Home › Engine / Hybrid System › N04C-VQ (EMISSION CONTROL) › EGR COOLER › from 2019.08
RM2850E _51 Engine / Hybrid System _073146 N04C-VQ EMISSION CONTROL _0355925 EGR COOLER A

N04C-VQ EMISSION CONTROL  EGR COOLER  INSTALLATION  


PROCEDURE

Hide 17505G 1.INSTALL NO. 1 EXHAUST PIPE HEAT INSULATOR SUB-ASSEMBLY

a.

Install the No. 1 exhaust pipe heat insulator sub-assembly and 3 bolts.

Torque:

29 N*m (291 kgf*cm, 21 ft.*lbf)



Hide 25608 2.INSTALL EGR COOLER SUB-ASSEMBLY

a.

Connect the No. 1 water by-pass hose and No. 2 water by-pass hose.


b.
A260339E02
0.979,3.99 1.125,4.167 0.146,0.177 10 true A 2.198,4.094 2.354,4.271 0.156,0.177 10 true A 1.74,0.083 1.885,0.26 0.146,0.177 10 false B 1.49,1.094 1.635,1.271 0.146,0.177 10 true B

Connect the water by-pass hose and reserve tank hose.


c.

Install new gasket and the EGR cooler sub-assembly with 4 bolts.

Torque:
for bolt A:

69 N*m (700 kgf*cm, 51 ft.*lbf)

for bolt B:

55 N*m (561 kgf*cm, 41 ft.*lbf)



d.

Temporarily install the EGR pipe connector to the EGR cooler sub-assembly and exhaust manifold with the 2 new gaskets, 3 spacers, 3 nuts and 2 bolts.

NOTICE:

Tighten the nuts until they contact the EGR cooler sub-assembly.



e.
A255750

Tighten the 3 nuts.

Torque:

69 N*m (700 kgf*cm, 51 ft.*lbf)



f.
A255749

Tighten the 2 bolts.

Torque:

69 N*m (700 kgf*cm, 51 ft.*lbf)



Hide 17505H 3.INSTALL NO. 2 EXHAUST PIPE HEAT INSULATOR SUB-ASSEMBLY

a.

Install the 2 bolts and the No. 2 exhaust pipe heat insulator sub-assembly.

Torque:

29 N*m (291 kgf*cm, 21 ft.*lbf)



Hide 17271 4.INSTALL NO. 4 EXHAUST PIPE HEAT INSULATOR SUB-ASSEMBLY

a.

Install the 3 bolts and the No. 4 exhaust pipe heat insulator sub-assembly.

Torque:

29 N*m (291 kgf*cm, 21 ft.*lbf)



Hide 17271 5.INSTALL NO. 3 EXHAUST PIPE HEAT INSULATOR SUB-ASSEMBLY

a.

Install the 4 bolts and the No. 3 exhaust pipe heat insulator sub-assembly.

Torque:

29 N*m (291 kgf*cm, 21 ft.*lbf)



Hide 17410 6.INSTALL FRONT EXHAUST PIPE ASSEMBLY

Hide 11409 7.INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE

a.

Install a new O-ring to the engine oil level dipstick guide.


b.

Install the engine oil level dipstick guide with the bolt.

Torque:

29 N*m (291 kgf*cm, 21 ft.*lbf)



c.

Connect the 2 wire harness clamps.


Hide 12203 8.INSTALL PCV PIPE SUB-ASSEMBLY

a.

Install the pcv pipe sub-assembly with the 2 bolts.

Torque:
28.5 N*m (291 kgf*cm, 21 ft.*lbf)


b.

Connect the No. 2 pcv hose and slide the clip to secure it.


c.

Connect the pcv hose and slide the 2 clips to secure it.


Hide 44360 9.INSTALL VANE PUMP OIL RESERVOIR ASSEMBLY

Hide 44379A 10.INSTALL NO. 2 OIL RESERVOIR BRACKET

Hide 12601B 12.INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY

Hide 17030 13.INSTALL AIR HOSE ASSEMBLY

Hide 17113D 14.INSTALL NO. 1 INTAKE PIPE

Hide 53711C 15.INSTALL FRONT FENDER APRON RH

Hide 18.INSPECT FOR EXHAUST GAS LEAK

Hide 58701A 19.INSTALL FRONT ENGINE SERVICE COVER PANEL SUB-ASSEMBLY

Hide 33506F 20.INSTALL FLOOR SHIFT CONTROL SHIFT LEVER RETAINER SUB-ASSEMBLY

Hide 58123A 21.INSTALL SHIFT AND SELECT LEVER SUPPORT WITH BOOTS

Hide 58420 22.INSTALL NO. 2 ENGINE SERVICE HOLE COVER ASSEMBLY

Hide 58734B 23.INSTALL REAR ENGINE SERVICE COVER WEATHERSTRIP

Hide 58410 24.INSTALL ENGINE SERVICE HOLE COVER

Hide 58521D 25.INSTALL ENGINE SERVICE HOLE COVER MAT