Refer to DTC C050612.
Click hereBrake>BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS>ELECTRONICALLY CONTROLLED BRAKE SYSTEM>C050612
| DTC No. | Detection Item | DTC Detection Condition | Trouble Area | DTC Output from | Priority | Note |
|---|---|---|---|---|---|---|
| C050614 | Right Front Wheel Speed Sensor Circuit Short to Ground or Open | An open in the speed sensor signal circuit continues for 0.5 seconds or more. | ·
Front speed sensor RH (front axle hub sub-assembly RH) ·
Front skid control sensor wire RH ·
Wire harness and connector ·
No. 2 skid control ECU (brake actuator assembly) |
Brake/EPB | A | Output ECU: No. 2 skid control ECU (brake actuator assembly) |
Refer to DTC C050612.
Click hereBrake>BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS>ELECTRONICALLY CONTROLLED BRAKE SYSTEM>C050612
After replacing the No. 2 skid control ECU (brake actuator assembly), perform "Calibration".
Click hereBrake>BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS>ELECTRONICALLY CONTROLLED BRAKE SYSTEM>UTILITY
After replacing or removing and installing a speed sensor, perform Dealer Mode (Signal Check) inspection to confirm that the speed sensors are operating correctly.
Pre-procedure1
Select the line graph display on the GTS.
Procedure1
Check for any momentary interruption in the wire harness and connector.
| Tester Display | Measurement Item | Range | Normal Condition | Diagnostic Note |
|---|---|---|---|---|
| FR Speed Open | Momentary interruption of front speed sensor RH pulse input to ECU | Normal / Under intermittent | Normal: Normal
Under intermittent: Momentary interruption |
- |
| FR Speed Sensor Voltage Open | Front speed sensor RH voltage open detection | Normal / Under intermittent | Normal: Normal
Under intermittent: Momentary interruption |
- |
| Tester Display |
|---|
| FR Speed Open |
| FR Speed Sensor Voltage Open |
Perform the above inspection before removing the sensor and connector.
Normal (There are no momentary interruptions.)
| Proceed to |
|---|
| OK |
| NG |
Post-procedure1
None
OK
Click hereGeneral>INTRODUCTION>HOW TO TROUBLESHOOT ECU CONTROLLED SYSTEMS>HOW TO PROCEED WITH TROUBLESHOOTING
NG
Pre-procedure1
Turn the ignition switch off.
Procedure1
Make sure that there is no looseness at the locking part and the connecting part of the connectors.
The connector is securely connected.
Pre-procedure2
Disconnect the AW2 front skid control sensor wire RH connector.
Disconnect the W2 front skid control sensor wire RH connector.
Procedure2
Check both the connector case and the terminals for deformation and corrosion.
No deformation or corrosion.
Procedure3
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
|
Click Location & Routing(W2,AW2)Location & Routingewd_type=routing;type=c,w;code=W2,AW2 |
||
| W2-2 (FR+) - AW2-5 | Always | Below 1 Ω |
| W2-2 (FR+) or AW2-5 - Body ground and other terminals | Always | 10 kΩ or higher |
| W2-1 (FR-) - AW2-1 | Always | Below 1 Ω |
| W2-1 (FR-) or AW2-1 - Body ground and other terminals | Always | 10 kΩ or higher |
| Proceed to |
|---|
| OK |
| NG |
Post-procedure1
None
OK
NG
Procedure1
Make sure that there is no looseness at the locking part and the connecting part of the connectors.
The connector is securely connected.
Pre-procedure1
Disconnect the A6 No. 2 skid control ECU(brake actuator assembly) connector.
Procedure2
Check both the connector case and the terminals for deformation and corrosion.
No deformation or corrosion.
Procedure3
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
|
Click Location & Routing(AW2,A6)Location & Routingewd_type=routing;type=w,c;code=AW2,A6 |
||
| AW2-5 - A6-7 (FR+) | Always | Below 1 Ω |
| AW2-5 or A6-7 (FR+) - Body ground | Always | 10 kΩ or higher |
| AW2-1 - A6-6 (FR-) | Always | Below 1 Ω |
| AW2-1 or A6-6 (FR-) - Body ground | Always | 10 kΩ or higher |
| Proceed to |
|---|
| OK |
| NG |
Post-procedure1
None
OK
NG
Pre-procedure1
Reconnect the A6 No. 2 skid control ECU (brake actuator assembly) connector.
Turn the ignition switch to ON.
Procedure1
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
|
Click Location & Routing(AW2)Location & Routingewd_type=routing;type=w;code=AW2 |
||
| AW2-5 - Body ground | Ignition switch ON | 11 to 14 V |
The front speed sensor rotor RH and front speed sensor RH are incorporated into the front axle hub sub-assembly RH.
If the front speed sensor RH and front speed sensor rotor RH needs to be replaced, replace the front axle hub sub-assembly RH.
| Proceed to |
|---|
| OK |
| NG |
Post-procedure1
None
OK
NG
for LHD: Click hereBrake>BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS>BRAKE ACTUATOR (for LHD)>REMOVAL
for RHD: Click hereBrake>BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS>BRAKE ACTUATOR (for RHD)>REMOVAL