Home › Vehicle Exterior › LIGHTING (EXT) › LIGHTING SYSTEM (w/ Adaptive High Beam System) › from 2021.07
RM3700E _59 Vehicle Exterior _093283 LIGHTING (EXT) _0486937 LIGHTING SYSTEM(w/ Adaptive High Beam System) C

LIGHTING (EXT)  LIGHTING SYSTEM(w/ Adaptive High Beam System)  B242F14  ECUB Circuit Short to Ground or Open  


DESCRIPTION

The headlight ECU sub-assembly operates using the power source voltage input from the IGR terminal and ECUB terminal.

The power source voltage of the ECUB terminal is supplied when the main body ECU (multiplex network body ECU) turns the ECUB power supply relay (H-LP LH relay and H-LP RH relay) to ON.

The headlight ECU sub-assembly compares the power source voltage supply condition of the IGR terminal and ECUB terminal and monitors the result.

Headlight Control
DTC No. Detection Item DTC Detection Condition Trouble Area DTC Output from Priority
B242F14 ECUB Circuit Short to Ground or Open
Detection condition:

The ignition switch is ON.


Malfunction status:

No power source voltage supplied to ECUB terminal while power source voltage being supplied to IGR terminal


Malfunction duration:

10 seconds or more


·

Headlight ECU sub-assembly LH

·

Harness or connector

·

H-LP LH relay

·

Power distribution box assembly

·

Main body ECU (multiplex network body ECU)


Headlight Control A

Headlight Control (Sub)
DTC No. Detection Item DTC Detection Condition Trouble Area DTC Output from Priority
B242F14 ECUB Circuit Short to Ground or Open
Detection condition:

The ignition switch is ON.


Malfunction status:

No power source voltage supplied to ECUB terminal while power source voltage being supplied to IGR terminal


Malfunction duration:

10 seconds or more


·

Headlight ECU sub-assembly RH

·

Harness or connector

·

H-LP RH relay

·

Power distribution box assembly

·

Main body ECU (multiplex network body ECU)


Headlight Control (Sub) A

WIRING DIAGRAM

E455949E07
0.667,0.604 4.031,0.802 3.365,0.198 10 false from Auxiliary Battery 0.51,1.448 1.375,1.635 0.865,0.188 10 false STD P/I NO.1 1.354,1.208 1.51,1.406 0.156,0.198 10 false 1 1.542,1.302 1.854,1.5 0.313,0.198 10 false +B 2.635,1.313 2.792,1.51 0.156,0.198 10 false L 2.594,1.594 2.906,1.792 0.313,0.198 10 false -S 2.823,2.583 2.979,2.781 0.156,0.198 10 false 2 2.813,2.823 3.125,3.021 0.313,0.198 10 false 5 2.625,2.677 2.781,2.875 0.156,0.198 10 false L 2.583,2.917 2.896,3.115 0.313,0.198 10 false -S 2.813,1.188 2.969,1.385 0.156,0.198 10 false 1 1.448,3.302 2.792,3.677 1.344,0.375 10 false Semiconductor Power Integration ECU 1.448,4.292 1.76,4.49 0.313,0.198 10 false 12 2.75,4.271 3.063,4.469 0.313,0.198 10 false 13 1.688,4.396 2.031,4.583 0.344,0.188 10 false GND 2.281,4.385 2.74,4.583 0.458,0.198 10 false ECUB 1.458,5.104 2.719,5.615 1.26,0.51 10 false Headlight ECU Sub-assembly LH 1.479,4.948 1.938,5.146 0.458,0.198 10 false A110 1.49,6.927 2.104,7.125 0.615,0.198 10 false A111 1.479,7.104 4.167,7.385 2.688,0.281 10 false Headlight ECU Sub-assembly RH 1.438,6.25 1.75,6.448 0.313,0.198 10 false 12 2.74,6.229 3.052,6.427 0.313,0.198 10 false 13 1.688,6.333 2.031,6.521 0.344,0.188 10 false GND 2.271,6.333 2.729,6.531 0.458,0.198 10 false ECUB 4.344,1.333 4.5,1.531 0.156,0.198 10 false 6 4.208,1.542 4.521,1.74 0.313,0.198 10 false 4D 4.313,2.708 4.469,2.906 0.156,0.198 10 false 10 4.219,2.927 4.417,3.115 0.198,0.188 10 false 4D 5.99,1.333 6.146,1.531 0.156,0.198 10 false 8 5.99,2.719 6.146,2.917 0.156,0.198 10 false 9 5.833,1.552 6.146,1.75 0.313,0.198 10 false MB 5.813,2.938 6.125,3.135 0.313,0.198 10 false MB 6.188,1.479 6.802,1.677 0.615,0.198 10 false HRLY 6.156,2.844 6.771,3.042 0.615,0.198 10 false HRY2 4.625,3.521 6.063,3.927 1.438,0.406 10 false Power Distribution Box Assembly 5.521,4.188 7.156,4.563 1.635,0.375 10 false Main Body ECU (Multiplex Network Body ECU)

CAUTION / NOTICE / HINT

NOTICE:
·

Inspect the fuses for circuits related to this system before performing the following procedure.

·

Before replacing the main body ECU (multiplex network body ECU), refer to Service Bulletin.

·

If the headlight ECU sub-assembly LH has been replaced, it is necessary to synchronize the vehicle information and initialize the headlight ECU sub-assembly LH.

Click hereVehicle Exterior>LIGHTING (EXT)>LIGHTING SYSTEM (w/ Adaptive High Beam System)>INITIALIZATION

·

When replacing the headlight ECU sub-assembly LH, always replace it with a new one. If a headlight ECU sub-assembly LH which was installed to another vehicle is used, the information stored in it will not match the information from the vehicle and a DTC may be stored.



PROCEDURE

1.CLEAR DTC
a.

Clear the DTCs.

Body Electrical > Headlight Control > Clear DTCs
50002 462

Result:
Proceed to
NEXT



NEXT

2.CHECK FOR DTC
2.CHECK FOR DTC

Pre-procedure1

a.

Turn ignition switch to ON.


b.

Wait 10 seconds or more.


Procedure1

a.

Check for DTCs.

Body Electrical > Headlight Control > Trouble Codes
50001 462
Result:
Result Proceed to
B242F14 is not output A
B242F14 is output B



Post-procedure1

a.

None



A

3.CLEAR DTC

B

12.INSPECT HEADLIGHT ECU SUB-ASSEMBLY LH (ECUB TERMINAL VOLTAGE)
3.CLEAR DTC
a.

Clear the DTCs.

Body Electrical > Headlight Control (Sub) > Clear DTCs
50002 463

Result:
Proceed to
NEXT



NEXT

4.CHECK FOR DTC
4.CHECK FOR DTC

Pre-procedure1

a.

Turn ignition switch to ON.


b.

Wait 10 seconds or more.


Procedure1

a.

Check for DTCs.

Body Electrical > Headlight Control (Sub) > Trouble Codes
50001 463
Result:
Result Proceed to
B242F14 is not output A
B242F14 is output B



Post-procedure1

a.

None



A

B

5.INSPECT HEADLIGHT ECU SUB-ASSEMBLY RH (ECUB TERMINAL VOLTAGE)
5.INSPECT HEADLIGHT ECU SUB-ASSEMBLY RH (ECUB TERMINAL VOLTAGE)

Pre-procedure1

a.
E473676C02
1.5,0.531 1.896,0.833 0.396,0.302 1.385,2.5 1.208,1.938 false 0.24,0.24 0.552,0.438 0.313,0.198 10 false *a 1.531,0.594 1.917,0.781 0.385,0.188 10 false A111 1.281,2.531 1.823,2.813 0.542,0.281 10 false ECUB
*a Front view of wire harness connector
(to Headlight ECU Sub-assembly RH)


Disconnect the A111 headlight ECU sub-assembly RH connector.


Procedure1

a.

Measure the voltage according to the value(s) in the table below.

Standard Voltage:
Tester Connection Condition Specified Condition

Click Location & Routing(A111)Location & Routing

Click Connector(A111)Engine Compartment>Engine Room Main Wire>Headlight ECU Sub-Assembly RH

A111-13 (ECUB) - Body ground Ignition switch ON 9.5 to 14 V


Result:
Proceed to
OK
NG



Post-procedure1

a.

None



OK

6.CHECK HARNESS AND CONNECTOR (HEADLIGHT ECU SUB-ASSEMBLY RH - BODY GROUND)

NG

7.INSPECT SEMICONDUCTOR POWER INTEGRATION ECU
6.CHECK HARNESS AND CONNECTOR (HEADLIGHT ECU SUB-ASSEMBLY RH - BODY GROUND)
a.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition

Click Location & Routing(A111)Location & Routing

Click Connector(A111)Engine Compartment>Engine Room Main Wire>Headlight ECU Sub-Assembly RH

A111-12 (GND) - Body ground Always Below 1 Ω



Result:
Proceed to
OK
NG



OK

REPLACE HEADLIGHT ECU SUB-ASSEMBLY RH

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

7.INSPECT SEMICONDUCTOR POWER INTEGRATION ECU
a.

Measure the resistance according to the value(s) in the table below.

Standard Voltage:
Tester Connection Condition Specified Condition

Click Location & Routing(A86)Location & Routing

Click Connector(A86)Engine Compartment>Engine Room Main Wire>Semiconductor Power Integration ECU

A86-2 (L) - Body ground Light control switch not in head position Below 3 V
A86-2(L) - Body ground Light control switch in head position 8 V or higher



Result:
Proceed to
OK
NG



OK

8.CHECK HARNESS AND CONNECTOR (SEMICONDUCTOR POWER INTEGRATION ECU - HEADLIGHT ECU SUB-ASSEMBLY RH)

NG

REPLACE SEMICONDUCTOR POWER INTEGRATION ECU

8.CHECK HARNESS AND CONNECTOR (SEMICONDUCTOR POWER INTEGRATION ECU - HEADLIGHT ECU SUB-ASSEMBLY RH)
a.

Disconnect the cable from the negative (-) auxiliary battery terminal.


b.

Disconnect the A86 semiconductor power integration ECU connector.


c.

Connect the cable to the negative (-) auxiliary battery terminal.


d.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition

Click Location & Routing(A86,A111)Location & Routing

Click Connector(A86)Engine Compartment>Engine Room Main Wire>Semiconductor Power Integration ECU

Click Connector(A111)Engine Compartment>Engine Room Main Wire>Headlight ECU Sub-Assembly RH

A86-2(L) - A111-13 (ECUB) Always Below 1 Ω
A86-2(L) - Body ground Always 10 kΩ or higher
A111-13(ECUB) - Body ground Always 10 kΩ or higher



Result:
Proceed to
OK
NG



OK

9.CHECK HARNESS AND CONNECTOR (POWER SOURCE - SEMICONDUCTOR POWER INTEGRATION ECU)

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

9.CHECK HARNESS AND CONNECTOR (POWER SOURCE - SEMICONDUCTOR POWER INTEGRATION ECU)
a.

Measure the voltage according to the value(s) in the table below.

Standard Voltage:
Tester Connection Condition Specified Condition

Click Location & Routing(A85)Location & Routing

Click Connector(A85)Engine Compartment>Engine Room Main Wire>Semiconductor Power Integration ECU

A85-1 (+B) - Body ground Ignition switch off 11 to 14 V



Result:
Proceed to
OK
NG



OK

10.CHECK HARNESS AND CONNECTOR (SEMICONDUCTOR POWER INTEGRATION ECU - POWER DISTRIBUTION BOX ASSEMBLY)

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

10.CHECK HARNESS AND CONNECTOR (SEMICONDUCTOR POWER INTEGRATION ECU - POWER DISTRIBUTION BOX ASSEMBLY)

Pre-procedure1

a.

Disconnect the 4D power distribution box assembly connector.


Procedure1

a.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition

Click Location & Routing(A86)Location & Routing

Click Connector(A86)Engine Compartment>Engine Room Main Wire>Semiconductor Power Integration ECU

A86-5 (-S) - 4D-10 Always Below 1 Ω
A86-5 (-S) - Body ground Always 10 kΩ or higher
4D-10 - Body ground Always 10 kΩ or higher


Result:
Proceed to
OK
NG



Post-procedure1

a.

None



OK

11.INSPECT POWER DISTRIBUTION BOX ASSEMBLY

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

11.INSPECT POWER DISTRIBUTION BOX ASSEMBLY

Pre-procedure1

a.

Remove the main body ECU (multiplex network body ECU) from the power distribution box assembly.

HINT:

for LHD: Click herePower Source / Network>POWER DISTRIBUTION>MAIN BODY ECU (for LHD)>REMOVAL

for RHD: Click herePower Source / Network>POWER DISTRIBUTION>MAIN BODY ECU (for RHD)>REMOVAL



Procedure1

a.

Measure the resistance according to the value(s) in the table below.

E444782C11
1.625,0.177 2,0.427 0.375,0.25 4.656,0.427 5.031,0.677 0.375,0.25 4.25,1.24 4.438,0.948 false 0.229,0.198 0.542,0.396 0.313,0.198 10 false *a 1.729,0.219 2.042,0.417 0.313,0.198 10 false 4D 4.75,0.469 5.063,0.667 0.313,0.198 10 false MB 4.042,1.271 4.573,1.5 0.531,0.229 10 false HRY2
*a Component without harness connected
(Power Distribution Box Assembly)
- -


Standard Resistance:
Tester Connection Condition Specified Condition
4D-10 - MB-9 (HRY2) Always Below 1 Ω


Result:
Proceed to
OK
NG



Post-procedure1

a.

None



OK

NG

12.INSPECT HEADLIGHT ECU SUB-ASSEMBLY LH (ECUB TERMINAL VOLTAGE)

Pre-procedure1

a.
E473690C03
1.5,0.531 1.896,0.833 0.396,0.302 1.385,2.5 1.208,1.938 false 0.24,0.24 0.552,0.438 0.313,0.198 10 false *a 1.542,0.594 1.906,0.792 0.365,0.198 10 false A110 1.281,2.531 1.823,2.813 0.542,0.281 10 false ECUB
*a Front view of wire harness connector
(to Headlight ECU Sub-assembly LH)


Disconnect the A110 headlight ECU sub-assembly LH connector.


Procedure1

a.

Measure the voltage according to the value(s) in the table below.

Standard Voltage:
Tester Connection Condition Specified Condition

Click Location & Routing(A110)Location & Routing

Click Connector(A110)Engine Compartment>Engine Room Main Wire>Headlight ECU Sub-Assembly LH

A110-13 (ECUB) - Body ground Ignition switch ON 9.5 to 14 V


Result:
Proceed to
OK
NG



Post-procedure1

a.

None



OK

13.CHECK HARNESS AND CONNECTOR (HEADLIGHT ECU SUB-ASSEMBLY LH - BODY GROUND)

NG

14.INSPECT SEMICONDUCTOR POWER INTEGRATION ECU
13.CHECK HARNESS AND CONNECTOR (HEADLIGHT ECU SUB-ASSEMBLY LH - BODY GROUND)
a.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition

Click Location & Routing(A110)Location & Routing

Click Connector(A110)Engine Compartment>Engine Room Main Wire>Headlight ECU Sub-Assembly LH

A110-12 (GND) - Body ground Always Below 1 Ω



Result:
Proceed to
OK
NG



OK

REPLACE HEADLIGHT ECU SUB-ASSEMBLY LH

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

14.INSPECT SEMICONDUCTOR POWER INTEGRATION ECU
a.

Measure the resistance according to the value(s) in the table below.

Standard Voltage:
Tester Connection Condition Specified Condition

Click Location & Routing(A86)Location & Routing

Click Connector(A86)Engine Compartment>Engine Room Main Wire>Semiconductor Power Integration ECU

A86-1 (L) - Body ground Light control switch not in head position Below 3 V
A86-1(L) - Body ground Light control switch in head position 8 V or higher



Result:
Proceed to
OK
NG



OK

15.CHECK HARNESS AND CONNECTOR (SEMICONDUCTOR POWER INTEGRATION ECU - HEADLIGHT ECU SUB-ASSEMBLY LH)

NG

REPLACE SEMICONDUCTOR POWER INTEGRATION ECU

15.CHECK HARNESS AND CONNECTOR (SEMICONDUCTOR POWER INTEGRATION ECU - HEADLIGHT ECU SUB-ASSEMBLY LH)
a.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition

Click Location & Routing(A86,A110)Location & Routing

Click Connector(A86)Engine Compartment>Engine Room Main Wire>Semiconductor Power Integration ECU

Click Connector(A110)Engine Compartment>Engine Room Main Wire>Headlight ECU Sub-Assembly LH

A86-1 (L) - A110-13 (ECUB) Always Below 1 Ω
A86-1 (L) - Body ground Always 10 kΩ or higher
A110-13(ECUB) - Body ground Always 10 kΩ or higher



Result:
Proceed to
OK
NG



OK

16.CHECK HARNESS AND CONNECTOR (POWER SOURCE -SEMICONDUCTOR POWER INTEGRATION ECU)

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

16.CHECK HARNESS AND CONNECTOR (POWER SOURCE -SEMICONDUCTOR POWER INTEGRATION ECU)
a.

Measure the voltage according to the value(s) in the table below.

Standard Voltage:
Tester Connection Condition Specified Condition

Click Location & Routing(A85)Location & Routing

Click Connector(A85)Engine Compartment>Engine Room Main Wire>Semiconductor Power Integration ECU

A85-1 (+B) - Body ground Ignition switch off 11 to 14 V



Result:
Proceed to
OK
NG



OK

17.CHECK HARNESS AND CONNECTOR (SEMICONDUCTOR POWER INTEGRATION ECU - POWER DISTRIBUTION BOX ASSEMBLY)

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

17.CHECK HARNESS AND CONNECTOR (SEMICONDUCTOR POWER INTEGRATION ECU - POWER DISTRIBUTION BOX ASSEMBLY)

Pre-procedure1

a.

Disconnect the 4D power distribution box assembly connector.


Procedure1

a.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition

Click Location & Routing(A86)Location & Routing

Click Connector(A86)Engine Compartment>Engine Room Main Wire>Semiconductor Power Integration ECU

A86-24 (-S) - 4D-6 Always Below 1 Ω
A86-24 (-S) - Body ground Always 10 kΩ or higher
4D-6 - Body ground Always 10 kΩ or higher


Result:
Proceed to
OK
NG



Post-procedure1

a.

None



OK

18.INSPECT POWER DISTRIBUTION BOX ASSEMBLY

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

18.INSPECT POWER DISTRIBUTION BOX ASSEMBLY

Pre-procedure1

a.

Remove the main body ECU (multiplex network body ECU) from the power distribution box assembly.

HINT:

for LHD: Click herePower Source / Network>POWER DISTRIBUTION>MAIN BODY ECU (for LHD)>REMOVAL

for RHD: Click herePower Source / Network>POWER DISTRIBUTION>MAIN BODY ECU (for RHD)>REMOVAL



Procedure1

a.

Measure the resistance according to the value(s) in the table below.

E444782C10
1.615,0.229 1.99,0.479 0.375,0.25 4.656,0.427 5.031,0.677 0.375,0.25 4.104,1.281 4.365,0.948 false 0.229,0.198 0.542,0.396 0.313,0.198 10 false *a 1.719,0.26 2.031,0.458 0.313,0.198 10 false 4D 4.74,0.469 5.052,0.667 0.313,0.198 10 false MB 3.969,1.313 4.5,1.542 0.531,0.229 10 false HRLY
*a Component without harness connected
(Power Distribution Box Assembly)
- -


Standard Resistance:
Tester Connection Condition Specified Condition
4D-6 - MB-8 (HRLY) Always Below 1 Ω


Result:
Proceed to
OK
NG



Post-procedure1

a.

None



OK

NG