Home › Engine / Hybrid System › 1GR-FE ENGINE MECHANICAL › ENGINE UNIT › from 2014.08
RM1440E _51 Engine / Hybrid System _056125 1GR-FE ENGINE MECHANICAL _0273884 ENGINE UNIT A

1GR-FE ENGINE MECHANICAL  ENGINE UNIT  INSTALLATION  


PROCEDURE

Hide 12311 1.INSTALL FRONT NO. 1 ENGINE MOUNTING BRACKET RH

a.

Install the front No. 1 engine mounting bracket RH with the 4 bolts.

Torque:
43 N*m (438 kgf*cm, 32 ft.*lbf)


Hide 12315 2.INSTALL FRONT NO. 1 ENGINE MOUNTING BRACKET LH

a.

Install the front No. 1 engine mounting bracket LH with the 3 bolts.

Torque:
43 N*m (438 kgf*cm, 32 ft.*lbf)


Hide 11452 3.INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE

Hide 16620 4.INSTALL V-RIBBED BELT TENSIONER ASSEMBLY

Hide 16604 5.INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY

Hide 16603 6.INSTALL NO. 1 IDLER PULLEY SUB-ASSEMBLY

Hide 16206 7.INSTALL WATER BY-PASS PIPE SUB-ASSEMBLY

Hide 23250 9.INSTALL FUEL INJECTOR ASSEMBLY

Hide 23807 10.INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY

Hide 11.INSTALL FUEL PIPE SUB-ASSEMBLY

a.

Install the fuel pipe sub-assembly with the 2 bolts.

Torque:
9.0 N*m (92 kgf*cm, 80 in.*lbf)


b.

Connect the 2 fuel pipes (See page Engine / Hybrid System>1GR-FE FUEL>FUEL SYSTEM>PRECAUTION).


Hide 11181A 12.INSTALL REAR CYLINDER HEAD COVER

Hide 19500 13.INSTALL IGNITION COIL ASSEMBLY

a.

Install the 6 ignition coil assemblies with the 6 bolts.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


Hide 25702B 14.INSTALL NO. 2 EMISSION CONTROL VALVE SET (w/ Secondary Air Injection System)

Hide 25701B 15.INSTALL NO. 1 EMISSION CONTROL VALVE SET (w/ Secondary Air Injection System)

Hide 16.INSTALL HEATER WATER HOSE ASSEMBLY

a.

Install the heater water hose assembly and connect the 2 hoses.


Hide 17.INSTALL ENGINE WIRE