The No. 1 integration relay (P-CON relay) is activated by voltage output from the hybrid vehicle control ECU and supplies power to the shift control actuator assembly (parking lock motor).
If the hybrid vehicle control ECU detects a malfunction of the No. 1 integration relay (P-CON relay), it stores this DTC.
| DTC No. | Detection Item | DTC Detection Condition | Trouble Area | Warning Indicate | Memory |
|---|---|---|---|---|---|
| P272C73 | Park Pawl Motor Actuator Stuck Closed | When the P-CON relay is off, voltage at terminals MUA, MVA or MWA of the hybrid vehicle control ECU is 6 V or more for 0.064 seconds or more. | ·
Hybrid vehicle control ECU ·
No. 1 integration relay (P-CON relay) ·
Wire harness or connector |
·
Master Warning Light ·
Comes on ·
Multi-information Display Error Message ·
Displayed |
DTC stored |
After repairs have been completed, clear the DTCs and then check that the vehicle has returned to normal by performing the following All Readiness check procedure.
Click hereDrivetrain>P610 HYBRID TRANSMISSION / TRANSAXLE>ELECTRONIC SHIFT LEVER SYSTEM>UTILITY
Turn the power switch on (IG).
With the brake pedal depressed, select neutral (N).
Push the P position switch (transmission shift main switch).
Refer to the wiring diagram for DTC P1C8F14.
Click hereDrivetrain>P610 HYBRID TRANSMISSION / TRANSAXLE>ELECTRONIC SHIFT LEVER SYSTEM>P1C8F14
Disconnect the C2 shift control actuator assembly connector.
| *a | Front view of wire harness connector
(to Shift Control Actuator Assembly) |
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| C2-2 (BMA) - Body ground | Power switch off | Below 1 V |
Reconnect the C2 shift control actuator assembly connector.
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Disconnect the A50 hybrid vehicle control ECU connector.
Disconnect the C2 shift control actuator assembly connector.
| *a | Front view of wire harness connector
(to Hybrid Vehicle Control ECU) |
| *b | Front view of wire harness connector
(to Shift Control Actuator Assembly) |
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| A50-1 (MUA) or C2-1 (MUA) - Body ground and other terminals | Power switch off | 10 kΩ or higher |
| A50-2 (MVA) or C2-6 (MVA) - Body ground and other terminals | Power switch off | 10 kΩ or higher |
| A50-3 (MWA) or C2-7 (MWA) - Body ground and other terminals | Power switch off | 10 kΩ or higher |
Reconnect the C2 shift control actuator assembly connector.
Reconnect the A50 hybrid vehicle control ECU connector.
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Click herePower Source / Network>POWER DISTRIBUTION>INTEGRATION RELAY>INSPECTION
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Disconnect the A50 hybrid vehicle control ECU connector.
Disconnect the 1B No. 1 integration relay connector.
| *a | Front view of wire harness connector
(to Hybrid Vehicle Control ECU) |
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| A50-15 (BMA) - Body ground and other terminals | Power switch off | 10 kΩ or higher |
Reconnect the 1B No. 1 integration relay connector.
Reconnect the A50 hybrid vehicle control ECU connector.
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Disconnect the C2 shift control actuator assembly connector.
Disconnect the 1B No. 1 integration relay connector.
| *a | Front view of wire harness connector
(to Shift Control Actuator Assembly) |
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| C2-2 (BMA) - Body ground and other terminals | Power switch off | 10 kΩ or higher |
Reconnect the 1B No. 1 integration relay connector.
Reconnect the C2 shift control actuator assembly connector.
| Proceed to |
|---|
| OK |
| NG |
OK
Click hereGeneral>INTRODUCTION>HOW TO TROUBLESHOOT ECU CONTROLLED SYSTEMS>HOW TO PROCEED WITH TROUBLESHOOTING
NG