44785
1.INSTALL BRAKE BOOSTER GASKET
Install a new brake booster gasket to the brake booster assembly.
44610
2.INSTALL BRAKE BOOSTER ASSEMBLY
Temporarily install the brake booster assembly to the vehicle.
Do not apply excessive force to the brake lines or refrigerant lines.
Return the front No. 1 brake tube and front No. 2 brake tube to their original positions.
Do not apply excessive force to the brake tubes.
Temporarily install the lock nut and brake master cylinder push rod clevis to the brake booster assembly.
Fully tighten the lock nut when adjusting the brake pedal height.
Install the 4 nuts to secure the brake booster assembly.
Tighten the 4 nuts in the order shown in the illustration.
Remove the protective tape.
w/ Vacuum Warning Switch:
Connect the vacuum warning switch connector.
w/ Vacuum Sensor:
Connect the vacuum sensor connector.
3.INSTALL BRAKE LINE (for G16E-GTS)
Engage the 6 clamps to install the 2 new No. 1 brake tube clamps to the brake lines.
Engage the clamp to install a new No. 2 brake tube clamp to the vehicle body.
Engage the 3 clamps to install the brake lines to the No. 2 brake tube clamp.
| *a | Torque Wrench Fulcrum Length |
Engage the 10 clamps to install 2 new No. 4 brake tube clamps to the brake lines.
Temporarily install the front No. 1 brake tube and front No. 2 brake tube to the correct position on the brake actuator assembly.
Using a union nut wrench, tighten the front No. 1 brake tube and front No. 2 brake tube.
Do not kink or damage the brake lines.
Do not allow the brake lines to twist or interfere with other parts or the vehicle body during tightening.
Do not allow any foreign matter such as dirt or dust to enter the brake lines from the connecting parts.
Calculate the torque wrench reading when changing the fulcrum length of the torque wrench.
Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>PRECAUTION
When using a union nut wrench (fulcrum length of 20 mm (0.787 in.)) + torque wrench (fulcrum length of 162 mm (6.38 in.)): 17.4 N*m (177 kgf*cm, 13 ft.*lbf)
4.INSTALL BRAKE LINE (except G16E-GTS)
Engage the 6 clamps to install the 2 new No. 1 brake tube clamps to the brake lines.
Engage the clamp to install a new No. 2 brake tube clamp to the vehicle body.
Engage the 3 clamps to install the brake lines to the No. 2 brake tube clamp.
for Manual Transaxle:
Engage the clamp to install the clutch master cylinder to flexible hose tube to the No. 2 brake tube clamp.
| *a | Torque Wrench Fulcrum Length |
Engage the 10 clamps to install 2 new No. 5 brake tube clamps to the brake lines.
Temporarily install the front No. 1 brake tube and front No. 2 brake tube to the correct position on the brake actuator assembly.
Using a union nut wrench, tighten the front No. 1 brake tube and front No. 2 brake tube.
Do not kink or damage the brake lines.
Do not allow the brake lines to twist or interfere with other parts or the vehicle body during tightening.
Do not allow any foreign matter such as dirt or dust to enter the brake lines from the connecting parts.
Calculate the torque wrench reading when changing the fulcrum length of the torque wrench.
Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>PRECAUTION
When using a union nut wrench (fulcrum length of 20 mm (0.787 in.)) + torque wrench (fulcrum length of 162 mm (6.38 in.)): 17.4 N*m (177 kgf*cm, 13 ft.*lbf)
44750
5.INSTALL VACUUM HOSE ASSEMBLY (for G16E-GTS)
Install the vacuum hose assembly with the 3 nuts.
| *a | Paint Mark |
Connect the brake booster hose to the brake booster assembly and slide the clip to secure it.
When connecting the check valve to connector tube hose, make sure that the paint mark is facing the front of the vehicle.
Make sure that the tabs of the clip are facing the front of the vehicle.
44772
6.CONNECT CHECK VALVE TO CONNECTOR TUBE HOSE (except G16E-GTS)
for M15A-FKS:
| *a | Paint Mark |
Connect the check valve to connector tube hose to the brake booster assembly and slide the clip to secure it.
When connecting the check valve to connector tube hose, face the paint mark up.
Make sure that the tabs of the clip are facing upward.
for 1KR-FE:
| *a | Paint Mark |
Connect the check valve to connector tube hose to the brake booster assembly and slide the clip to secure it.
When connecting the check valve to connector tube hose, make sure that the paint mark is facing the front of the vehicle.
Make sure that the tabs of the clip are facing the front of the vehicle.
88710E
7.INSTALL AIR CONDITIONING TUBE AND ACCESSORY ASSEMBLY (for G16E-GTS)
Engage the 2 clamps to install the air conditioning tube and accessory assembly.
Remove the vinyl tape from the air conditioning tube and accessory assembly.
Apply sufficient compressor oil to 2 new O-rings and fitting surface of the air conditioning tube and accessory assembly.
HFC-134a(R134a):
ND-OIL 8 or equivalent
HFO-1234yf(R1234yf):
ND-OIL 12 or equivalent
Install the 2 O-rings to the air conditioning tube and accessory assembly.
Keep the O-ring and O-ring fitting surface free of foreign matter.
Connect the air conditioning tube and accessory assembly.
Rotate the hook connector as shown in the illustration.
Insert the hose joint into the fitting hole securely and install the bolt.
88710E
8.INSTALL AIR CONDITIONING TUBE AND ACCESSORY ASSEMBLY (for 1KR-FE)
Engage the clamp to install the air conditioning tube and accessory assembly.
Remove the vinyl tape from the air conditioning tube and accessory assembly.
Apply sufficient compressor oil to 2 new O-rings and fitting surface of the air conditioning tube and accessory assembly.
HFC-134a(R134a):
ND-OIL 8 or equivalent
HFO-1234yf(R1234yf):
ND-OIL 12 or equivalent
Install the 2 O-rings to the air conditioning tube and accessory assembly.
Keep the O-ring and O-ring fitting surface free of foreign matter.
Connect the air conditioning tube and accessory assembly.
Rotate the hook connector as shown in the illustration.
Insert the hose joint into the fitting hole securely and install the bolt.
55225C
9.INSTALL DASH PANEL HEAT INSULATOR (for M15A-FKS)
Temporarily install the dash panel heat insulator to the vehicle body with the 2 nuts (B).
Install the nut (A).
Tighten the 2 nuts (B).
51451A
10.INSTALL CENTER ENGINE UNDER COVER (for M15A-FKS)
164A2
11.INSTALL RESERVE SEALED TANK (for G16E-GTS)
Install the reserve sealed tank with the 2 bolts.
12601B
12.INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY (for G16E-GTS)
47264A
13.INSTALL PUSH ROD PIN
47101A
14.INSTALL BRAKE PEDAL RETURN SPRING
87211
15.INSTALL NO. 1 AIR DUCT
55606
16.INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY
17.INSTALL BATTERY
for M15A-FKS:
Click hereGeneral>MAINTENANCE>M15A-FKS AUXILIARY BATTERY>INSTALLATION
for 1KR-FE:
Click hereGeneral>MAINTENANCE>1KR-FE AUXILIARY BATTERY>INSTALLATION
47201
18.INSTALL BRAKE MASTER CYLINDER SUB-ASSEMBLY
for TMC Made:
Click hereBrake>BRAKE SYSTEM (OTHER)>BRAKE MASTER CYLINDER (for Gasoline Model TMC Made RHD)>INSTALLATION
for TMMF Made:
Click hereBrake>BRAKE SYSTEM (OTHER)>BRAKE MASTER CYLINDER (for Gasoline Model TMMF Made RHD)>INSTALLATION
19.CHARGE AIR CONDITIONING SYSTEM WITH REFRIGERANT (for 1KR-FE, G16E-GTS)
for HFC-134a(R134a):
Click hereVehicle Interior>HEATING / AIR CONDITIONING>REFRIGERANT (for HFC-134a(R134a))>REPLACEMENT
for HFO-1234yf(R1234yf):
Click hereVehicle Interior>HEATING / AIR CONDITIONING>REFRIGERANT (for HFO-1234yf(R1234yf))>REPLACEMENT
20. WARM UP ENGINE (for 1KR-FE, G16E-GTS)
for HFC-134a(R134a):
Click hereVehicle Interior>HEATING / AIR CONDITIONING>REFRIGERANT (for HFC-134a(R134a))>REPLACEMENT
for HFO-1234yf(R1234yf):
Click hereVehicle Interior>HEATING / AIR CONDITIONING>REFRIGERANT (for HFO-1234yf(R1234yf))>REPLACEMENT
21.INSPECT FOR REFRIGERANT LEAK (for 1KR-FE, G16E-GTS)
for HFC-134a(R134a):
Click hereVehicle Interior>HEATING / AIR CONDITIONING>REFRIGERANT (for HFC-134a(R134a))>REPLACEMENT
for HFO-1234yf(R1234yf):
Click hereVehicle Interior>HEATING / AIR CONDITIONING>REFRIGERANT (for HFO-1234yf(R1234yf))>REPLACEMENT
22.INSPECT AND ADJUST BRAKE PEDAL