The shift control ECU detects that the IG2 signal is stuck ON by comparing it with the IG control status signal sent from the certification ECU (smart key ECU assembly).
| DTC No. | Detection Item | DTC Detection Condition | Trouble Area | Warning Indicate | DTC Output from | Priority |
|---|---|---|---|---|---|---|
| P176D12 | IG2 Signal (Gear Shift Control Module "A") Circuit Short to Auxiliary Battery | 8 seconds elapse after turning ignition switch to ON (READY) and then turn ignition switch off. Even when IG control status signal from certification ECU (smart key ECU assembly) is OFF, IG2 signal is ON continuously for 10 seconds or more
(1 trip detection logic) |
·
Certification ECU (smart key ECU assembly) ·
Shift Control ECU ·
Wire harness or connector |
·
Master Warning -
Comes on ·
Multi-information Display Error Message -
Displayed |
EV | A |
After repair has been completed, clear the DTC and then check that the vehicle has returned to normal by performing the All Readiness check procedure.
Click hereDrivetrain>Q710 (HYBRID TRANSMISSION / TRANSAXLE)>ELECTRONIC SHIFT LEVER SYSTEM>UTILITY
Turn the ignition switch to ON and wait for 15 seconds or more.
Turn the ignition switch off and wait for 2 minutes or more.
The vehicle is equipped with a shift control supply. Therefore, ensure there is no power being supplied to the vehicle when disconnecting or reconnecting the connector of the shift control ECU and when removing or installing the shift control ECU.
Click hereDrivetrain>Q710 (HYBRID TRANSMISSION / TRANSAXLE)>ELECTRONIC SHIFT LEVER SYSTEM>PRECAUTION
Check the connector connections and contact pressure of the relevant terminals for the shift control ECU connectors.
The connectors are connected securely and there are no contact pressure problems.
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Pre-procedure1
Disconnect the D92 shift control ECU connector.
Procedure1
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Switch Condition | Specified Condition |
|---|---|---|
|
Click Location & Routing(D92)Location & Routingewd_type=routing;type=c;code=D92 Click Connector(D92)Instrument Panel>Instrument Panel Wire>Shift Control ECUewd_type=component;type=c;code=D92;pinno=27 |
||
| D92-27 (IG2) - Body ground | Ignition switch off → Ignition switch ON | 1 V or less → 8 V or higher |
Turning the ignition switch to ON with the connector disconnected causes other DTCs to be stored. Clear the DTCs after performing this inspection.
| Proceed to |
|---|
| OK |
| NG |
Post-procedure1
Turn the ignition switch off.
Reconnect the D92 shift control ECU connector.
OK
NG
Pre-procedure1
Turn the ignition switch to ON.
Procedure1
Check for DTCs and freeze frame data and then write them down.
| Proceed to |
|---|
| NEXT |
Post-procedure1
Turn the ignition switch off.
NEXT
Pre-procedure1
Turn the ignition switch to ON.
Procedure1
Clear the DTCs.
| Proceed to |
|---|
| NEXT |
Post-procedure1
Turn the ignition switch off.
Leave the vehicle as is for 60 seconds or more.
Do not connect the GTS.
Do not depress the brake pedal.
Do not open/close any of the doors.
NEXT
Pre-procedure1
Turn the ignition switch to ON and wait for 15 seconds or more.
Turn the ignition switch off and wait for 2 minutes or more.
Turn the ignition switch to ON.
Procedure1
Check if DTCs are output.
| Result | Proceed to |
|---|---|
| P176D12 is not output | A |
| P176D12 is output | B |
Post-procedure1
Turn the ignition switch off.
A
B
Inspect the IG2 P relay.
Click hereDrivetrain>Q710 (HYBRID TRANSMISSION / TRANSAXLE)>RELAY>INSPECTION
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Pre-procedure1
Disconnect the D92 shift control ECU connector.
Remove the IG2 P relay from the luggage room relay block.
Procedure1
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
|
Click Location & Routing(D92)Location & Routingewd_type=routing;type=c;code=D92 Click Connector(D92)Instrument Panel>Instrument Panel Wire>Shift Control ECUewd_type=component;type=c;code=D92;pinno=27 |
||
| D92-27 (IG2) or luggage room relay block IG2 P relay terminal 5 - Body ground and other terminals | Always | 10 kΩ or higher |
| Proceed to |
|---|
| OK |
| NG |
Post-procedure1
Install the IG2 P relay.
Reconnect the D92 shift control ECU connector.
OK
NG
Inspect the LUG-IG1-NO.1 relay.
Click hereDrivetrain>Q710 (HYBRID TRANSMISSION / TRANSAXLE)>RELAY>INSPECTION
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Pre-procedure1
Remove the IG2 P relay from the luggage room relay block.
Remove the LUG-IG1 NO.1 relay from the luggage room relay block.
Procedure1
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| Luggage room relay block LUG-IG1 NO.1 relay terminal 3 or luggage room relay block IG2 P relay terminal 2 - Body ground and other terminals | Always | Below 1 V |
| Proceed to |
|---|
| OK |
| NG |
Post-procedure1
Install the LUG-IG1 NO.1 relay.
Install the IG2 P relay.
OK
NG
Pre-procedure1
Remove the LUG-IG1 NO.1 relay from the luggage room relay block.
Disconnect the D86 certification ECU (smart key ECU assembly) connector.
Procedure1
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
|
Click Location & Routing(D86)Location & Routingewd_type=routing;type=c;code=D86 Click Connector(D86)Instrument Panel>Instrument Panel Wire>Certification ECUewd_type=component;type=c;code=D86;pinno=17 |
||
| Luggage room relay block LUG-IG1 NO.1 relay terminal 2 or D86-17 (IG1D) - Body ground and other terminals | Ignition switch off | Below 1 V |
| Proceed to |
|---|
| OK |
| NG |
Post-procedure1
Reconnect the D86 certification ECU (smart key ECU assembly) connector.
Install the LUG-IG1 NO.1 relay.
OK
NG