Refer to DTC C050C1F.
| DTC No. | Detection Item | DTC Detection Condition | Trouble Area | DTC Output from |
|---|---|---|---|---|
| C050C12 | Left Rear Wheel Speed Sensor Circuit Short to Battery | The speed sensor short signal is ON continuously for 0.5 seconds or more. | ·
Rear speed sensor LH*1 ·
Rear speed sensor LH (rear axle hub and bearing assembly LH)*2 ·
Rear skid control sensor wire LH No. 1*2 ·
Wire harness and connector ·
Skid control ECU (brake actuator assembly) |
Brake |
*1: for AWD
*2: for 2WD
After replacing the skid control ECU (brake actuator assembly), perform "Calibration".
After replacing or removing and installing a speed sensor, perform Dealer Mode (Signal Check) inspection to confirm that the speed sensors are operating correctly.
Check the vehicle specification.
| Result | Proceed to |
|---|---|
| for AWD | A |
| for 2WD | B |
A
B
Pre-procedure1
Make sure that there is no looseness at the locking part and the connecting part of the connectors.
The connector is securely connected.
Disconnect the O117 rear speed sensor LH connector.
Check both the connector case and the terminals for deformation and corrosion.
No deformation or corrosion.
Pre-procedure2
Turn the ignition switch to ON.
Procedure1
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| O117-2 (RL+) - O117-1 (RL-) | Ignition switch ON | 11 to 14 V |
Post-procedure1
Turn the ignition switch off.
| Proceed to |
|---|
| OK |
| NG |
OK
Click hereBrake>BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS>REAR SPEED SENSOR (for TMC Made G16E-GTS)>REMOVAL
NG
Pre-procedure1
Make sure that there is no looseness at the locking part and the connecting part of the connectors.
The connector is securely connected.
Disconnect the A108 skid control ECU (brake actuator assembly) connector.
Check both the connector case and the terminals for deformation and corrosion.
No deformation or corrosion.
Procedure1
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| O117-1 (RL-) - Body ground | Always | Below 1.5 V |
Post-procedure1
None
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| O117-2 (RL+) or A108-29 (RL+) - O117-1 (RL-) or A108-28 (RL-) | Always | 10 kΩ or higher |
| Proceed to |
|---|
| OK |
| NG |
OK
for RHD: Click hereBrake>BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS>BRAKE ACTUATOR (for Gasoline Model TMC Made RHD)>REMOVAL
for LHD: Click hereBrake>BRAKE CONTROL / DYNAMIC CONTROL SYSTEMS>BRAKE ACTUATOR (for Gasoline Model TMC Made LHD)>REMOVAL
NG
Pre-procedure1
Make sure that there is no looseness at the locking part and the connecting part of the connectors.
The connector is securely connected.
Disconnect the j1 rear speed sensor LH (rear axle hub and bearing assembly LH) connector.
Check both the connector case and the terminals for deformation and corrosion.
No deformation or corrosion.
Pre-procedure2
Turn the ignition switch to ON.
Procedure1
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| j1-2 (RL+) - j1-1 (RL-) | Ignition switch ON | 11 to 14 V |
The rear speed sensor LH is incorporated into the rear axle hub and bearing assembly LH.
If the rear speed sensor LH needs to be replaced, replace the rear axle hub and bearing assembly LH.
Post-procedure1
Turn the ignition switch off.
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Pre-procedure1
Make sure that there is no looseness at the locking part and the connecting part of the connectors.
The connector is securely connected.
Disconnect the Oj1 skid control sensor wire LH connector.
Check both the connector case and the terminals for deformation and corrosion.
No deformation or corrosion.
Pre-procedure2
Turn the ignition switch to ON.
Procedure1
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| Oj1-1 (RL+) - Oj1-3 (RL-) | Ignition switch ON | 11 to 14 V |
Post-procedure1
Turn the ignition switch off.
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Pre-procedure1
Make sure that there is no looseness at the locking part and the connecting part of the connectors.
The connector is securely connected.
Disconnect the A36 skid control ECU (brake actuator assembly) connector.
Check both the connector case and the terminals for deformation and corrosion.
No deformation or corrosion.
Procedure1
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| Oj1-3 (RL-) - Body ground | Always | Below 1.5 V |
Post-procedure1
None
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| Oj1-1 (RL+) or A36-29 (RL+) - Oj1-3 (RL-) or A36-28 (RL-) | Always | 10 kΩ or higher |
| Proceed to |
|---|
| OK |
| NG |
OK
NG