Home › Engine / Hybrid System › N04C-VL (FUEL) › COMMON RAIL
RM2850E _51 Engine / Hybrid System _073161 N04C-VL FUEL _0356009 COMMON RAIL A

N04C-VL FUEL  COMMON RAIL  INSTALLATION  


PROCEDURE

Hide 23810A 1.INSTALL COMMON RAIL ASSEMBLY

a.

Install the common rail assembly with the 2 bolts.

Torque:

55 N*m (561 kgf*cm, 41 ft.*lbf)



b.

Connect the fuel hose.


c.

Connect the fuel pressure sensor connector.

NOTICE:
·

Be sure to prevent foreign matter or water from entering the lines.

·

Check that the installation part has no foreign matter attached.




Hide 23811 2.INSTALL FUEL FILTER TO INJECTION PUMP FUEL PIPE

a.

Temporarily install the fuel filter to injection pump fuel pipe with the 2 union nuts.


b.
A344741E01
1.708,3.094 2.021,3.292 0.313,0.198 10 false *a

Using a union nut wrench (17 mm), tighten the union nuts.

Torque:
Specified tightening torque:

35 N*m (357 kgf*cm, 26 ft.*lbf)


Text in Illustration
*a Torque Wrench Fulcrum Length

NOTICE:

If the supply pump assembly has been replaced, the fuel filter to injection pump fuel pipe must also be replaced.


HINT:
·

Calculate the torque wrench reading when changing the fulcrum length of the torque wrench.

(Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>PRECAUTION)

·

When using a union nut wrench (fulcrum length of 30mm (1.1811 in.)) + torque wrench (fulcrum length of 180 mm (7.0866 in.)): 30 N*m (306 kgf*cm, 22 ft.*lbf)




c.

Install the pipe clamp with the nut. Tighten the nut until the clamp's edges make contact with the engine side clamp's edges.

NOTICE:
·

Be sure to prevent foreign matter or water from entering the lines.

·

Check that the installation part has no foreign matter attached.




Hide 3.INSTALL INJECTION PIPE SUB-ASSEMBLY

a.

Temporarily install the 4 injection pipe sub-assemblies with the union nuts.


b.
A344663E02
1.469,1.823 1.677,2.021 0.208,0.198 10 true *a

Using a union nut wrench (17 mm), tighten the 8 union nuts.

Torque:
Specified tightening torque:

35 N*m (357 kgf*cm, 26 ft.*lbf)


Text in Illustration
*a Torque Wrench Fulcrum Length

NOTICE:
·

If the common rail has been replaced, the injection pipe sub-assemblies must also be replaced.

·

Be sure to prevent foreign matter or water from entering the lines.

·

Check that the installation part has no foreign matter attached.



HINT:
·

Calculate the torque wrench reading when changing the fulcrum length of the torque wrench.

(Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>PRECAUTION)

·

When using a union nut wrench (fulcrum length of 30mm (1.1811 in.)) + torque wrench (fulcrum length of 180 mm (7.0866 in.)): 30 N*m (306 kgf*cm, 22 ft.*lbf)




Hide 23741B 4.INSTALL INJECTION PIPE CLAMP

a.

Install the 2 injection pipe clamps with the 2 nuts. Tighten the nut until the clamp's edges make contact with the engine side clamp's edges.


Hide 5.INSTALL NO. 2 HARNESS BRACKET

a.

Install the No. 2 harness bracket with the 2 bolts.

Torque:

29 N*m (291 kgf*cm, 21 ft.*lbf)



b.

Engage the 3 harness clamps.


Hide 17113 6.INSTALL INTAKE PIPE

a.
A345061E02
0.885,1.573 1.208,1.313 false 0.719,1.531 0.927,1.708 0.208,0.177 10 false *1

Remove any seal packing material from the contact surface.

Text in Illustration
*1 Seal Packing


b.

Apply a continuous bead of seal packing (width: 1.5 to 2.5 mm (0.06 to 0.10 in. )) as shown in the illustration.

Seal packing:

Toyota Genuine Seal Packing Black, Three Bond 1217B or equivalent


NOTICE:
·

Remove any oil from the contact surface.

·

Apply seal packing to the inner side of the bolt holes.

·

Install the intake pipe within 3 minutes, and tighten the bolts within 15 minutes of applying the seal packing.

·

Do not run the engine for at least 2 hours after installing.




c.

Install the intake pipe with the 6 bolts.

Torque:

29 N*m (291 kgf*cm, 21 ft.*lbf)



d.

Install the wire harness clamp.


Hide 7.INSTALL INTAKE PIPE WITH DIESEL THROTTLE BODY

a.
A344485E02
1.333,1.792 1.51,1.573 false 0.813,0.688 1.719,1 false 1.177,1.792 1.49,1.99 0.313,0.198 10 false *1 0.615,0.563 0.927,0.76 0.313,0.198 10 false *a

Remove any seal packing material from the contact surface.

Text in Illustration
*1 Seal Packing
*a 70 mm (2.75 in.)


b.

Apply a continuous bead of seal packing (width: 1.5 to 2.5 mm (0.06 to 0.10 in. )) as shown in the illustration.

Seal packing:

Toyota Genuine Seal Packing Black, Three Bond 1217B or equivalent


NOTICE:
·

Remove any oil from the contact surface.

·

Apply seal packing to the inner side of the bolt holes.

·

Install the intake pipe with diesel throttle body within 3 minutes, and tighten the bolts within 15 minutes of applying the seal packing.

·

Do not run the engine for at least 2 hours after installing.




c.

Install the intake pipe with diesel throttle body with the 2 nuts and 2 bolts.

Torque:

29 N*m (291 kgf*cm, 21 ft.*lbf)



d.

Connect the vacuum hose.


e.

Connect the throttle position sensor connector and the throttle control motor connector.


Hide 11409 8.INSTALL OIL LEVEL GAUGE GUIDE SUB-ASSEMBLY

a.

Install a new O-ring to the oil level gauge guide sub-assembly.


b.

Install the oil level gauge guide sub-assembly with the bolt.

Torque:

29 N*m (291 kgf*cm, 21 ft.*lbf)



Hide 44360 10.INSTALL VANE PUMP OIL RESERVOIR ASSEMBLY

a.

Install the vane pump oil reservoir assembly with the 3 bolts.

Torque:

18 N*m (184 kgf*cm, 13 ft.*lbf)



Hide 58701A 12.INSTALL FRONT ENGINE SERVICE COVER PANEL SUB-ASSEMBLY

Hide 33503F 13.INSTALL FLOOR SHIFT SHIFT LEVER SUB-ASSEMBLY

Hide 33820B 14.CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY

Hide 58286 15.INSTALL NO. 1 SHIFT AND SELECT LEVER BOOT

Hide 16.BLEED AIR FROM FUEL SYSTEM

Hide 18.INSPECT FOR OIL LEAK

Hide 53712C 20.INSTALL FRONT FENDER APRON LH

Hide 51441D 21.INSTALL NO. 1 ENGINE UNDER COVER

Hide 58534A 22.INSTALL TRANSMISSION COVER MAT

Hide 33504F 23.INSTALL SHIFT KNOB

Hide 58420 24.INSTALL NO. 2 ENGINE SERVICE HOLE COVER ASSEMBLY

Hide 58734B 25.INSTALL REAR ENGINE SERVICE COVER WEATHERSTRIP

Hide 58410 26.INSTALL ENGINE SERVICE HOLE COVER