND CONNECTOR (RELAY (FUEL PMP) - FUEL PUMP CONTROL ECU)

NG

12.CHECK HARNESS AND CONNECTOR (RELAY (FUEL PMP) - FUSE (EFI-B NO.1))
11.CHECK HARNESS AND CONNECTOR (RELAY (FUEL PMP) - FUEL PUMP CONTROL ECU)
a.

Remove the relay (FUEL PMP).


b.

Disconnect the fuel pump control ECU connector.


c.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition

Click Location & Routing(V6)Location & Routing

Click Connector(V6)Body>Differential Wire / Frame Wire>Fuel Pump Control ECU

3 (FUEL PMP relay) - V6-1 (+B) Always Below 1 Ω
3 (FUEL PMP relay) or V6-1 (+B) - Body ground and other terminals Always 10 kΩ or higher



Result:
Proceed to
OK
NG



OK

REPAIR OR REPLACE HARNESS OR CONNECTOR (RELAY (EFI MAIN NO.1) - BATTERY)

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

12.CHECK HARNESS AND CONNECTOR (RELAY (FUEL PMP) - FUSE (EFI-B NO.1))
a.

Remove the relay (FUEL PMP).


b.

Remove the fuse (EFI-B NO.1).


c.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
2 (FUEL PMP relay) - 2 (EFI-B NO.1 fuse) Always Below 1 Ω
2 (FUEL PMP relay) or 2 (EFI-B NO.1 fuse) - Body ground and other terminals Always 10 kΩ or higher



Result:
Proceed to
OK
NG



OK

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR