Home › Engine / Hybrid System › 1UR-FE ENGINE CONTROL › ECM
RM27M0U _51 Engine / Hybrid System _049093 1UR-FE ENGINE CONTROL _0233892 ECM A

1UR-FE ENGINE CONTROL  ECM  INSTALLATION  


PROCEDURE

Hide 1.INSTALL GASKET

a.

Clean the ECM seal's surface with non-residue solvent.


b.

Attach a new gasket to the ECM.


Hide 89661 2.INSTALL ECM

a.
A155993

Install the ECM with the 4 bolts.

Torque:
8.0 N*m (82 kgf*cm, 71 in.*lbf)

NOTICE:
·

Make sure the gasket is not folded or caught on any area on the surrounding part.

·

Make sure there is no foreign matter caught between the gasket and surrounding part.

·

Do not damage the gasket.




b.
A218998

Connect the 2 ECM connectors and push each lock lever down to lock the ECM connectors.

NOTICE:
·

Make sure that the lock lever is raised 90° before connecting the ECM connectors. Failure to do this may cause the lock lever and terminals to break.

·

Do not twist the wire harness when connecting the ECM connectors.




c.
A215595

Connect the wire harness clamp.


Hide 82664 3.CONNECT CONNECTOR HOLDER BLOCK

a.
A215430

Connect the connector holder block with the 3 bolts.

Torque:
7.3 N*m (74 kgf*cm, 65 in.*lbf)


b.

Install the connector holder block cover.