Home › Engine / Hybrid System › 2GR-FE COOLING › THERMOSTAT › 2013.04–2016.05
RM24M0E _51 Engine / Hybrid System _059551 2GR-FE COOLING _0291843 THERMOSTAT A

2GR-FE COOLING  THERMOSTAT  INSTALLATION  


PROCEDURE

Hide 16331A 1.INSTALL THERMOSTAT

a.
U145321E02
0.958,0.979 1.688,0.76 true 1.188,0.177 1.594,0.427 0.406,0.25 10 false 10° 2.021,0.135 2.427,0.385 0.406,0.25 10 false 10° 0.156,0.896 0.927,1.104 0.771,0.208 10 false Jiggle Valve

Install a new gasket to the thermostat.


b.

Install the thermostat with the jiggle valve facing up.

HINT:

The jiggle valve may be set within 10° on either side of the prescribed position.



Hide 16321 2.INSTALL WATER INLET

a.
A162796

Install the water inlet with the 2 nuts .

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


Hide 16604 3.INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY

a.
A162789

Install the idler pulley cover plate and idler pulley sub-assembly with the bolt.

Torque:
43 N*m (438 kgf*cm, 32 ft.*lbf)


Hide 16572D 4.CONNECT NO. 2 RADIATOR HOSE

a.
A162797

Connect the No. 2 radiator hose to the engine.


Hide 53701 6.INSTALL FRONT FENDER APRON RH

Hide 7.INSTALL FRONT WHEEL RH

Hide 51441 11.INSTALL NO. 1 ENGINE UNDER COVER