Home › Engine / Hybrid System › 3SZ-VE STARTING › STARTER(for Manual Transmission) › 2011.11–2015.08
RM19Y0E _51 Engine / Hybrid System _002981 3SZ-VE STARTING _0015071 STARTER(for Manual Transmission) A

3SZ-VE STARTING  STARTER(for Manual Transmission)  INSTALLATION  


PROCEDURE

Hide 28100 1.INSTALL STARTER ASSEMBLY

a.

Install the starter assembly with the 2 bolts while inclining the transmission.

Torque:
39 N*m (398 kgf*cm, 29 ft.*lbf)

HINT:

Use a union nut wrench to tighten the lower bolt.



b.
A126518N02
0.542,1.635 1.115,2.104 0.573,0.469 10 45°

Position the engine wire as illustrated and install it with the nut.

Torque:
13 N*m (132 kgf*cm, 10 ft.*lbf)


c.

Connect the starter assembly connector.


d.

Operate the transmission jack, and then temporarily install the engine assembly with transmission.

NOTICE:

Do not raise the engine more than necessary. If the engine is raised excessively, the vehicle may also be lifted up.


HINT:
·

Make sure that the engine is clear of all wiring and hoses.

·

While raising the engine into the vehicle, do not allow it to contact the vehicle.




Hide 51022 2.INSTALL REAR ENGINE SUPPORT MEMBER SUB-ASSEMBLY

a.

Install the rear engine support member sub-assembly with the 6 bolts.

Torque:
39 N*m (398 kgf*cm, 29 ft.*lbf)


Hide 33820B 4.CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY

Hide 17410 6.INSTALL FRONT EXHAUST PIPE ASSEMBLY

Hide 37100 7.TEMPORARILY TIGHTEN PROPELLER SHAFT ASSEMBLY

Hide 11.INSPECT FOR MANUAL TRANSMISSION OIL LEAK